Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan

Pekerjaan Persiapan
SNI-BORO
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.

6.2 1 m' Pagar sementara dari seng gelombang tinggi 2,4 meter
Bahan
Dolken kayu Dia 8-10/ 400 cm 1.250 Btg 23,000.00 = Rp. 28,750.00
Semen portland 2.500 Kg 1,250.00 = Rp. 3,125.00
Seng gelombang panjang 2,4m 1.200 Lbr 92,000.00 = Rp. 110,400.00
Pasir beton 0.005 M3 224,000.00 = Rp. 1,120.00
Koral beton 0.009 M3 192,500.00 = Rp. 1,732.50
Kayu meranti 5/7 dan 4/6 0.026 M3 3,960,000.00 = Rp. 102,960.00
Paku biasa 2" - 5" 0.060 Kg 15,000.00 = Rp. 900.00
Jumlah
Tenaga
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.020 Oh 63,600.00 = Rp. 1,272.00
Jumlah = Rp.

6.4 1 m' Pengukuran dan pemasangan bouwplank


Bahan
Kayu meranti 5/7 0.012 M3 3,960,000.00 = Rp. 47,520.00
Paku biasa 2" - 5" 0.020 Kg 15,000.00 = Rp. 300.00
Kayu papan 3/20 ( meranti ) 0.007 M3 4,180,000.00 = Rp. 29,260.00
Jumlah = Rp.
Tenaga
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah = Rp.

6.4a 1 m' Pengukuran dan pemasangan bouwplank


Bahan
Kayu meranti 5/7 0.012 M3 3,960,000.00 = Rp. 47,520.00
Paku biasa 2" - 5" 0.020 Kg 15,000.00 = Rp. 300.00
Kayu papan 3/20 ( sengon ) 0.007 M3 1,312,500.00 = Rp. 9,187.50
Jumlah = Rp.
Tenaga
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah = Rp.

6.13 1 m' Bongkaran beton bertulang


Tenaga
Pekerja 6.667 Oh 45,400.00 = Rp. 302,681.80
Mandor 0.333 Oh 63,600.00 = Rp. 21,178.80
Jumlah = Rp.

6.14 1 m3 Bongkaran dinding tembok bata merah

Tenaga
Pekerja 6.667 Oh 45,400.00 = Rp. 302,681.80
Mandor 0.033 Oh 63,600.00 = Rp. 2,098.80
Jumlah
Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan
Pekerjaan Tanah

Kode Uraian Volume Sat Harga Sat Jumlah Harga


Rp. Rp.

6.1 1 m3 Galian tanah biasa sedalam 1 meter


Tenaga
Pekerja 0.750 Oh 45,400.00 = Rp. 34,050.00
Mandor 0.025 Oh 63,600.00 = Rp. 1,590.00
Jumlah

6.2 1 m3 Galian tanah biasa sedalam 2 meter


Tenaga
Pekerja 0.900 Oh 45,400.00 = Rp. 40,860.00
Mandor 0.045 Oh 63,600.00 = Rp. 2,862.00
Jumlah = Rp.

6.3 1 m3 Galian tanah biasa sedalam 3 meter


Tenaga
Pekerja 1.050 Oh 45,400.00 = Rp. 47,670.00
Mandor 0.067 Oh 63,600.00 = Rp. 4,261.20
Jumlah = Rp.

6.4 1 m3 Galian tanah keras sedalam 1 meter


Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Mandor 0.032 Oh 63,600.00 = Rp. 2,035.20
Jumlah = Rp.

6.5 1 m3 Galian tanah cadas sedalam 1 meter


Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Mandor 0.060 Oh 63,600.00 = Rp. 3,816.00
Jumlah = Rp.

6.6 1 m3 Galian tanah lumpur sedalam 1 meter


Tenaga
Pekerja 1.200 Oh 45,400.00 = Rp. 54,480.00
Mandor 0.045 Oh 63,600.00 = Rp. 2,862.00
Jumlah = Rp.

6.7 1 m2 stripping tebing setinggi 1 meter


Tenaga
Pekerja 0.050 Oh 45,400.00 = Rp. 2,270.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah = Rp.

6.8 1 m3 Pembuangan tanah sejauh 30 meter


Tenaga
Pekerja 0.330 Oh 45,400.00 = Rp. 14,982.00
Mandor 0.010 Oh 63,600.00 = Rp. 636.00
Jumlah = Rp.
6.9 1 m3 Urugan kembali
Tenaga
Pekerja 0.2500 Oh 45,400.00 = Rp. 11,350.00
Mandor 0.0083 Oh 63,600.00 = Rp. 530.00
Jumlah
6.10 1 m3 Pemadatan tanah ( per 20 cm )
Tenaga
Pekerja 0.500 Oh 45,400.00 = Rp. 22,700.00
Mandor 0.050 Oh 63,600.00 = Rp. 3,180.00
Jumlah = Rp.
6.11 1 m3 Urugan pasir
Bahan
Pasir Urug 1.200 M3 95,000.00 = Rp. 114,000.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Mandor 0.010 Oh 63,600.00 = Rp. 636.00
Jumlah
6.14 1 m2 Pemasangan lapisan ijuk tebal 10 cm
Bahan
Ijuk 6.000 kg 15,200.00 = Rp. 91,200.00
Jumlah
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah
6.15 1 m3 Urugan sirtu padat
Bahan
Sirtu 1.200 M3 125,000.00 = Rp. 150,000.00
Jumlah
Tenaga
Pekerja 0.250 Oh 45,400.00 = Rp. 11,350.00
Mandor 0.025 Oh 63,600.00 = Rp. 1,590.00
Jumlah
Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan
Pekerjaan Pondasi
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.
6.1 1 m3 Pasang pondasi batu belah 1 Pc : 3 PP
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Semen portland 202.000 Kg 1,250.00 = Rp. 252,500.00
Pasir pasang 0.485 M3 195,000.00 = Rp. 94,575.00
Jumlah
Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Tukang batu 0.750 Oh 59,000.00 = Rp. 44,250.00
Kepala tukang 0.075 Oh 63,600.00 = Rp. 4,770.00
Mandor 0.075 Oh 63,600.00 = Rp. 4,770.00
Jumlah
6.2 1 m3 Pasang pondasi batu belah 1 Pc : 4 PP
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Semen portland 163.000 Kg 1,250.00 = Rp. 203,750.00
Pasir pasang 0.520 M3 195,000.00 = Rp. 101,400.00
Jumlah
Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Tukang batu 0.750 Oh 59,000.00 = Rp. 44,250.00
Kepala tukang 0.075 Oh 63,600.00 = Rp. 4,770.00
Mandor 0.075 Oh 63,600.00 = Rp. 4,770.00
Jumlah
6.3 1 m3 Pasang pondasi batu belah 1 Pc : 5 PP
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Semen portland 136.000 Kg 1,250.00 = Rp. 170,000.00
Pasir pasang 0.544 M3 195,000.00 = Rp. 106,080.00
Jumlah
Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Tukang batu 0.750 Oh 59,000.00 = Rp. 44,250.00
Kepala tukang 0.075 Oh 63,600.00 = Rp. 4,770.00
Mandor 0.075 Oh 63,600.00 = Rp. 4,770.00
Jumlah
6.7 1 m3 Pasang pondasi batu belah 1 Pc : 3 KP : 10 PP
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Semen portland 61.000 Kg 1,250.00 = Rp. 76,250.00
Kapur pasang 0.147 M3 250,000.00 = Rp. 36,750.00
Pasir pasang 0.492 M3 195,000.00 = Rp. 95,940.00
Jumlah
Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Tukang batu 0.750 Oh 59,000.00 = Rp. 44,250.00
Kepala tukang 0.075 Oh 63,600.00 = Rp. 4,770.00
Mandor 0.075 Oh 63,600.00 = Rp. 4,770.00
Jumlah
6.9 1 m3 Pasang pondasi batu kosong (aanstamping)
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Pasir urug 0.432 M3 95,000.00 = Rp. 41,040.00
Jumlah
Tenaga
Pekerja 0.780 Oh 45,400.00 = Rp. 35,412.00
Tukang batu 0.390 Oh 59,000.00 = Rp. 23,010.00
Kepala tukang 0.039 Oh 63,600.00 = Rp. 2,480.40
Mandor 0.039 Oh 63,600.00 = Rp. 2,480.40
Jumlah
6.11 1 m3 Pasang pondasi sumuran, diameter 100 cm
Bahan
Batu belah 15/20 cm 0.450 M3 175,000.00 = Rp. 78,750.00
Semen portland 194.000 Kg 1,250.00 = Rp. 242,500.00
Pasir Beton 0.312 M3 224,000.00 = Rp. 69,888.00
Koral Beton 0.468 M3 192,500.00 = Rp. 90,090.00
Jumlah
Tenaga
Pekerja 2.400 Oh 45,400.00 = Rp. 108,960.00
Tukang batu 0.800 Oh 59,000.00 = Rp. 47,200.00
Kepala tukang 0.080 Oh 63,600.00 = Rp. 5,088.00
Mandor 0.119 Oh 63,600.00 = Rp. 7,568.40
Jumlah
Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan
Pekerjaan Dinding
Kode Uraian Koefisien Sat Harga Sat Jumlah Harga
Rp. Rp.
6.2 1 m2 Pasangan bata merah tebal 1 bata 1 Pc : 3 PP
Bahan
Bata merah 5 x 11 x 22 cm 140.000 Bh 880.00 = Rp. 123,200.00
Semen portland 32.950 Kg 1,250.00 = Rp. 41,187.50
Pasir pasang 0.091 M3 195,000.00 = Rp. 17,745.00
Jumlah
Tenaga
Pekerja 0.600 Oh 45,400.00 = Rp. 27,240.00
Tukang batu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.030 Oh 63,600.00 = Rp. 1,908.00
Jumlah
6.3 1 m2 Pasangan bata merah tebal 1 bata 1 Pc : 4 PP
Bahan
Bata merah 5 x 11 x 22 cm 140.000 Bh 880.00 = Rp. 123,200.00
Semen portland 26.550 Kg 1,250.00 = Rp. 33,187.50
Pasir pasang 0.093 M3 195,000.00 = Rp. 18,135.00
Jumlah
Tenaga
Pekerja 0.600 Oh 45,400.00 = Rp. 27,240.00
Tukang batu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.030 Oh 63,600.00 = Rp. 1,908.00
Jumlah

6.6 1 m2 Pasangan bata merah tebal 1 bata 1 Pc : 3 Kp :10 PP


Bahan
Bata merah 5 x 11 x 22 cm 140.000 Bh 880.00 = Rp. 123,200.00
Semen portland 10.080 Kg 1,250.00 = Rp. 12,600.00
Pasir pasang 0.0925 M3 195,000.00 = Rp. 18,037.50
Kapur pasang 0.0275 M3 250,000.00 = Rp. 6,875.00
Jumlah
Tenaga
Pekerja 0.600 Oh 45,400.00 = Rp. 27,240.00
Tukang batu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.030 Oh 63,600.00 = Rp. 1,908.00
Jumlah

6.8 1 m2 Pasangan bata merah tebal 1/2 bata 1 Pc : 3 PP


Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh 880.00 = Rp. 61,600.00
Semen portland 14.370 Kg 1,250.00 = Rp. 17,962.50
Pasir pasang 0.0400 M3 195,000.00 = Rp. 7,800.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah
6.9 1 m2 Pasangan bata merah tebal 1/2 bata 1 Pc : 4 Ps
Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh 880.00 = Rp. 61,600.00
Semen portland 11.500 Kg 1,250.00 = Rp. 14,375.00
Pasir pasang 0.0430 M3 195,000.00 = Rp. 8,385.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah

6.13 1 m2 Pasangan bata merah tebal 1/2 bata 1 Pc : 3 Kp : 10 Ps


Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh 880.00 = Rp. 61,600.00
Semen portland 4.500 Kg 1,250.00 = Rp. 5,625.00
Pasir pasang 0.0500 M3 195,000.00 = Rp. 9,750.00
Kapur pasang 0.015 M3 250,000.00 = Rp. 3,750.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah
6.23 1 m2 Pasang dinding roster/ terawang ( 12 x 11 x 24 ) cm, 1 Pc : 4 PP
Bahan
Roster / terawang 30.000 Bh 6,000.00 = Rp. 180,000.00
semen portland 11.000 Kg 1,250.00 = Rp. 13,750.00
Pasir pasang 0.035 M3 195,000.00 = Rp. 6,825.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah

dihitung 1 m2 Pasang dinding roster beton (20x20) cm, 1 Pc : 4 PP


Bahan
Roster beton 21.000 Bh 5,500.00 = Rp. 115,500.00
semen portland 11.000 Kg 1,250.00 = Rp. 13,750.00
Pasir pasang 0.035 M3 195,000.00 = Rp. 6,825.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah

dihitung 1 m2 Pasang dinding roster gerabah (10x20) cm, 1 Pc : 4 PP


Bahan
Roster gerabah 10x20 cm 45.000 Bh 6,000.00 = Rp. 270,000.00
semen portland 11.000 Kg 1,250.00 = Rp. 13,750.00
Pasir pasang 0.035 M3 195,000.00 = Rp. 6,825.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah

dihitung 1 m2 Pasang dinding roster gerabah (25x25) cm, 1 Pc : 4 PP


Bahan
Roster gerabah 25x25 cm 14.000 Bh 10,450.00 = Rp. 146,300.00
semen portland 11.000 Kg 1,250.00 = Rp. 13,750.00
Pasir pasang 0.035 M3 195,000.00 = Rp. 6,825.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah
Analisa Biaya Konstruksi ( ABK ) bangunan Gedung dan Perumahan
Pekerjaan plesteran

Kode Uraian Koefisien Sat Harga Sat Jumlah Harga


Rp. Rp.

