UNITED CEMENTS PVT. LTD. Doc No.

UCPL-ME-HS-001
DHUNIBESHI-9,NAUBISE, DHADING, NEPAL Issue No.:01

INTEGRATED MANAGEMENT SYSTEM Issue Date: 01.11.2018


Revision No: 00

MECHANICAL DEPARTMENT Revision Date:

Title: HISTORY SHEET Page: 1 of 1

Section :- RAW MILL SECTION Equip. Name :- RAW MILL Equip. TAG No. 300 RM-1

Defect,Faults Date (Start- Repairs/Modifications Major Spares


SL.NO Observed/ Modification Completion) Carried out Man Power Manhours Consumed Remarks/Signature
work required

F:- 2 72
Authorized
Signatory

Raw mill motor power to be 1/7/2018


1) Modification of Base Frame R:- 3 108 Ms Plate
2)Replacement of Drive Motor
1 increased hence old motor to be to
(1100 kw-1400
(20MM Thk)
replaced by new one 3/7/2018 =60 Kgs
kw ) W:- 1 12
H.O.D
Kh:- 4 144

F:- 1 60
Authorized
Signatory

Raw mill hot air re-circulation 21/7/2018 Raw mill hot air re-circulation
R:- 3 180 Ms Plate
2 Duct size to be increased to to Duct size increased. (500-750 (8 MM Thk)
maintain dp and proper purging 25/7/2018 mm) =1250 Kgs
W:- 2 120
H.O.D
Kh:- 4 240

F:- 1 36
Authorized
Signatory

Raw mill baghouse Circuit 1/9/2018 Raw mill bag house fresh air
R:- 2 72
3 temperature high (>240°) several to damper re-positioned and ---
times 3/9/2018 maintenance platform fixed
W:- 3 108
H.O.D
Kh:- 3 108