Professional Documents
Culture Documents
% Humedad
28.52 0.00 28.52 8.57 1era gota
17.20 0.01 17.19 5.96
17.29 0.05 17.24 5.97
10
17.36 0.10 17.26 5.98
17.60 0.23 17.37 6.01
8
17.84 0.34 17.49 6.04
18.07 0.42 17.65 6.07
18.31 0.43 17.88 6.13 6
8.00
6.00
4.00
2.00
0.00
0 20 40 60 80 100 120 140 160 180
Tiempo, min
Vo lum e n dre na do (m 3)
Celda XYZ
Area 20,000 m2
N° Lift 5
Altura de Lift 10 m
Densidad 1.67 t/m3
Mineral 1,670,000 t
Volumen Dra
Tiempo Humedad Volumen 50,000
(horas) (%) Drenado (m3)
f(x) = -0.4729841463 ln(x) + 8.2781808
0.00 8.89 0 40,000 R² = 0.9692984374
0.23 8.55 6,872
0.33 8.51 7,600 30,000
0.43 8.48 8,327
0.53 8.44 9,055
20,000
0.62 8.40 9,783
0.70 8.37 10,510
10,000
0.78 8.35 10,874
0.88 8.31 11,602
0
0.97 8.29 11,965 0 5 10 15
8.00
7.50
7.00
6.50
6.00
10 15 20 25 30 35
Tiempo (horas)