6.3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm


Bahan
semen portland 7.776 Kg 1,250.00 = Rp. 9,720.00
Pasir pasang 0.023 M3 195,000.00 = Rp. 4,485.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.150 Oh 59,000.00 = Rp. 8,850.00
Kepala tukang 0.015 Oh 63,600.00 = Rp. 954.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah

6.4 1 m2 Plesteran 1 Pc : 4 Ps, tebal : 15 mm


Bahan
semen portland 6.240 Kg 1,250.00 = Rp. 7,800.00
Pasir pasang 0.024 M3 195,000.00 = Rp. 4,680.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.150 Oh 59,000.00 = Rp. 8,850.00
Kepala tukang 0.015 Oh 63,600.00 = Rp. 954.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah

6.5 1 m2 Plesteran 1 Pc : 5 Ps, tebal : 15 mm


Bahan
semen portland 5.184 Kg 1,250.00 = Rp. 6,480.00
Pasir pasang 0.026 M3 195,000.00 = Rp. 5,070.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.150 Oh 59,000.00 = Rp. 8,850.00
Kepala tukang 0.015 Oh 63,600.00 = Rp. 954.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah

6.10 1 m2 Plesteran 1 Pc : 2 Kp : 8 Ps, tebal : 15 mm


Bahan
semen portland 3.000 Kg 1,250.00 = Rp. 3,750.00
Kapur padam 0.005 M3 250,000.00 = Rp. 1,250.00
Pasir pasang 0.020 M3 195,000.00 = Rp. 3,900.00
Jumlah
Tenaga
Pekerja 0.360 Oh 45,400.00 = Rp. 16,344.00
Tukang batu 0.120 Oh 59,000.00 = Rp. 7,080.00
Kepala tukang 0.012 Oh 63,600.00 = Rp. 763.20
Mandor 0.018 Oh 63,600.00 = Rp. 1,144.80
Jumlah

6.20 1 m' Plesteran skoning 1 Pc : 2 Ps, lebar 10 mm


Bahan
semen Portland 0.500 Kg 1,250.00 = Rp. 625.00
Pasir pasang 0.013 M3 195,000.00 = Rp. 2,535.00
Jumlah
Tenaga
Pekerja 0.080 Oh 45,400.00 = Rp. 3,632.00
Tukang batu 0.040 Oh 59,000.00 = Rp. 2,360.00
Kepala tukang 0.040 Oh 63,600.00 = Rp. 2,544.00
Mandor 0.004 Oh 63,600.00 = Rp. 254.40
Jumlah
6.23 1 m2 Plesteran ciprat. 1 Pc : 2 Ps
Bahan
Semen Portland 4.320 Kg 1,250.00 = Rp. 5,400.00
Pasir Pasang 0.006 M3 195,000.00 = Rp. 1,170.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah

6.26 1 m2 Finishing Siar adukan 1 PC : 2 PS.


Bahan
Semen Portland 6.340 Kg 1,250.00 = Rp. 7,925.00
Pasir Pasang 0.012 M3 195,000.00 = Rp. 2,340.00
Jumlah
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.150 Oh 59,000.00 = Rp. 8,850.00
Kepala tukang 0.015 Oh 63,600.00 = Rp. 954.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah

6.27 1 m2 acian
Bahan
Semen Portland 3.250 Kg 1,250.00 = Rp. 4,062.50
Jumlah
Tenaga
Pekerja 0.200 Oh 45,400.00 = Rp. 9,080.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.010 Oh 63,600.00 = Rp. 636.00
Jumlah

Analisa biaya konstruksi ( ABK ) Bangunan Gedung dan Perumahan


Pekerjaan kayu
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.

6.1 1 m3 Pasang kusen pintu dan jendela kayu jati kelas plitur
Bahan
Kayu jati, balok 1.100 M3 20,872,500.00 = Rp. 22,959,750.00
Paku 1.250 kg 15,000.00 = Rp. 18,750.00
Lem kayu 1.000 kg 14,300.00 = Rp. 14,300.00
Jumlah
Tenaga
Pekerja 7.000 Oh 45,400.00 = Rp. 317,800.00
Tukang kayu 21.000 Oh 59,000.00 = Rp. 1,239,000.00
Kepala tukang 2.100 Oh 63,600.00 = Rp. 133,560.00
Mandor 0.350 Oh 63,600.00 = Rp. 22,260.00
Jumlah
6.1a 1 m3 Pasang kusen pintu dan jendela kayu jati kualitas cat
Bahan
Kayu jati, balok 1.100 M3 15,100,000.00 = Rp. 16,610,000.00
Paku 1.250 kg 15,000.00 = Rp. 18,750.00
Lem kayu 1.000 kg 14,300.00 = Rp. 14,300.00
Jumlah
Tenaga
Pekerja 7.000 Oh 45,400.00 = Rp. 317,800.00
Tukang kayu 21.000 Oh 59,000.00 = Rp. 1,239,000.00
Kepala tukang 2.100 Oh 63,600.00 = Rp. 133,560.00
Mandor 0.350 Oh 63,600.00 = Rp. 22,260.00
Jumlah
6.2 1 m3 Pasang kusen pintu dan jendela kayu kamper
Bahan
Kayu kamper, balok 1.200 M3 9,350,000.00 = Rp. 11,220,000.00
Paku 1.250 kg 15,000.00 = Rp. 18,750.00
Lem kayu 1.000 kg 14,300.00 = Rp. 14,300.00
Jumlah
Tenaga
Pekerja 6.000 Oh 45,400.00 = Rp. 272,400.00
Tukang kayu 18.000 Oh 59,000.00 = Rp. 1,062,000.00
Kepala tukang 1.800 Oh 63,600.00 = Rp. 114,480.00
Mandor 0.300 Oh 63,600.00 = Rp. 19,080.00
Jumlah
6.10 1 m2 Pasang Jalusi Kusen Kayu Kamfer
Bahan
Kayu kamper, papan 0.060 M3 9,900,000.00 = Rp. 594,000.00
Paku 0.150 kg 15,000.00 = Rp. 2,250.00
Jumlah
Tenaga
Pekerja 0.670 Oh 45,400.00 = Rp. 30,418.00
Tukang kayu 2.000 Oh 59,000.00 = Rp. 118,000.00
Kepala tukang 0.200 Oh 63,600.00 = Rp. 12,720.00
Mandor 0.335 Oh 63,600.00 = Rp. 21,306.00
Jumlah
6.5 1 m2 Pasang pintu panel kayu jati klas plitur
Bahan
Kayu jati, papan 0.040 M3 20,872,500.00 = Rp. 834,900.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh 63,600.00 = Rp. 3,180.00
Jumlah
6.5a 1 m2 Pasang pintu panel kayu jati klas cat
Bahan
Kayu jati, papan 0.040 M3 15,100,000.00 = Rp. 604,000.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh 63,600.00 = Rp. 3,180.00
Jumlah
6.5b 1 m2 Pasang pintu panel kayu kamfer
Bahan
Kayu kamfer, papan 0.040 M3 9,900,000.00 = Rp. 396,000.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh 63,600.00 = Rp. 3,180.00
6.6 1 m2 Pasang pintu dan jendela kaca kayu jati klas plitur
Bahan
Kayu jati, papan 0.024 M3 20,872,500.00 = Rp. 500,940.00
Lem kayu 0.300 kg 14,300.00 = Rp. 4,290.00
Jumlah
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh 63,600.00 = Rp. 2,544.00
Jumlah
6.6a 1 m2 Pasang pintu dan jendela kaca kayu jati klas cat
Bahan
Kayu jati, papan 0.024 M3 15,100,000.00 = Rp. 362,400.00
Lem kayu 0.300 kg 14,300.00 = Rp. 4,290.00
Jumlah
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh 63,600.00 = Rp. 2,544.00
Jumlah
6.6b 1 m2 Pasang pintu dan jendela kaca kayu kamfer
Bahan
Kayu kamfer, papan 0.024 M3 9,900,000.00 = Rp. 237,600.00
Lem kayu 0.300 kg 14,300.00 = Rp. 4,290.00
Jumlah
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh 63,600.00 = Rp. 2,544.00
Jumlah
6.7 1 m2 Pasang pintu dan jendela jalusi kayu jati klas plitur
Bahan
Kayu jati, papan 0.064 M3 20,872,500.00 = Rp. 1,335,840.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh 63,600.00 = Rp. 3,180.00
Jumlah
6.7a 1 m2 Pasang pintu dan jendela jalusi kayu jati klas cat
Bahan
Kayu jati, papan 0.064 M3 15,100,000.00 = Rp. 966,400.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh 63,600.00 = Rp. 3,180.00
Jumlah
6.7b 1 m2 Pasang pintu dan jendela jalusi kayu kamfer
Bahan
Kayu kamfer, papan 0.064 M3 9,900,000.00 = Rp. 633,600.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh 63,600.00 = Rp. 3,180.00
6.9 1 m2 Pasang pintu plywood rangkap rangka ekspose kayu jati klas plitur
Bahan
Kayu jati, papan 0.0256 M3 20,872,500.00 = Rp. 534,336.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.500 Lt 14,300.00 = Rp. 7,150.00
Plywood 90cm x 220cm x 4mm 1.000 Lbr 66,000.00 = Rp. 66,000.00
Jumlah
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh 63,600.00 = Rp. 2,544.00
Jumlah

6.9a 1 m2 Pasang pintu plywood rangkap rangka ekspose kayu jati klas cat
Bahan
Kayu jati, papan 0.0256 M3 15,100,000.00 = Rp. 386,560.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.500 Lt 14,300.00 = Rp. 7,150.00
Plywood 90cm x 220cm x 4mm 1.000 Lbr 66,000.00 = Rp. 66,000.00
Jumlah
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh 63,600.00 = Rp. 2,544.00
Jumlah
6.9b 1 m2 Pasang pintu plywood rangkap rangka ekspose kayu kamfer
Bahan
Kayu kamfer, papan 0.0256 M3 9,900,000.00 = Rp. 253,440.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.500 Lt 14,300.00 = Rp. 7,150.00
Plywood 90cm x 220cm x 4mm 1.000 Lbr 66,000.00 = Rp. 66,000.00
Jumlah
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh 63,600.00 = Rp. 2,544.00
Jumlah
6.11 1 m2 Pasang pintu teakwood rangkap rangka kayu jati klas plitur
Bahan
Kayu jati, papan 0.025 M3 20,872,500.00 = Rp. 521,812.50
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.300 Lt 14,300.00 = Rp. 4,290.00
Teakwood 4' x 8' x 4' mm 1.000 Lbr 93,500.00 = Rp. 93,500.00
Jumlah
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh 63,600.00 = Rp. 2,544.00
Jumlah
6.11a 1 m2 Pasang pintu teakwood rangkap rangka kayu jati klas cat
Bahan
Kayu jati, papan 0.025 M3 15,100,000.00 = Rp. 377,500.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.300 Lt 14,300.00 = Rp. 4,290.00
Teakwood 4' x 8' x 4' mm 1.000 Lbr 93,500.00 = Rp. 93,500.00
Jumlah
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh 63,600.00 = Rp. 2,544.00
Jumlah
6.11b 1 m2 Pasang pintu teakwood rangkap rangka kayu kamfer
Bahan
Kayu kamfer, papan 0.0250 M3 9,900,000.00 = Rp. 247,500.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.300 Lt 14,300.00 = Rp. 4,290.00
Teakwood 4' x 8' x 4' mm 1.000 Lbr 93,500.00 = Rp. 93,500.00
Jumlah
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh 63,600.00 = Rp. 2,544.00
Jumlah
6.13 1 m3 Pasang konstruksi kuda - kuda kayu bangkirai
Bahan
Kayu bangkirai, balok 1.100 M3 9,900,000.00 = Rp. 10,890,000.00
Besi strip 15.000 Kg 15,400.00 = Rp. 231,000.00
Paku biasa 12 cm 5.600 Kg 15,000.00 = Rp. 84,000.00
Jumlah
Tenaga
Pekerja 4.000 Oh 45,400.00 = Rp. 181,600.00
Tukang kayu 12.000 Oh 59,000.00 = Rp. 708,000.00
Kepala tukang 1.200 Oh 63,600.00 = Rp. 76,320.00
Mandor 0.200 Oh 63,600.00 = Rp. 12,720.00
Jumlah

