Project Scheduling
(CJ29)
Definition:-

Scheduling of project is done to align the dates.

The purpose of date scheduling is to determine the


duration of phases in a project, which events are
particularly important for the schedule, float times, and
critical paths.

Maintain dates in the work breakdown structures and


individual networks. It is possible to check and change
them in all stages of a project.

Note:-

Different transactions to change and display only dates


help to have control over the scheduling with different
person using authorization if required for the business
process.
Prerequisite:-

Project structure must exist with WBS and Network


Menu Path:-

SAP Menu Æ Logistics Æ Project System Æ Dates Æ


Project Scheduling – CJ29
Double click CJ29

Enter the project definition


Click

Select the object to be scheduled. E.g. Network

Click to view activity dates

Click

Click to view dates old and new

Click

Click

Click

Message appears at the bottom


SAP PS
User manual

Published by Team of
SAP Consultants
at
SAPTOPJOBS
Visit us at www.sap-topjobs.com

Copyright 2008-10@SAPTOPJOBS

All rights reserved. No part of this publication may be reproduced, stored in a retrieval
system, or transmitted in any form, or by any means electronic or mechanical
including photocopying, recording or any information storage and retrieval system
without permission in writing from SAPTOPJOBS

You might also like