6.13b 1 m3 Pasang konstruksi kuda - kuda kayu Kruing


Bahan
Kayu kruing, balok 1.100 M3 7,653,000.00 = Rp. 8,418,300.00
Besi strip 15.000 Kg 15,400.00 = Rp. 231,000.00
Paku biasa 12 cm 5.600 Kg 15,000.00 = Rp. 84,000.00
Jumlah
Tenaga
Pekerja 4.000 Oh 45,400.00 = Rp. 181,600.00
Tukang kayu 12.000 Oh 59,000.00 = Rp. 708,000.00
Kepala tukang 1.200 Oh 63,600.00 = Rp. 76,320.00
Mandor 0.200 Oh 63,600.00 = Rp. 12,720.00
Jumlah

6.15 1 m3 Pasang konstruksi gording kayu bangkirai


Bahan
Kayu bangkirai, balok 1.100 M3 9,900,000.00 = Rp. 10,890,000.00
Besi strip 15.000 Kg 15,400.00 = Rp. 231,000.00
Paku biasa 12 cm 3.000 Kg 15,000.00 = Rp. 45,000.00
Jumlah
Tenaga
Pekerja 2.400 Oh 45,400.00 = Rp. 108,960.00
Tukang kayu 7.200 Oh 59,000.00 = Rp. 424,800.00
Kepala tukang 0.720 Oh 63,600.00 = Rp. 45,792.00
Mandor 0.120 Oh 63,600.00 = Rp. 7,632.00
Jumlah

6.31 1 m2 Pasang rangka atap genteng keramik kayu kamfer


Bahan
Kayu kamfer 0.012 M3 9,350,000.00 = Rp. 112,200.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Jumlah
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah
6.31a 1 m2 Pasang rangka atap seng/asbes gelombang
Bahan
Kayu kamfer 0.008 M3 9,350,000.00 = Rp. 76,670.00
Paku biasa 2" - 5" 0.050 Kg 15,000.00 = Rp. 750.00
Jumlah
Tenaga
Pekerja 0.050 Oh 45,400.00 = Rp. 2,270.00
Tukang kayu 0.050 Oh 59,000.00 = Rp. 2,950.00
Kepala tukang 0.005 Oh 63,600.00 = Rp. 318.00
Mandor 0.002 Oh 63,600.00 = Rp. 127.20
Jumlah
6.32 1 m2 Pasang rangka atap genteng keramik kayu bangkirai
Bahan
Kayu bangkirai, balok 0.012 M3 9,900,000.00 = Rp. 118,800.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Jumlah
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah
6.35 1 m2 Pasang rangka atap genteng beton kayu bangkirai
Bahan
Kayu bangkirai, balok 0.014 M3 9,900,000.00 = Rp. 138,600.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Jumlah
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah
6.39 1 m2 Pasang rangka Langit-langit ( 1 x 1 ) m kayu kamfer
Bahan :
Kayu kamfer, balok 0.012 m3 9,350,000.00 =Rp. 112,200.00
Paku biasa 2-5" 0.100 Kg 15,000.00 =Rp. 1,500.00

Tenaga
Pekerja 0.150 Oh 45,400.00 =Rp. 6,810.00
Tukang kayu 0.250 Oh 59,000.00 =Rp. 14,750.00
Kepala Tukang 0.025 Oh 63,600.00 =Rp. 1,590.00
Mandor 0.075 Oh 63,600.00 =Rp. 4,770.00
Jumlah Jumlah =Rp.
6.40 1 m2 Pasang rangka Langit-langit ( 1 x 1 ) m kayu kruing
Bahan :
Kayu kruing, balok 0.012 m3 7,653,000.00 =Rp. 91,836.00
Paku biasa 2-5" 0.100 Kg 15,000.00 =Rp. 1,500.00

Tenaga
Pekerja 0.150 Oh 45,400.00 =Rp. 6,810.00
Tukang kayu 0.250 Oh 59,000.00 =Rp. 14,750.00
Kepala Tukang 0.025 Oh 63,600.00 =Rp. 1,590.00
Mandor 0.075 Oh 63,600.00 =Rp. 4,770.00
Jumlah =Rp.
6.20 1 m2 Pasang rangka Langit-langit ( 60 x 60 ) cm kayu kruing
Bahan :
Kayu kruing, balok 0.016 m3 7,653,000.00 =Rp. 124,743.90
Paku biasa 2-5" 0.250 Kg 15,000.00 =Rp. 3,750.00

Tenaga
Pekerja 0.200 Oh 45,400.00 =Rp. 9,080.00
Tukang kayu 0.300 Oh 59,000.00 =Rp. 17,700.00
Kepala Tukang 0.030 Oh 63,600.00 =Rp. 1,908.00
Mandor 0.010 Oh 63,600.00 =Rp. 636.00
Jumlah =Rp.
6. 21 1 m' Pasang lisplank ukuran ( 3 x 20 ) cm, kayu jati
Bahan
Kayu jati, papan 0.0108 M3 20,872,500.00 = Rp. 225,423.00
Paku biasa 2" - 5" 0.100 Kg 15,000.00 = Rp. 1,500.00
Jumlah
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah
6.21b 1 m' Pasang lisplank ukuran ( 3 x 20 ) cm, kayu kamfer
Bahan
Kayu kamfer, papan 0.0108 M3 9,900,000.00 = Rp. 106,920.00
Paku biasa 2" - 5" 0.100 Kg 15,000.00 = Rp. 1,500.00
Jumlah
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah
6. 22 1 m' Pasang lisplank ukuran ( 3 x 30 ) cm, kayu jati
Bahan
Kayu jati, papan 0.011 M3 20,872,500.00 = Rp. 229,597.50
Paku biasa 2" - 5" 0.050 Kg 15,000.00 = Rp. 750.00
Jumlah
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah
6.22b 1 m' Pasang lisplank ukuran ( 3 x 30 ) cm, kayu kamfer
Bahan
Kayu kamfer, papan 0.011 M3 9,900,000.00 = Rp. 108,900.00
Paku biasa 2" - 5" 0.050 Kg 15,000.00 = Rp. 750.00
Tenaga Jumlah
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.005 Oh 63,600.00 = Rp. 318.00
Jumlah
6.23 1 m2 Pasang rangka dinding pemisah (60 x 120)cm, kayu kamfer
Bahan
Kayu kamfer, balok 0.0280 M3 9,350,000.00 = Rp. 261,800.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Jumlah
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.450 Oh 59,000.00 = Rp. 26,550.00
Kepala tukang 0.045 Oh 63,600.00 = Rp. 2,862.00
Mandor 0.008 Oh 63,600.00 = Rp. 508.80
Jumlah
6. 24 1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamfer
Bahan
Kayu kamfer, balok 0.0280 M3 9,350,000.00 = Rp. 261,800.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Lem kayu 0.560 Lt 14,300.00 = Rp. 8,008.00
Teakwood 120cm x 240cm x 3mm 0.860 Lbr 93,500.00 = Rp. 80,410.00
Jumlah
Tenaga
Pekerja 0.200 Oh 45,400.00 = Rp. 9,080.00
Tukang kayu 0.600 Oh 59,000.00 = Rp. 35,400.00
Kepala tukang 0.060 Oh 63,600.00 = Rp. 3,816.00
Mandor 0.010 Oh 63,600.00 = Rp. 636.00
Jumlah
6. 25 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamfer
Bahan
Kayu kamfer, balok 0.0280 M3 9,350,000.00 = Rp. 261,800.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Lem kayu 0.560 Lt 14,300.00 = Rp. 8,008.00
Plywood 120cm x 240cm x 4mm 0.860 Lbr 66,000.00 = Rp. 56,760.00
Jumlah
Tenaga
Pekerja 0.200 Oh 45,400.00 = Rp. 9,080.00
Tukang kayu 0.600 Oh 59,000.00 = Rp. 35,400.00
Kepala tukang 0.060 Oh 63,600.00 = Rp. 3,816.00
Mandor 0.010 Oh 63,600.00 = Rp. 636.00
Jumlah

Analisa biaya konstruksi ( ABK ) Bangunan Gedung dan Perumahan


Pekerjaan beton
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.
6.1 1 m3 Membuat beton mutu f'c=7,4 MPa (K 100), slump (12 ± 2) cm, w/c=0,87
Bahan
Semen portland 247.000 Kg 1,250.00 = Rp. 308,750.00
Pasir beton 869.000 Kg 160.00 = Rp. 139,040.00
Koral beton/kerikil 999.000 Kg 142.59 = Rp. 142,450.00
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh 63,600.00 = Rp. 5,278.80
Jumlah
6.2 1 m3 Membuat beton mutu f'c=9,8 MPa (K 125), slump (12 ± 2) cm, w/c=0,87
Bahan
Semen portland 276.000 Kg 1,250.00 = Rp. 345,000.00
Pasir beton 828.000 Kg 160.00 = Rp. 132,480.00
Koral beton/kerikil 1,012.000 Kg 142.59 = Rp. 144,303.70
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh 63,600.00 = Rp. 5,278.80
Jumlah

6.3 1 m3 Membuat beton mutu f'c=12,2 MPa (K 150), slump (12 ± 2) cm, w/c=0,72
Bahan
Semen portland 299.000 Kg 1,250.00 = Rp. 373,750.00
Pasir beton 799.000 Kg 160.00 = Rp. 127,840.00
Koral beton/kerikil 1,017.000 Kg 142.59 = Rp. 145,016.67
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh 63,600.00 = Rp. 5,278.80
Jumlah
6.4 1 m3 Membuat lantai kerja beton mutu f'c=7,4 MPa (K 100), slump (3-6) cm, w/c=0,87
Bahan
Semen portland 230.000 Kg 1,250.00 = Rp. 287,500.00
Pasir beton 893.000 Kg 160.00 = Rp. 142,880.00
Koral beton/kerikil 1,027.000 Kg 142.59 = Rp. 146,442.59
Air 200.000 Ltr 27.50 = Rp. 5,500.00
Jumlah
Tenaga
Pekerja 1.200 Oh 45,400.00 = Rp. 54,480.00
Tukang batu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.060 Oh 63,600.00 = Rp. 3,816.00
Jumlah
6.5 1 m3 Membuat beton mutu f'c=14,5 MPa (K 175), slump (12 ± 2) cm, w/c=0,66
Bahan
Semen portland 326.000 Kg 1,250.00 = Rp. 407,500.00
Pasir beton 760.000 Kg 160.00 = Rp. 121,600.00
Koral beton/kerikil 1,029.000 Kg 142.59 = Rp. 146,727.78
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh 63,600.00 = Rp. 5,278.80
Jumlah
6.6 1 m3 Membuat beton mutu f'c=16,9 MPa (K 200), slump (12 ± 2) cm, w/c=0,61
Bahan
Semen portland 352.000 Kg 1,250.00 = Rp. 440,000.00
Pasir beton 731.000 Kg 160.00 = Rp. 116,960.00
Koral beton/kerikil 1,031.000 Kg 142.59 = Rp. 147,012.96
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh 63,600.00 = Rp. 5,278.80
Jumlah
6.7 1 m3 Membuat beton mutu f'c=19,3 MPa (K 225), slump (12 ± 2) cm, w/c=0,58
Bahan
Semen portland 371.000 Kg 1,250.00 = Rp. 463,750.00
Pasir beton 698.000 Kg 160.00 = Rp. 111,680.00
Koral beton/kerikil 1,047.000 Kg 142.59 = Rp. 149,294.44
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh 63,600.00 = Rp. 5,278.80
Jumlah
6.8 1 m3 Membuat beton mutu f'c=21,7 MPa (K 250), slump (12 ± 2) cm, w/c=0,56
Bahan
Semen portland 384.000 Kg 1,250.00 = Rp. 480,000.00
Pasir beton 692.000 Kg 160.00 = Rp. 110,720.00
Koral beton/kerikil 1,039.000 Kg 142.59 = Rp. 148,153.70
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh 63,600.00 = Rp. 5,278.80
Jumlah
6.9 1 m3 Membuat beton mutu f'c=24,0 MPa (K 275), slump (12 ± 2) cm, w/c=0,53
Bahan
Semen portland 406.000 Kg 1,250.00 = Rp. 507,500.00
Pasir beton 684.000 Kg 160.00 = Rp. 109,440.00
Koral beton/kerikil 1,026.000 Kg 142.59 = Rp. 146,300.00
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh 63,600.00 = Rp. 5,278.80
Jumlah
6.10 1 m3 Membuat beton mutu f'c=26,4 MPa (K 300), slump (12 ± 2) cm, w/c=0,52
Bahan
Semen portland 413.000 Kg 1,250.00 = Rp. 516,250.00
Pasir beton 681.000 Kg 160.00 = Rp. 108,960.00
Koral beton/kerikil 1,021.000 Kg 142.59 = Rp. 145,587.04
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh 63,600.00 = Rp. 5,278.80
Jumlah
6.11 1 m3 Membuat beton mutu f'c=28,8 MPa (K 325), slump (12 ± 2) cm, w/c=0,49
Bahan
Semen portland 439.000 Kg 1,250.00 = Rp. 548,750.00
Pasir beton 670.000 Kg 160.00 = Rp. 107,200.00
Koral beton/kerikil 1,006.000 Kg 142.59 = Rp. 143,448.15
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 2.100 Oh 45,400.00 = Rp. 95,340.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Kepala tukang 0.035 Oh 63,600.00 = Rp. 2,226.00
Mandor 0.105 Oh 63,600.00 = Rp. 6,678.00
Jumlah
6.12 1 m3 Membuat beton mutu f'c=31,2 MPa (K 350), slump (12 ± 2) cm, w/c=0,48
Bahan
Semen portland 448.000 Kg 1,250.00 = Rp. 560,000.00
Pasir beton 667.000 Kg 160.00 = Rp. 106,720.00
Koral beton/kerikil 1,000.000 Kg 142.59 = Rp. 142,592.59
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah
Tenaga
Pekerja 2.100 Oh 45,400.00 = Rp. 95,340.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Kepala tukang 0.035 Oh 63,600.00 = Rp. 2,226.00
Mandor 0.105 Oh 63,600.00 = Rp. 6,678.00
Jumlah
6.17 1 Kg Pembesian dengan besi polos
Bahan
Besi beton polos 1.050 Kg 10,000.00 = Rp. 10,500.00
Kawat beton 0.015 Kg 18,000.00 = Rp. 270.00
Jumlah
Tenaga
Pekerja 0.007 Oh 45,400.00 = Rp. 317.80
Tukang batu 0.007 Oh 59,000.00 = Rp. 413.00
Kepala tukang 0.0007 Oh 63,600.00 = Rp. 44.52
Mandor 0.0004 Oh 63,600.00 = Rp. 25.44
Jumlah
6.17a 1 Kg Pembesian dengan besi ulir
Bahan
Besi beton ulir 1.050 Kg 10,900.00 = Rp. 11,445.00
Kawat beton 0.015 Kg 18,000.00 = Rp. 270.00
Jumlah
Tenaga
Pekerja 0.007 Oh 45,400.00 = Rp. 317.80
Tukang batu 0.007 Oh 59,000.00 = Rp. 413.00
Kepala tukang 0.0007 Oh 63,600.00 = Rp. 44.52
Mandor 0.0004 Oh 63,600.00 = Rp. 25.44
Jumlah
6.20 1 M2 Pasang bekisting untuk pondasi
Bahan
Kayu terentang (tahun) 0.040 M3 1,312,500.00 = Rp. 52,500.00
Paku Biasa 2'' - 5'' 0.300 Kg 15,000.00 = Rp. 4,500.00
Minyak bekisting 0.100 Lt 2,200.00 = Rp. 220.00
Jumlah
Tenaga
Pekerja 0.520 Oh 45,400.00 = Rp. 23,608.00
Tukang kayu 0.260 Oh 59,000.00 = Rp. 15,340.00
Kepala tukang 0.026 Oh 63,600.00 = Rp. 1,653.60
Mandor 0.026 Oh 63,600.00 = Rp. 1,653.60
Jumlah
6.21 1 M2 Pasang bekisting untuk sloof
Bahan
Kayu terentang (tahun) 0.045 M3 1,312,500.00 = Rp. 59,062.50
Paku Biasa 2'' - 5'' 0.300 Kg 15,000.00 = Rp. 4,500.00
Minyak bekisting 0.100 Lt 2,200.00 = Rp. 220.00
Jumlah
Tenaga
Pekerja 0.520 Oh 45,400.00 = Rp. 23,608.00
Tukang kayu 0.260 Oh 59,000.00 = Rp. 15,340.00
Kepala tukang 0.026 Oh 63,600.00 = Rp. 1,653.60
Mandor 0.026 Oh 63,600.00 = Rp. 1,653.60
Jumlah
6.22 1 M2 Pasang bekisting untuk kolom
Bahan
Kayu terentang (tahun) 0.040 M3 1,312,500.00 = Rp. 52,500.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.015 M3 3,960,000.00 = Rp. 59,400.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 2.000 Btg 23,000.00 = Rp. 46,000.00
Jumlah
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh 63,600.00 = Rp. 2,098.80
Jumlah
Dihitung1 M2 Pasang bekisting untuk kolom 2 kali pakai
Bahan
Kayu terentang (tahun) 0.020 M3 1,312,500.00 = Rp. 26,250.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.008 M3 3,960,000.00 = Rp. 29,700.00
Playwood 9 mm 0.175 Lbr 128,700.00 = Rp. 22,522.50
Dolken Ø -8 cm/ 4 m 1.000 Btg 23,000.00 = Rp. 23,000.00
Jumlah
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh 63,600.00 = Rp. 2,098.80
Jumlah

6.23 1 M2 Pasang bekisting untuk balok


Bahan
Kayu terentang (tahun) 0.040 M3 1,312,500.00 = Rp. 52,500.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.018 M3 3,960,000.00 = Rp. 71,280.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 2.000 Btg 23,000.00 = Rp. 46,000.00
Jumlah
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh 63,600.00 = Rp. 2,098.80
Jumlah
Dihitung1 M2 Pasang bekisting untuk balok 2 kali pakai
Bahan
Kayu terentang (tahun) 0.020 M3 1,312,500.00 = Rp. 26,250.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.009 M3 3,960,000.00 = Rp. 35,640.00
Playwood 9 mm 0.175 Lbr 128,700.00 = Rp. 22,522.50
Dolken Ø -8 cm/ 4 m 1.000 Btg 23,000.00 = Rp. 23,000.00
Jumlah
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh 63,600.00 = Rp. 2,098.80
Jumlah

6.24 1 M2 Pasang bekisting untuk lantai


Bahan
Kayu terentang (tahun) 0.040 M3 1,312,500.00 = Rp. 52,500.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.015 M3 3,960,000.00 = Rp. 59,400.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 6.000 Btg 23,000.00 = Rp. 138,000.00
Jumlah
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh 63,600.00 = Rp. 2,098.80
Jumlah
Dihitung1 M2 Pasang bekisting untuk lantai 2 kali pakai
Bahan
Kayu terentang (tahun) 0.020 M3 1,312,500.00 = Rp. 26,250.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.008 M3 3,960,000.00 = Rp. 29,700.00
Playwood 9 mm 0.175 Lbr 128,700.00 = Rp. 22,522.50
Dolken Ø -8 cm/ 4 m 3.000 Btg 23,000.00 = Rp. 69,000.00
Jumlah
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh 63,600.00 = Rp. 2,098.80
Jumlah
6.25 1 M2 Pasang bekisting untuk dinding
Bahan
Kayu terentang (tahun) 0.030 M3 1,312,500.00 = Rp. 39,375.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.020 M3 3,960,000.00 = Rp. 79,200.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 3.000 Btg 23,000.00 = Rp. 69,000.00
Jumlah
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh 63,600.00 = Rp. 2,098.80
Jumlah
6.26 1 M2 Pasang bekisting untuk tangga
Bahan
Kayu terentang (tahun) 0.030 M3 1,312,500.00 = Rp. 39,375.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.150 Lt 2,200.00 = Rp. 330.00
kayu balok (meranti) 0.015 M3 3,960,000.00 = Rp. 59,400.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 2.000 Btg 23,000.00 = Rp. 46,000.00
Jumlah
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh 63,600.00 = Rp. 2,098.80
Jumlah

6.35 1 M3 Membuat beton dengan K225


Bahan
Semen portland 388.000 Kg 1,250.00 = Rp. 485,000.00
Pasir beton 0.650 M3 224,000.00 = Rp. 145,600.00
Koral beton 0.650 M3 192,500.00 = Rp. 125,125.00
Jumlah
Tenaga
Pekerja 6.000 Oh 45,400.00 = Rp. 272,400.00
Tukang batu 1.000 Oh 59,000.00 = Rp. 59,000.00
Kepala tukang 0.100 Oh 63,600.00 = Rp. 6,360.00
Mandor 0.300 Oh 63,600.00 = Rp. 19,080.00
Jumlah

6.36 1 M3 Membuat beton dengan K275


Bahan
Semen portland 400.000 Kg 1,250.00 = Rp. 500,000.00
Pasir beton 0.400 M3 224,000.00 = Rp. 89,600.00
Koral beton 0.820 M3 192,500.00 = Rp. 157,850.00
Jumlah
Tenaga
Pekerja 6.000 Oh 45,400.00 = Rp. 272,400.00
Tukang batu 1.000 Oh 59,000.00 = Rp. 59,000.00
Kepala tukang 0.100 Oh 63,600.00 = Rp. 6,360.00
Mandor 0.300 Oh 63,600.00 = Rp. 19,080.00
Jumlah

6.28 1 m3 Membuat Pondasi beton bertulang ( 150 Kg besi + Bekisting )


Bahan
Kayu terentang ( kayu tahun ) 0.200 M3 1,312,500.00 = Rp. 262,500.00
Paku Biasa 2'' - 5'' 1.500 Kg 15,000.00 = Rp. 22,500.00
Minyak bekisting 0.400 Lt 2,200.00 = Rp. 880.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh 63,600.00 = Rp. 16,854.00
Jumlah
6.28a 1 m3 Membuat Pondasi beton bertulang ( 125 Kg besi + Bekisting )
Bahan
Kayu terentang ( kayu tahun ) 0.200 M3 1,312,500.00 = Rp. 262,500.00
Paku Biasa 2'' - 5'' 1.500 Kg 15,000.00 = Rp. 22,500.00
Minyak bekisting 0.400 Lt 2,200.00 = Rp. 880.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh 63,600.00 = Rp. 16,854.00
Jumlah
6.29 1 m3 Membuat Sloof beton bertulang ( 200 Kg besi + Bekisting )
Bahan
Kayu terentang ( kayu tahun ) 0.270 M3 1,312,500.00 = Rp. 354,375.00
Paku Biasa 2'' - 5'' 2.000 Kg 15,000.00 = Rp. 30,000.00
Minyak bekisting 0.600 Lt 2,200.00 = Rp. 1,320.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah
Tenaga
Pekerja 5.650 Oh 45,400.00 = Rp. 256,510.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.560 Oh 59,000.00 = Rp. 92,040.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.323 Oh 63,600.00 = Rp. 20,542.80
Mandor 0.283 Oh 63,600.00 = Rp. 17,998.80
Jumlah

6.29a 1 m3 Membuat Sloof beton bertulang ( 150 Kg besi + Bekisting )


Bahan
Kayu terentang ( kayu tahun ) 0.270 M3 1,312,500.00 = Rp. 354,375.00
Paku Biasa 2'' - 5'' 2.000 Kg 15,000.00 = Rp. 30,000.00
Minyak bekisting 0.600 Lt 2,200.00 = Rp. 1,320.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.560 Oh 59,000.00 = Rp. 92,040.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh 63,600.00 = Rp. 16,854.00
Jumlah

6.29b 1 m3 Membuat Sloof beton bertulang ( 125 Kg besi + Bekisting )


Bahan
Kayu terentang ( kayu tahun ) 0.270 M3 1,312,500.00 = Rp. 354,375.00
Paku Biasa 2'' - 5'' 2.000 Kg 15,000.00 = Rp. 30,000.00
Minyak bekisting 0.600 Lt 2,200.00 = Rp. 1,320.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.560 Oh 59,000.00 = Rp. 92,040.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh 63,600.00 = Rp. 16,854.00
Jumlah
6.30 1 m3 Membuat Kolom beton bertulang ( 300 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.400 M3 1,312,500.00 = Rp. 525,000.00
Paku Biasa 2'' - 5'' 4.000 Kg 15,000.00 = Rp. 60,000.00
Minyak bekisting 2.000 Lt 2,200.00 = Rp. 4,400.00
Besi beton polos 315.000 Kg 10,000.00 = Rp. 3,150,000.00
Kawat beton 4.500 Kg 18,000.00 = Rp. 81,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.150 M3 3,960,000.00 = Rp. 594,000.00
Playwood 9 mm 3.500 Lbr 128,700.00 = Rp. 450,450.00
Dolken Ø -8 cm/ 4 m 20.000 Btg 23,000.00 = Rp. 460,000.00
Jumlah
Tenaga
Pekerja 7.050 Oh 45,400.00 = Rp. 320,070.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.650 Oh 59,000.00 = Rp. 97,350.00
Tukang Besi 2.100 Oh 59,000.00 = Rp. 123,900.00
Kepala tukang 0.403 Oh 63,600.00 = Rp. 25,630.80
Mandor 0.353 Oh 63,600.00 = Rp. 22,450.80
Jumlah
6.30a 1 m3 Membuat Kolom beton bertulang ( 200 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.120 M3 3,960,000.00 = Rp. 475,200.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 32.000 Btg 23,000.00 = Rp. 736,000.00
Jumlah
Tenaga
Pekerja 6.350 Oh 45,400.00 = Rp. 288,290.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.650 Oh 59,000.00 = Rp. 97,350.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.333 Oh 63,600.00 = Rp. 21,178.80
Mandor 0.318 Oh 63,600.00 = Rp. 20,224.80
Jumlah
6.32 1 m3 Membuat Kolom beton bertulang ( 150 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.120 M3 3,960,000.00 = Rp. 475,200.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 32.000 Btg 23,000.00 = Rp. 736,000.00
Jumlah
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh 63,600.00 = Rp. 16,854.00
Jumlah
6.32a 1 m3 Membuat Kolom beton bertulang ( 125 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.120 M3 3,960,000.00 = Rp. 475,200.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 32.000 Btg 23,000.00 = Rp. 736,000.00
Jumlah
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh 63,600.00 = Rp. 16,854.00
Jumlah
6.31 1 m3 Membuat balok beton bertulang ( 200 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.140 M3 3,960,000.00 = Rp. 554,400.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 16.000 Btg 23,000.00 = Rp. 368,000.00
Tenaga Jumlah
Pekerja 6.350 Oh 45,400.00 = Rp. 288,290.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.650 Oh 59,000.00 = Rp. 97,350.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.333 Oh 63,600.00 = Rp. 21,178.80
Mandor 0.318 Oh 63,600.00 = Rp. 20,224.80
Jumlah
6.31a 1 m3 Membuat balok beton bertulang ( 150 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.140 M3 3,960,000.00 = Rp. 554,400.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 16.000 Btg 23,000.00 = Rp. 368,000.00
Tenaga Jumlah
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh 63,600.00 = Rp. 16,854.00
Jumlah
6.31b 1 m3 Membuat balok beton bertulang ( 125 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.140 M3 3,960,000.00 = Rp. 554,400.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 16.000 Btg 23,000.00 = Rp. 368,000.00
Tenaga Jumlah
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh 63,600.00 = Rp. 16,854.00
Jumlah
6.33 1 m3 Membuat dindng beton bertulang ( 150 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.240 M3 1,312,500.00 = Rp. 315,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.160 M3 3,960,000.00 = Rp. 633,600.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 24.000 Btg 23,000.00 = Rp. 552,000.00
Jumlah
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh 63,600.00 = Rp. 16,854.00
Jumlah
6.34 1 m3 Membuat dindng beton bertulang ( 200 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.250 M3 1,312,500.00 = Rp. 328,125.00
Paku Biasa 2'' - 5'' 3.000 Kg 15,000.00 = Rp. 45,000.00
Minyak bekisting 1.200 Lt 2,200.00 = Rp. 2,640.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.105 M3 3,960,000.00 = Rp. 415,800.00
Playwood 9 mm 2.500 Lbr 128,700.00 = Rp. 321,750.00
Dolken Ø -8 cm/ 4 m 14.000 Btg 23,000.00 = Rp. 322,000.00
Jumlah
Tenaga
Pekerja 5.650 Oh 45,400.00 = Rp. 256,510.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.560 Oh 59,000.00 = Rp. 92,040.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.323 Oh 63,600.00 = Rp. 20,542.80
Mandor 0.283 Oh 63,600.00 = Rp. 17,998.80
Jumlah
6.44 1 m3 Membuat tangga beton bertulang ( 200 Kg besi + Bekisting ) (SNI LAMA)
Bahan
Kayu terentang (tahun) 0.250 M3 1,312,500.00 = Rp. 328,125.00
Paku Biasa 2'' - 5'' 3.000 Kg 15,000.00 = Rp. 45,000.00
Minyak bekisting 1.200 Lt 2,200.00 = Rp. 2,640.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 323.000 Kg 1,250.00 = Rp. 403,750.00
Pasir beton 0.520 M3 224,000.00 = Rp. 116,480.00
Koral beton 0.780 M3 192,500.00 = Rp. 150,150.00
kayu balok (meranti) 0.105 M3 3,960,000.00 = Rp. 415,800.00
Playwood 9 mm 2.500 Lbr 128,700.00 = Rp. 321,750.00
Dolken Ø -8 cm/ 4 m 14.000 Btg 23,000.00 = Rp. 322,000.00
Jumlah
Tenaga
Pekerja 5.600 Oh 45,400.00 = Rp. 254,240.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Tukang kayu 2.300 Oh 59,000.00 = Rp. 135,700.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.405 Oh 63,600.00 = Rp. 25,758.00
Mandor 0.202 Oh 63,600.00 = Rp. 12,847.20
Jumlah
6.44a 1 m3 Membuat tangga beton bertulang ( 150 Kg besi + Bekisting ) (SNI LAMA)
Bahan
Kayu terentang (tahun) 0.250 M3 1,312,500.00 = Rp. 328,125.00
Paku Biasa 2'' - 5'' 3.000 Kg 15,000.00 = Rp. 45,000.00
Minyak bekisting 1.200 Lt 2,200.00 = Rp. 2,640.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 323.000 Kg 1,250.00 = Rp. 403,750.00
Pasir beton 0.520 M3 224,000.00 = Rp. 116,480.00
Koral beton 0.780 M3 192,500.00 = Rp. 150,150.00
kayu balok (meranti) 0.105 M3 3,960,000.00 = Rp. 415,800.00
Playwood 9 mm 2.500 Lbr 128,700.00 = Rp. 321,750.00
Dolken Ø -8 cm/ 4 m 14.000 Btg 23,000.00 = Rp. 322,000.00
Jumlah
Tenaga -
Pekerja 5.600 Oh 45,400.00 = Rp. 254,240.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Tukang kayu 2.300 Oh 59,000.00 = Rp. 135,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.405 Oh 63,600.00 = Rp. 25,758.00
Mandor 0.202 Oh 63,600.00 = Rp. 12,847.20
Jumlah
6.44b 1 m3 Membuat tangga beton bertulang ( 125 Kg besi + Bekisting ) (SNI LAMA)
Bahan
Kayu terentang (tahun) 0.250 M3 1,312,500.00 = Rp. 328,125.00
Paku Biasa 2'' - 5'' 3.000 Kg 15,000.00 = Rp. 45,000.00
Minyak bekisting 1.200 Lt 2,200.00 = Rp. 2,640.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 323.000 Kg 1,250.00 = Rp. 403,750.00
Pasir beton 0.520 M3 224,000.00 = Rp. 116,480.00
Koral beton 0.780 M3 192,500.00 = Rp. 150,150.00
kayu balok (meranti) 0.105 M3 3,960,000.00 = Rp. 415,800.00
Playwood 9 mm 2.500 Lbr 128,700.00 = Rp. 321,750.00
Dolken Ø -8 cm/ 4 m 14.000 Btg 23,000.00 = Rp. 322,000.00
Jumlah
Tenaga
Pekerja 5.600 Oh 45,400.00 = Rp. 254,240.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Tukang kayu 2.300 Oh 59,000.00 = Rp. 135,700.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.405 Oh 63,600.00 = Rp. 25,758.00
Mandor 0.202 Oh 63,600.00 = Rp. 12,847.20
Jumlah

6.35 1 m' Membuat kolom praktis beton bertulang ( 11 x 11 ) cm


Bahan
Kayu terentang (tahun) 0.002 M3 1,312,500.00 = Rp. 2,625.00
Paku Biasa 2'' - 5'' 0.010 Kg 15,000.00 = Rp. 150.00
Besi beton polos 3.000 Kg 10,000.00 = Rp. 30,000.00
Kawat beton 0.450 Kg 18,000.00 = Rp. 8,100.00
semen Portland 4.000 Kg 1,250.00 = Rp. 5,000.00
Pasir beton 0.006 M3 224,000.00 = Rp. 1,344.00
Koral beton 0.009 M3 192,500.00 = Rp. 1,732.50
Jumlah
Tenaga
Pekerja 0.180 Oh 45,400.00 = Rp. 8,172.00
Tukang batu 0.020 Oh 59,000.00 = Rp. 1,180.00
Tukang kayu 0.020 Oh 59,000.00 = Rp. 1,180.00
Tukang Besi 0.020 Oh 59,000.00 = Rp. 1,180.00
Kepala tukang 0.006 Oh 63,600.00 = Rp. 381.60
Mandor 0.009 Oh 63,600.00 = Rp. 572.40
Jumlah
6.36 1 m' Membuat ring balok beton bertulang ( 10 x 15 ) cm
Bahan
Kayu meranti 0.003 M3 3,960,000.00 = Rp. 11,880.00
Paku Biasa 2'' - 5'' 0.020 Kg 15,000.00 = Rp. 300.00
Besi beton polos 3.600 Kg 10,000.00 = Rp. 36,000.00
Kawat beton 0.050 Kg 18,000.00 = Rp. 900.00
semen Portland 5.500 Kg 1,250.00 = Rp. 6,875.00
Pasir beton 0.009 M3 224,000.00 = Rp. 2,016.00
Koral beton 0.015 M3 192,500.00 = Rp. 2,887.50
Jumlah
Tenaga
Pekerja 0.297 Oh 45,400.00 = Rp. 13,483.80
Tukang batu 0.033 Oh 59,000.00 = Rp. 1,947.00
Tukang kayu 0.033 Oh 59,000.00 = Rp. 1,947.00
Tukang Besi 0.033 Oh 59,000.00 = Rp. 1,947.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh 63,600.00 = Rp. 954.00
Jumlah
Analisa biaya konstruksi ( ABK ) Bangunan gedung dan perumahan
Pekerjaan penutup atap

Kode Uraian Volume Sat Harga Sat Jumlah Harga


Rp. Rp.
6.1 1 m2 Pasang atap genting Sokka
Bahan
Genteng Sokka besar 25.000 Bh 2,000.00 = Rp. 50,000.00
Jumlah
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.075 Oh 59,000.00 = Rp. 4,425.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.008 Oh 63,600.00 = Rp. 508.80
Jumlah
6.1a 1 m2 Pasang atap genting lokal
Bahan
Genteng lokal 25.000 Bh 1,000.00 = Rp. 25,000.00
Jumlah
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.075 Oh 59,000.00 = Rp. 4,425.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.008 Oh 63,600.00 = Rp. 508.80
Jumlah
6.1b 1 m2 Pasang atap genting Morando
Bahan
Genteng Morando 18.000 Bh 4,000.00 = Rp. 72,000.00
Jumlah
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.075 Oh 59,000.00 = Rp. 4,425.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.008 Oh 63,600.00 = Rp. 508.80
Jumlah
6.4 1 m1 Pasang genteng bubung Sokka
Bahan
Genteng bubung sokka 4.000 Bh 7,000.00 = Rp. 28,000.00
Semen Portland 8.000 Kg 1,250.00 = Rp. 10,000.00
Pasir Pasang 0.032 M3 195,000.00 = Rp. 6,240.00
Jumlah
Tenaga
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.002 Oh 63,600.00 = Rp. 127.20
Jumlah
6.4b 1 m1 Pasang genteng bubung morando
Bahan
Genteng bubung sokka 4.000 Bh 7,000.00 = Rp. 28,000.00
Semen Portland 8.000 Kg 1,250.00 = Rp. 10,000.00
Pasir Pasang 0.032 M3 195,000.00 = Rp. 6,240.00
Jumlah
Tenaga
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.002 Oh 63,600.00 = Rp. 127.20
Jumlah
6.4a 1 m1 Pasang genteng bubung lokal
Bahan
Genteng bubung lokal 4.000 Bh 5,500.00 = Rp. 22,000.00
Semen Portland 8.000 Kg 1,250.00 = Rp. 10,000.00
Pasir Pasang 0.032 M3 195,000.00 = Rp. 6,240.00
Jumlah
Tenaga
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.002 Oh 63,600.00 = Rp. 127.20
Jumlah

6.8 1 m2 pasang atap asbes gelombang besar pjg. 3m


Bahan
Asbes gelombang 0.500 Lbr 128,700.00 = Rp. 64,350.00
Paku pancing 60 x230 0.120 Kg 36,300.00 = Rp. 4,356.00
Jumlah
Tenaga
Pekerja 0.140 Oh 45,400.00 = Rp. 6,356.00
Tukang kayu 0.075 Oh 59,000.00 = Rp. 4,425.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.008 Oh 63,600.00 = Rp. 508.80
Jumlah
6.10 1 m2 pasang atap asbes gelombang kecil pjg. 3m
Bahan
Asbes gelombang 0.500 Lbr 93,500.00 = Rp. 46,750.00
Paku pancing 60 x230 0.120 Kg 36,300.00 = Rp. 4,356.00
Jumlah
Tenaga
Pekerja 0.140 Oh 45,400.00 = Rp. 6,356.00
Tukang kayu 0.070 Oh 59,000.00 = Rp. 4,130.00
Kepala tukang 0.007 Oh 63,600.00 = Rp. 445.20
Mandor 0.007 Oh 63,600.00 = Rp. 445.20
Jumlah

6.23 1 m' pasang nok stel gelombang besar


Bahan
Nok stel gelombang 2.050 Lbr 75,900.00 = Rp. 155,595.00
Paku sekrup 3,5 '' 6.000 Bh 1,250.00 = Rp. 7,500.00
Jumlah
Tenaga
Pekerja 0.084 Oh 45,400.00 = Rp. 3,813.60
Tukang kayu 0.125 Oh 59,000.00 = Rp. 7,375.00
Kepala tukang 0.013 Oh 63,600.00 = Rp. 826.80
Mandor 0.004 Oh 63,600.00 = Rp. 254.40
Jumlah
6.24 1 m' pasang nok stel gelombang kecil
Bahan
Nok stel gelombang 2.050 Lbr 44,000.00 = Rp. 90,200.00
Paku sekrup 3,5 '' 6.000 Bh 1,250.00 = Rp. 7,500.00
Jumlah
Tenaga
Pekerja 0.084 Oh 45,400.00 = Rp. 3,813.60
Tukang kayu 0.125 Oh 59,000.00 = Rp. 7,375.00
Kepala tukang 0.013 Oh 63,600.00 = Rp. 826.80
Mandor 0.004 Oh 63,600.00 = Rp. 254.40
Jumlah

6.30 1 m2 pasang atap genteng beton


Bahan
Genteng beton 11.000 Bh 3,850.00 = Rp. 42,350.00
Paku Biasa 2'' - 5'' 0.030 Kg 15,000.00 = Rp. 450.00
Jumlah
Tenaga
Pekerja 0.200 Oh 45,400.00 = Rp. 9,080.00
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.010 Oh 63,600.00 = Rp. 636.00
Jumlah

6.34 1 m' pasang nok genteng beton


Bahan
Niok genteng beton 3.500 Bh 5,500.00 = Rp. 19,250.00
Paku Biasa 2'' - 5'' 0.050 Kg 15,000.00 = Rp. 750.00
SemenPortland 8.000 Kg 1,250.00 = Rp. 10,000.00
pasir pasang 0.032 M3 195,000.00 = Rp. 6,240.00
Jumlah
Tenaga
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.020 Oh 63,600.00 = Rp. 1,272.00
Jumlah
6.38 1 m2 Pasang atap seng gelombang pj. 3m
Bahan
Seng gelombang BJLS 30 0.500 Bh 120,000.00 = Rp. 60,000.00
paku biasa 1/2 - 1'' 0.020 Kg 15,000.00 = Rp. 300.00
Jumlah
Tenaga
Pekerja 0.120 Oh 45,400.00 = Rp. 5,448.00
Tukang kayu 0.060 Oh 59,000.00 = Rp. 3,540.00
Kepala tukang 0.006 Oh 63,600.00 = Rp. 381.60
Mandor 0.006 Oh 63,600.00 = Rp. 381.60
Jumlah
6.39 1 m1 Pasang atap nok seng
Bahan
Seng gelombang BJLS 30 0.300 Bh 45,000.00 = Rp. 13,500.00
paku biasa 1/2 - 1'' 0.040 Kg 15,000.00 = Rp. 600.00
Jumlah
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.070 Oh 59,000.00 = Rp. 4,130.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.006 Oh 63,600.00 = Rp. 381.60
Jumlah
ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN
PEKERJAAN LANGIT-LANGIT
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.
6.1 1 m2 Langit-langit eternit ( 1 x 1 m ) tb 5 mm
Bahan :
Plat asbes tb 5 mm 1.100 Lbr 12,700.00 =Rp. 13,970.00
Paku 0.010 Kg 15,000.00 =Rp. 150.00

Tenaga
Pekerja 0.030 Oh 45,400.00 =Rp. 1,362.00
Tukang kayu 0.070 Oh 59,000.00 =Rp. 4,130.00
Kepala Tukang 0.007 Oh 63,600.00 =Rp. 445.20
Mandor 0.0040 Oh 63,600.00 =Rp. 254.40
Jumlah =Rp.

6.5 1 m2 Langit-langit tripleks ( 120 x 240 cm ) tb 4 mm


Bahan :
Tripleks/plywood 0.375 Lbr 66,000.00 =Rp. 24,750.00
Paku biasa 2-5" 0.030 Kg 15,000.00 =Rp. 450.00

Tenaga
Pekerja 0.100 Oh 45,400.00 =Rp. 4,540.00
Tukang kayu 0.100 Oh 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 Oh 63,600.00 =Rp. 636.00
Mandor 0.005 Oh 63,600.00 =Rp. 318.00
Jumlah =Rp.

6.6 1 m2 Pasang Langit-langit lambriziring kayu jati klas plitur, tebal 9 mm


Bahan :
Kayu jati, papan 0.015 m3 20,872,500.00 =Rp. 313,087.50
Paku tripleks 0.010 Kg 15,000.00 =Rp. 150.00

Tenaga
Pekerja 0.800 Oh 45,400.00 =Rp. 36,320.00
Tukang kayu 0.800 Oh 59,000.00 =Rp. 47,200.00
Kepala Tukang 0.080 Oh 63,600.00 =Rp. 5,088.00
Mandor 0.040 Oh 63,600.00 =Rp. 2,544.00
Jumlah =Rp.

6.7 1 m2 Pasang Langit-langit gypsum board (120cm x 240cm x 9mm)


Bahan :
Gypsum Board 0.364 Lbr 71,500.00 =Rp. 26,026.00
Paku Sekrup 0.110 Kg 62,500.00 =Rp. 6,875.00

Tenaga
Pekerja 0.100 Oh 45,400.00 =Rp. 4,540.00
Tukang kayu 0.050 Oh 59,000.00 =Rp. 2,950.00
Kepala Tukang 0.005 Oh 63,600.00 =Rp. 318.00
Mandor 0.005 Oh 63,600.00 =Rp. 318.00
Jumlah =Rp.
6.7a 1 m2 Pasang Langit-langit calcyboard (120cm x 240cm x 3,5mm)
Bahan :
CalcyBoard 0.364 Lbr 60,500.00 =Rp. 22,022.00
Paku Sekrup 0.110 Kg 62,500.00 =Rp. 6,875.00

Tenaga
Pekerja 0.100 Oh 45,400.00 =Rp. 4,540.00
Tukang kayu 0.050 Oh 59,000.00 =Rp. 2,950.00
Kepala Tukang 0.005 Oh 63,600.00 =Rp. 318.00
Mandor 0.005 Oh 63,600.00 =Rp. 318.00
Jumlah =Rp.

6.9 1 m1 Pasang list langit-langit kayu profil


Bahan :
List kayu profil 5x5 cm 1.050 m1 8,250.00 =Rp. 8,662.50
Paku 0.010 Kg 15,000.00 =Rp. 150.00

Tenaga
Pekerja 0.050 Oh 45,400.00 =Rp. 2,270.00
Tukang kayu 0.050 Oh 59,000.00 =Rp. 2,950.00
Kepala Tukang 0.005 Oh 63,600.00 =Rp. 318.00
Mandor 0.003 Oh 63,600.00 =Rp. 190.80
Jumlah =Rp.

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN SANITASI
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.
6.2a Memasang 1 buah kloset jongkok porselen
Bahan :
Kloset jongkok porselin 1.000 bh 110,000.00 =Rp. 110,000.00
Semen portland 6.000 Kg 1,250.00 =Rp. 7,500.00
Pasir pasang 0.010 M3 195,000.00 =Rp. 1,950.00

Tenaga
Pekerja 0.500 Oh 45,400.00 =Rp. 22,700.00
Tukang batu 0.750 Oh 59,000.00 =Rp. 44,250.00
Kepala Tukang 0.750 Oh 63,600.00 =Rp. 47,700.00
Mandor 0.100 Oh 63,600.00 =Rp. 6,360.00
Jumlah =Rp.

6.35 Memasang 1 buah kran diameter 3/4" atau 1/2"


Bahan :
Kran air 1.000 Bh 20,000.00 =Rp. 20,000.00
Seal tape 0.025 M3 2,750.00 =Rp. 68.75

Tenaga
Pekerja 0.010 Oh 45,400.00 =Rp. 454.00
Tukang batu 0.100 Oh 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 Oh 63,600.00 =Rp. 636.00
Mandor 0.005 Oh 63,600.00 =Rp. 318.00
Jumlah =Rp.

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN BESI DAN ALUMUNIUM
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.
6.1 1 Kg Pasang Besi Profil
Bahan :
Besi profil 1.150 Kg 13,000.00 =Rp. 14,950.00

Tenaga :
Tukang besi 0.060 Oh 59,000.00 =Rp. 3,540.00
Pekerja 0.060 Oh 45,400.00 =Rp. 2,724.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 381.60
Mandor 0.003 Oh 63,600.00 =Rp. 190.80
Jumlah =Rp.
6.2 1 Kg Pasang Rangka Kuda-kuda Baja IWF
Bahan :
Besi baja IWF 1.150 Kg 13,000.00 =Rp. 14,950.00

Tenaga :
Tukang besi 0.060 Oh 59,000.00 =Rp. 3,540.00
Pekerja 0.060 Oh 45,400.00 =Rp. 2,724.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 381.60
Mandor 0.003 Oh 63,600.00 =Rp. 190.80
Jumlah =Rp.
6.10 1 m2 Pasang Rolling door Alumunium
Bahan :
Roll door 1.000 M2 322,000.00 =Rp. 322,000.00

Tenaga :
Tukang besi konstruksi 1.000 Oh 59,000.00 =Rp. 59,000.00
Pekerja 1.000 Oh 45,400.00 =Rp. 45,400.00
Kepala Tukang 0.100 Oh 63,600.00 =Rp. 6,360.00
Mandor 0.050 Oh 63,600.00 =Rp. 3,180.00
Jumlah =Rp.

6.18 1 m' Pasang talang datar, seng bjls 30, dudukan bengkirai
Bahan :
Seng bjls 30 1.050 Lbr 45,000.00 =Rp. 47,250.00
Paku biasa 1/2" - 1" 0.015 Kg 15,000.00 =Rp. 225.00
Kayu bengkirai, papan 0.008 M3 11,000,000.00 =Rp. 88,000.00

Tenaga :
Tukang kayu 0.400 Oh 59,000.00 =Rp. 23,600.00
Pekerja 0.200 Oh 45,400.00 =Rp. 9,080.00
Kepala Tukang 0.025 Oh 63,600.00 =Rp. 1,590.00
Mandor 0.010 Oh 63,600.00 =Rp. 636.00
Jumlah =Rp.

6.18a 1 m' Pasang talang datar, seng bjls 30, dudukan kamfer
Bahan :
Seng bjls 30 1.050 Lbr 45,000.00 =Rp. 47,250.00
Paku biasa 1/2" - 1" 0.015 Kg 15,000.00 =Rp. 225.00
Kayu kamfer, papan 0.008 M3 9,900,000.00 =Rp. 79,200.00
-
Tenaga : -
Tukang kayu 0.400 Oh 59,000.00 =Rp. 23,600.00
Pekerja 0.200 Oh 45,400.00 =Rp. 9,080.00
Kepala Tukang 0.025 Oh 63,600.00 =Rp. 1,590.00
Mandor 0.010 Oh 63,600.00 =Rp. 636.00
Jumlah =Rp.

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN KUNCI DAN KACA
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.
6.5 1 buah Pasang Engsel pintu (engsel H besar)
Bahan :
Engsel pintu 1.000 Bh 14,850.00 =Rp. 14,850.00

Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh 63,600.00 =Rp. 47.70
Jumlah =Rp.
6.6 1 buah Pasang Engsel jendela (engsel H kecil)
Bahan :
Engsel jendela 1.000 Bh 10,450.00 =Rp. 10,450.00

Tenaga :
Pekerja 0.010 Oh 45,400.00 =Rp. 454.00
Tukang kayu 0.100 Oh 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 Oh 63,600.00 =Rp. 636.00
Mandor 0.0005 Oh 63,600.00 =Rp. 31.80
Jumlah =Rp.
6.5a 1 buah Pasang Engsel pintu (engsel kuningan besar)
Bahan :
Engsel pintu 1.000 Bh 72,600.00 =Rp. 72,600.00

Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh 63,600.00 =Rp. 47.70
Jumlah =Rp.
6.6a 1 buah Pasang Engsel jendela (engsel kuningan kecil)
Bahan :
Engsel jendela 1.000 Bh 54,450.00 =Rp. 54,450.00

Tenaga :
Pekerja 0.010 Oh 45,400.00 =Rp. 454.00
Tukang kayu 0.100 Oh 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 Oh 63,600.00 =Rp. 636.00
Mandor 0.0005 Oh 63,600.00 =Rp. 31.80
Jumlah =Rp.

6.9 1 buah Pasang Kait Angin


Bahan :
Kait angin 1.000 Bh 15,950.00 =Rp. 15,950.00

Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh 63,600.00 =Rp. 47.70
Jumlah =Rp.

6.9a 1 buah Pasang grendel


Bahan :
Kait angin 1.000 Bh 10,450.00 =Rp. 10,450.00

Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh 63,600.00 =Rp. 47.70
Jumlah =Rp.
6.11 1 buah Pasang Kunci selot
Bahan :
Kunci selot 1.000 Bh 109,780.00 =Rp. 109,780.00

Tenaga :
Pekerja 0.020 Oh 45,400.00 =Rp. 908.00
Tukang kayu 0.200 Oh 59,000.00 =Rp. 11,800.00
Kepala Tukang 0.020 Oh 63,600.00 =Rp. 1,272.00
Mandor 0.001 Oh 63,600.00 =Rp. 63.60
Jumlah =Rp.
6.16 1 m2 Pasang Kaca bening, tb. 3 mm
Bahan :
Kaca 1.100 Bh 75,000.00 =Rp. 82,500.00

Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh 63,600.00 =Rp. 47.70
Jumlah =Rp.
6.16a 1 m2 Pasang Kaca rayband, tb. 3 mm
Bahan :
Kaca 1.100 Bh 80,850.00 =Rp. 88,935.00

Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh 63,600.00 =Rp. 47.70
Jumlah =Rp.

6.17 1 m2 Pasang Kaca bening, tb. 5 mm


Bahan :
Kaca 1.100 Bh 90,000.00 =Rp. 99,000.00

Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh 63,600.00 =Rp. 47.70
Jumlah =Rp.

6.17a 1 m2 Pasang Kaca rayband, tb. 5 mm


Bahan :
Kaca 1.100 Bh 95,150.00 =Rp. 104,665.00

Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh 63,600.00 =Rp. 47.70
Jumlah =Rp.

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN PENGECATAN
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.
6.7 1 m2 pengecatan bidang kayu lama
Bahan :
Plamir kayu 0.150 Kg 29,700.00 =Rp. 4,455.00
Cat dasar 0.170 Kg 54,800.00 =Rp. 9,316.00
cat penutup 0.170 Kg 54,800.00 =Rp. 9,316.00

Tenaga :
Pekerja 0.070 Oh 45,400.00 =Rp. 3,178.00
Tukang cat 0.075 Oh 59,000.00 =Rp. 4,425.00
Kepala Tukang 0.0075 Oh 63,600.00 =Rp. 477.00
Mandor 0.0025 Oh 63,600.00 =Rp. 159.00
Jumlah =Rp.

6.8 1 m2 pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
Bahan :
Cat meni kayu 0.200 Kg 29,700.00 =Rp. 5,940.00
Plamir kayu 0.150 Kg 29,700.00 =Rp. 4,455.00
Cat dasar 0.170 Kg 54,800.00 =Rp. 9,316.00
cat penutup 2 kali 0.260 Kg 54,800.00 =Rp. 14,248.00

Tenaga :
Pekerja 0.070 Oh 45,400.00 =Rp. 3,178.00
Tukang cat 0.009 Oh 59,000.00 =Rp. 531.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 381.60
Mandor 0.0025 Oh 63,600.00 =Rp. 159.00
Jumlah =Rp.

6.9 1 m2 pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 3 lapis cat penutup
Bahan :
Cat meni kayu 0.200 Kg 29,700.00 =Rp. 5,940.00
Plamir kayu 0.150 Kg 29,700.00 =Rp. 4,455.00
Cat dasar 0.170 Kg 54,800.00 =Rp. 9,316.00
cat penutup 3 kali 0.350 Kg 54,800.00 =Rp. 19,180.00

Tenaga :
Pekerja 0.070 Oh 45,400.00 =Rp. 3,178.00
Tukang cat 0.105 Oh 59,000.00 =Rp. 6,195.00
Kepala Tukang 0.004 Oh 63,600.00 =Rp. 254.40
Mandor 0.0025 Oh 63,600.00 =Rp. 159.00
Jumlah =Rp.

6.14 1 m2 Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar dan 2 lapis cat penutup )
Bahan :
plamir tembok 0.100 Kg 25,000.00 =Rp. 2,500.00
Cat dasar 0.100 Kg 25,080.00 =Rp. 2,508.00
Cat penutup 2 kali 0.260 Kg 25,080.00 =Rp. 6,520.80

Tenaga :
Pekerja 0.020 Oh 45,400.00 =Rp. 908.00
Tukang cat 0.063 Oh 59,000.00 =Rp. 3,717.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 400.68
Mandor 0.0025 Oh 63,600.00 =Rp. 159.00
Jumlah =Rp.
6.14b 1 m2 Pengecatan tembok eksterior (weather shield) ( 1 lapis cat dasar dan 2 lapis cat penutup )
Bahan :
Cat dasar 0.100 Kg 91,839.09 =Rp. 9,183.91
Cat penutup 2 kali 0.260 Kg 91,839.09 =Rp. 23,878.16
-
Tenaga : -
Pekerja 0.020 Oh 45,400.00 =Rp. 908.00
Tukang cat 0.063 Oh 59,000.00 =Rp. 3,717.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 400.68
Mandor 0.0025 Oh 63,600.00 =Rp. 159.00
Jumlah =Rp.
6.15 1 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )
Bahan :
Cat dasar 0.120 Kg 25,080.00 =Rp. 3,009.60
Cat penutup 2 kali 0.180 Kg 25,080.00 =Rp. 4,514.40

Tenaga :
Pekerja 0.028 Oh 45,400.00 =Rp. 1,271.20
Tukang cat 0.042 Oh 59,000.00 =Rp. 2,478.00
Kepala Tukang 0.0042 Oh 63,600.00 =Rp. 267.12
Mandor 0.0025 Oh 63,600.00 =Rp. 159.00
Jumlah =Rp.
6.20 1 m2 Pengecatan Permukaan baja dengan meni besi
Bahan :
meni besi 0.100 Kg 29,700.00 =Rp. 2,970.00
Kuas 0.010 Bh 15,000.00 =Rp. 150.00

Tenaga :
Pekerja 0.020 Oh 45,400.00 =Rp. 908.00
Tukang cat 0.200 Oh 59,000.00 =Rp. 11,800.00
Kepala Tukang 0.020 Oh 63,600.00 =Rp. 1,272.00
Mandor 0.010 Oh 63,600.00 =Rp. 636.00
Jumlah =Rp.
SNI-BORONGAN
Jumlah Harga
Rp.

248,987.50

32,504.00
281,491.50

77,080.00

11,394.00
88,474.00

57,007.50

11,394.00
68,401.50
323,860.60

304,780.60
Jumlah Harga
Rp.

35,640.00

43,722.00

51,931.20

47,435.20

71,916.00

57,342.00

2,588.00
15,618.00

11,880.00

25,880.00
114,000.00

14,256.00
128,256.00

91,200.00

7,764.00
98,964.00

150,000.00

12,940.00
162,940.00

Jumlah Harga
Rp.

557,075.00

121,890.00
678,965.00

515,150.00

121,890.00
637,040.00
486,080.00

121,890.00
607,970.00
418,940.00

121,890.00
540,830.00

251,040.00

63,382.80
314,422.80

481,228.00

168,816.40
650,044.40

Jumlah Harga
Rp.

182,132.50

42,220.00
224,352.50

174,522.50

42,220.00
216,742.50

160,712.50

42,220.00
202,932.50

87,362.50

21,110.00
108,472.50

84,360.00

21,110.00
105,470.00

80,725.00

21,110.00
101,835.00

200,575.00

21,110.00
221,685.00

136,075.00

21,110.00
157,185.00

290,575.00
21,110.00
311,685.00

166,875.00

21,110.00
187,985.00
Jumlah Harga
Rp.

14,205.00

24,378.00
38,583.00

12,480.00

24,378.00
36,858.00

11,550.00

24,378.00
35,928.00

8,900.00
25,332.00
34,232.00

3,160.00

8,790.40
11,950.40

6,570.00

21,110.00
27,680.00

10,265.00

24,378.00
34,643.00

4,062.50

16,252.00
20,314.50
Jumlah Harga
Rp.

22,992,800.00

1,712,620.00
24,705,420.00

16,643,050.00

1,712,620.00
18,355,670.00

11,253,050.00

1,467,960.00
12,721,010.00

596,250.00

182,444.00
778,694.00
842,050.00

244,660.00
1,086,710.00

611,150.00

244,660.00
855,810.00

403,150.00

244,660.00

505,230.00

195,728.00
700,958.00
366,690.00

195,728.00
562,418.00

241,890.00

195,728.00
437,618.00

1,342,990.00

244,660.00
1,587,650.00

973,550.00

244,660.00
1,218,210.00

640,750.00
244,660.00
885,410.00
607,936.00

195,728.00
803,664.00

460,160.00

195,728.00
655,888.00

327,040.00

195,728.00
522,768.00

620,052.50

195,728.00
815,780.50

475,740.00

195,728.00
671,468.00
345,740.00

195,728.00
541,468.00

11,205,000.00

978,640.00
12,183,640.00

8,733,300.00

978,640.00
9,711,940.00

11,166,000.00

587,184.00
11,753,184.00

114,450.00

11,394.00
125,844.00
77,420.00

5,665.20
83,085.20

121,050.00

11,394.00
132,444.00

140,850.00

11,394.00
152,244.00

113,700.00

27,920.00
141,620.00

93,336.00
27,920.00
121,256.00

128,493.90

29,324.00
157,817.90
226,923.00

17,930.00
244,853.00

108,420.00

17,930.00
126,350.00

230,347.50

17,930.00
248,277.50

109,650.00

17,930.00
127,580.00

264,050.00
36,730.80
300,780.80
352,468.00

48,932.00
401,400.00

328,818.00

48,932.00
377,750.00

Jumlah Harga
Rp.

596,152.50

98,194.60
694,347.10
627,696.20

98,194.60
725,890.80

652,519.17

98,194.60
750,713.77

582,322.59

71,368.00
653,690.59

681,740.28

98,194.60
779,934.88
709,885.46

98,194.60
808,080.06

730,636.94

98,194.60
828,831.54

744,786.20

98,194.60
842,980.80

769,152.50

98,194.60
867,347.10
776,709.54

98,194.60
874,904.14
805,310.65

124,894.00
930,204.65

815,225.09

124,894.00
940,119.09

10,770.00

800.76
11,570.76

11,715.00

800.76
12,515.76
57,220.00

42,255.20
99,475.20
63,782.50

42,255.20
106,037.70

209,385.00

53,631.60
263,016.60

107,912.50

53,631.60
161,544.10

221,265.00
53,631.60
274,896.60
113,852.50

53,631.60
167,484.10

301,385.00

53,631.60
355,016.60

153,912.50

53,631.60
207,544.10
239,060.00

53,631.60
292,691.60
196,150.00

53,631.60
249,781.60

755,725.00

356,840.00
1,112,565.00

747,450.00

356,840.00
1,104,290.00
2,598,265.00

429,012.20
3,027,277.20
2,329,015.00

418,687.20
2,747,702.20

3,236,580.00

485,916.60
3,722,496.60

2,698,080.00
444,352.20
3,142,432.20

2,428,830.00

434,027.20
2,862,857.20

6,021,735.00
605,626.60
6,627,361.60
4,880,465.00

525,868.60
5,406,333.60

4,355,465.00

429,012.20
4,784,477.20
4,086,215.00

418,687.20
4,504,902.20
4,605,165.00

525,868.60
5,131,033.60

4,080,165.00

429,012.20
4,509,177.20
3,797,415.00

418,687.20
4,216,102.20
4,224,865.00

429,012.20
4,653,877.20

4,286,200.00

485,916.60
4,772,116.60
4,259,695.00

531,795.20
4,791,490.20
3,721,195.00

511,145.20
4,232,340.20

3,451,945.00

500,820.20
3,952,765.20
48,951.50

12,666.00
61,617.50
60,858.50

20,914.80
81,773.30

Jumlah Harga
Rp.

50,000.00

12,252.60
62,252.60

25,000.00

12,252.60
37,252.60

72,000.00
12,252.60
84,252.60

44,240.00

31,359.20
75,599.20

44,240.00

31,359.20
75,599.20

38,240.00

31,359.20
69,599.20

68,706.00

11,798.60
80,504.60
51,106.00

11,376.40
62,482.40

163,095.00

12,269.80
175,364.80
97,700.00

12,269.80
109,969.80

42,800.00

16,252.00
59,052.00

36,240.00

32,504.00
68,744.00

60,300.00

9,751.20
70,051.20
14,100.00

11,830.40
25,930.40
Jumlah Harga
Rp.

14,120.00

6,191.60
20,311.60

25,200.00

11,394.00
36,594.00

313,237.50

91,152.00
404,389.50

32,901.00

8,126.00
41,027.00
28,897.00

8,126.00
37,023.00

8,812.50

5,728.80
14,541.30

Jumlah Harga
Rp.

119,450.00

121,010.00
240,460.00

20,068.75
7,308.00
27,376.75

Jumlah Harga
Rp.

14,950.00

6,836.40
21,786.40

14,950.00

6,836.40
21,786.40
322,000.00

113,940.00
435,940.00

135,475.00

34,906.00
170,381.00

126,675.00

34,906.00
161,581.00

Jumlah Harga
Rp.

14,850.00
10,532.70
25,382.70

10,450.00

7,021.80
17,471.80
72,600.00

10,532.70
83,132.70

54,450.00

7,021.80
61,471.80

15,950.00

10,532.70
26,482.70

10,450.00

10,532.70
20,982.70

109,780.00

14,043.60
123,823.60

82,500.00

10,532.70
93,032.70
88,935.00

10,532.70
99,467.70

99,000.00

10,532.70
109,532.70

104,665.00

10,532.70
115,197.70

Jumlah Harga
Rp.

23,087.00

8,239.00
31,326.00
33,959.00

4,249.60
38,208.60

38,891.00

9,786.40
48,677.40

11,528.80

5,184.68
16,713.48
terior (weather shield) ( 1 lapis cat dasar dan 2 lapis cat penutup )

33,062.07

5,184.68
38,246.75
7,524.00

4,175.32
11,699.32

3,120.00

14,616.00
17,736.00
Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan
Pekerjaan Tanah

Kode Uraian Volume Sat Harga Sat


Rp.

SUPL 1 m3 Urugan Tanah


Bahan dan Upah
Tanah urug 1.200 M3 80,000.00 Rp.
Pekerja 0.300 Oh 45,400.00 Rp.
Mandor 0.010 Oh 63,600.00 Rp.
Jumlah

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN KAYU

Kode Uraian Volume Sat Harga Sat


Rp.

F.21.b 1 M1 Pasang Papan list kamper tbl 2 cm


Kayu Kamper 0.0240 M3 9,900,000.00 Rp.
Paku 0.1000 Kg 15,000.00 Rp.
Tukang kayu 0.8000 OH 59,000.00 Rp.
Kepala Tukang 0.0800 OH 63,600.00 Rp.
Pekerja 0.2800 OH 45,400.00 Rp.
Mandor 0.0140 OH 63,600.00 Rp.
Jumlah
Untuk papan list lebar 20 cm = 1/5 x 304,990.40 Rp.
Untuk papan list lebar 25 cm = 1/4 x 304,990.40 Rp.
Untuk papan list lebar 30 cm = 3/10 x 304,990.40 Rp.

F.21.c 1 M1 Pasang Papan list jati klas plitur tbl 2 cm


Kayu Jati 0.0240 M3 20,872,500.00 Rp.
Paku 0.1000 Kg 15,000.00 Rp.
Tukang kayu 0.8000 OH 59,000.00 Rp.
Kepala Tukang 0.0800 OH 63,600.00 Rp.
Pekerja 0.2800 OH 45,400.00 Rp.
Mandor 0.0140 OH 63,600.00 Rp.
Jumlah

Untuk papan list lebar 20 cm = 1/5 x 568,330.40 Rp.


Untuk papan list lebar 25 cm = 1/4 x 568,330.40 Rp.
Untuk papan list lebar 30 cm = 3/10 x 568,330.40 Rp.

F.21.d 1 M1 Pasang Papan list jati klas cat tbl 2 cm


Kayu Jati 0.0240 M3 15,100,000.00 Rp.
Paku 0.1000 Kg 15,000.00 Rp.
Tukang kayu 0.8000 OH 59,000.00 Rp.
Kepala Tukang 0.0800 OH 63,600.00 Rp.
Pekerja 0.2800 OH 45,400.00 Rp.
Mandor 0.0140 OH 63,600.00 Rp.
Jumlah

Untuk papan list lebar 20 cm = 1/5 x 429,790.40 Rp.


Untuk papan list lebar 25 cm = 1/4 x 429,790.40 Rp.
Untuk papan list lebar 30 cm = 3/10 x 429,790.40 Rp.

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN KERAMIK
Kode Uraian Volume Sat Harga Sat
Rp.

M.7 d 1m2 Pasang keramik 30/30 ( putih )


Keramik 1.0000 m2 46,750.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen putih 0.0025 zak 80,300.00 Rp.
Tukang batu 0.3000 OH 59,000.00 Rp.
Kepala Tukang 0.0300 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah

M.7 e 1m2 Pasang keramik 40/40 ( putih )


Keramik 1.0000 m2 60,500.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen putih 0.0025 zak 80,300.00 Rp.
Tukang batu 0.3000 OH 59,000.00 Rp.
Kepala Tukang 0.0300 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah

Dihitung 1m2 Pasang keramik lanatai khusus 32,5 x 32,5 cm


Keramik 1.0000 m2 144,100.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen putih 0.0025 zak 80,300.00 Rp.
Tukang batu 0.3000 OH 59,000.00 Rp.
Kepala Tukang 0.0300 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah

M.7 g 1m2 Pasang keramik 20/20 ( warna )


Keramik 1.0000 m2 65,000.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen warna 0.0025 zak 484,000.00 Rp.
Tukang batu 0.3000 OH 59,000.00 Rp.
Kepala Tukang 0.0300 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah

M.7 h 1m2 Pasang keramik dinding 20/25 ( warna )


Keramik 1.0000 m2 99,000.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen warna 0.0025 zak 484,000.00 Rp.
Tukang batu 0.4000 OH 59,000.00 Rp.
Kepala Tukang 0.0400 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah

Dihitung 1m2 Pasang keramikdinding khusus 32,5 x 50 cm


Keramik 1.0000 m2 139,700.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen warna 0.0025 zak 484,000.00 Rp.
Tukang batu 0.4000 OH 59,000.00 Rp.
Kepala Tukang 0.0400 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah
Dihitung 1m2 Pasang keramik dinding 30 x 60 cm
Keramik 1.0000 m2 130,000.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen warna 0.0025 zak 484,000.00 Rp.
Tukang batu 0.4000 OH 59,000.00 Rp.
Kepala Tukang 0.0400 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah
M.7 i 1m2 Pasang keramik 30/30 ( warna )
Keramik 1.0000 m2 62,000.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen warna 0.0025 zak 484,000.00 Rp.
Tukang batu 0.3000 OH 59,000.00 Rp.
Kepala Tukang 0.0300 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah
M.7 j 1m2 Pasang keramik 40/40 ( warna )
Keramik 1.0000 m2 63,250.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen warna 0.0025 zak 484,000.00 Rp.
Tukang batu 0.3000 OH 59,000.00 Rp.
Kepala Tukang 0.0300 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah
Dihitung 1m2 Pasang keramik 60x60 ( warna )
Keramik 1.0000 m2 104,500.00 Rp.
PC 50 Kg 0.1200 zak 62,500.00 Rp.
Pasir Pasang 0.0095 m3 195,000.00 Rp.
Semen warna 0.0025 zak 484,000.00 Rp.
Tukang batu 0.3000 OH 59,000.00 Rp.
Kepala Tukang 0.0300 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0500 OH 63,600.00 Rp.
Jumlah
M.15 1m2 Pasang Paving blok mutiara tebal 6 cm K.200
Paving blok 6 CM 1.0000 M2 122,000.00 Rp.
Pasir Pasang 0.1000 M3 195,000.00 Rp.
Tukang Batu 0.2000 OH 59,000.00 Rp.
Kepala Tukang 0.0200 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0200 OH 63,600.00 Rp.
Jumlah
M.16 1m2 Pasang Paving blok mutiara tebal 8 cm K.300
Paving blok 8 CM 1.0000 M2 145,000.00 Rp.
Pasir Pasang 0.1000 M3 195,000.00 Rp.
Tukang Batu 0.2000 OH 59,000.00 Rp.
Kepala Tukang 0.0200 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0200 OH 63,600.00 Rp.
Jumlah
M.15a 1m2 Pasang Paving blok lokal tebal 6 cm
Paving blok 6 CM 1.0000 M2 42,000.00 Rp.
Pasir Pasang 0.1000 M3 195,000.00 Rp.
Tukang Batu 0.2000 OH 59,000.00 Rp.
Kepala Tukang 0.0200 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0200 OH 63,600.00 Rp.
Jumlah
M.16a 1m2 Pasang Paving blok lokal tebal 8 cm
Paving blok 8 CM 1.0000 M2 65,450.00 Rp.
Pasir Pasang 0.1000 M3 195,000.00 Rp.
Tukang Batu 0.2000 OH 59,000.00 Rp.
Kepala Tukang 0.0200 OH 63,600.00 Rp.
Pekerja 0.2000 OH 45,400.00 Rp.
Mandor 0.0200 OH 63,600.00 Rp.
Jumlah
BOW-BORONGAN
Jumlah Harga
Rp.

96,000.00
13,620.00
636.00
110,256.00

NSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

Jumlah Harga
Rp.

237,600.00
1,500.00
47,200.00
5,088.00
12,712.00
890.40
304,990.40
60,998.08
76,247.60
91,497.12

500,940.00
1,500.00
47,200.00
5,088.00
12,712.00
890.40
568,330.40

113,666.08
142,082.60
170,499.12

362,400.00
1,500.00
47,200.00
5,088.00
12,712.00
890.40
429,790.40

85,958.08
107,447.60
128,937.12

NSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN

Jumlah Harga
Rp.

46,750.00
7,500.00
1,852.50
200.75
17,700.00
1,908.00
9,080.00
3,180.00
88,171.25

60,500.00
7,500.00
1,852.50
200.75
17,700.00
1,908.00
9,080.00
3,180.00
101,921.25

144,100.00
7,500.00
1,852.50
200.75
17,700.00
1,908.00
9,080.00
3,180.00
185,521.25

65,000.00
7,500.00
1,852.50
1,210.00
17,700.00
1,908.00
9,080.00
3,180.00
107,430.50

99,000.00
7,500.00
1,852.50
1,210.00
23,600.00
2,544.00
9,080.00
3,180.00
147,966.50

139,700.00
7,500.00
1,852.50
1,210.00
23,600.00
2,544.00
9,080.00
3,180.00
188,666.50
130,000.00
7,500.00
1,852.50
1,210.00
23,600.00
2,544.00
9,080.00
3,180.00
178,966.50

62,000.00
7,500.00
1,852.50
1,210.00
17,700.00
1,908.00
9,080.00
3,180.00
104,430.50

63,250.00
7,500.00
1,852.50
1,210.00
17,700.00
1,908.00
9,080.00
3,180.00
105,680.50

104,500.00
7,500.00
1,852.50
1,210.00
17,700.00
1,908.00
9,080.00
3,180.00
146,930.50

122,000.00
19,500.00
11,800.00
1,272.00
9,080.00
1,272.00
164,924.00

145,000.00
19,500.00
11,800.00
1,272.00
9,080.00
1,272.00
187,924.00

42,000.00
19,500.00
11,800.00
1,272.00
9,080.00
1,272.00
84,924.00

65,450.00
19,500.00
11,800.00
1,272.00
9,080.00
1,272.00
108,374.00