You are on page 1of 23

Item Descripción

1 01 PAVIMENTOS

2 01.01 OBRAS PROVISIONALES

3 01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 7.20x3.60m

4 01.01.02 ALQUILER DE LOCAL PARA LA OBRA

5 01.01.03 ALQUILER DE BAÑO QUIMICO (DISAL)

6 01.02 SEGURIDAD Y SALUD

7 01.02.01 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO

8 01.02.02 EQUIPOS DE PROTECCION PERSONAL

9 01.02.03 MANTENIENTO DE TRANSITO Y SEGURIDAD VIAL

10 01.03 TRABAJOS PRELIMINARES

11 01.03.01 LIMPIEZA DE TERRENO MANUAL

12 01.03.02 TRAZO, NIVELES Y REPLANTEO CON EQUIPO TOPOGRÁFICO

13 01.03.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS

14 01.04 MOVIMIENTO DE TIERRAS


15 01.04.01 DEMOLICION DE PAVIMENTO FLEXIBLE C/EQUIPO E=2"

16 01.04.02 EXCAVACION A NIVEL SUB RASANTE CON EQUIPO

17 01.04.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM

18 01.05 PAVIMENTO RIGIDO

19 01.05.01 CONFORMACION Y COMPACTACION DE SUB RASANTE CON EQUIPO

20 01.05.02 RELLENO COMPACTADO CON MATERIAL PROPIO MEJORADO E=0.15M C/EQUIPO

21 01.05.03 BASE GRANULAR E=0.15 m CON EQUIPO

22 01.05.04 LOSA DE CONCRETO F´C=280 KG/CM2 E=0.20M INC. ACABADO DE PAVIMENTO

23 01.05.05 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO DE CONCRETO

24 01.05.06 ACERO LISO REDONDO 5/8" P/ DOWELS

25 01.05.07 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN JUNTAS LONGITUDINALES

26 01.05.08 CURADO DE LOSA DE CONCRETO

27 01.05.09 JUNTAS DE CONSTRUCCION INC. CORTE CON DISCO

28 01.05.10 CANASTILLA PARA DOWELS

29 01.06 SEÑALIZACION

30 01.06.01 PINTURA EN PAVIMENTO (LINEAL CONTINUA e=0.10m)

31 01.06.02 PINTADO DE SIMBOLOS, LETRAS Y SEÑALES

32 01.06.03 SEÑAL PREVENTIVA VERTICAL DE FIBRA DE VIDRIO 0.60x0.60m H=2.40, INC. DADO DE CONCRET

33 01.06.04 GIBA DE CONCRETO F'C=280 KG/CM2 INC. PINTURA RETROREFLECTIVA

34 02 VEREDAS, RAMPAS Y ESCALERAS DE CONCRETO

35 02.01 TRABAJOS PRELIMINARES

36 02.01.01 LIMPIEZA DE TERRENO MANUAL

37 02.01.02 TRAZO, NIVELES Y REPLANTEO CON EQUIPO TOPOGRÁFICO

38 02.02 MOVIMIENTO DE TIERRAS

39 02.02.01 DEMOLICION DE VEREDAS DE CONCRETO e=10 cm C/ EQUIPO

40 02.02.02 EXCAVACION A NIVEL SUB RASANTE MANUAL PARA VEREDAS

41 02.02.03 EXCAVACION MANUAL PARA SARDINELES

42 02.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM

43 02.02.05 CONFORMACION Y COMPACTACION DE SUB RASANTE PARA VEREDAS

44 02.02.06 BASE GRANULAR PARA VEREDAS E=0.10 m COMPACTADA


45 02.03 CONCRETO SIMPLE

46 02.03.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS

47 02.03.02 CONCRETO EN VEREDAS f'c=175 kg/cm2 H=0.10m (Semipulido y Bruñado @1.00m)

48 02.03.03 ESCALERA DE CONCRETO f'c= 175 kg/cm2 E=0.10M. INC. ACABADO,BRUÑADO Y CURADO

49 02.03.04 SARDINEL DE VEREDA CONCRETO PREMEZCLADO F'C=175KG/CM2

50 02.03.05 JUNTAS DE DILATACION EN VEREDAS @4.00 M

51 02.03.06 CONCRETO F´c=175 KG/CM2 EN RAMPAS(BRUÑADO@0.10m)

52 03 AREAS VERDES

53 03.01 LIMPIEZA DE TERRENO MANUAL

54 03.02 REFINE Y NIVELACION TERRENO NORMAL

55 03.03 EXCAVACION MANUAL PARA SARDINEL PERALTADO EN JARDINERAS

56 03.04 ELIMINACION DE MATERIAL EXCEDENTE EN SARDINEL PERALTADO EN JARDINERAS

57 03.05 ACERO PARA SARDINEL PERALTADO EN JARDINERAS

58 03.06 CONCRETO PARA SARDINEL PERALTADO EN JARDINERAS FC=175 KG/CM2 INC. ENCOFRADO

59 03.07 SIEMBRA DE GRASS INCLUYE TIERRA DE CHACRA


60 03.08 PLANTACION DE ARBOLES INCLUYE EXCAVACION

61 03.09 BLOQUE DE CONCRETO 0.30x0.30x0.08 m INC. COMPACTACION

62 03.10 COLOCACION DE GRASS EN BLOQUE DE CONCRETO TIPO MICHI

63 04 VARIOS

64 04.01 NIVELACION DE BUZONES

65 04.02 NIVELACION DE CAJAS DE AGUA Y DESAGUE

66 04.03 REUBICACION DE POSTES DE LUZ/TELÉFONO

67 04.04 PLAN DE MANEJO DE TRANSITO Y DESVIOS

68 04.05 MITIGACION DEL IMPACTO AMBIENTAL

69 04.06 ENSAYOS DE CAMPO

70 04.07 PEDESTAL DE CONCRETO Y PLACA RECORDATORIA

71 04.08 LIMPIEZA FINAL DE OBRA

72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
Und. Metrado Precio (S/.) Parcial (S/.)
2,250,467.33
15,595.78
und 1.00 1,195.78 1,195.78
mes 4.00 1,800.00 7,200.00
mes 4.00 1,800.00 7,200.00
19,558.56
glb 1.00 4,136.00 4,136.00
glb 1.00 9,125.00 9,125.00
mes 4.00 1,574.39 6,297.56
64,576.94
m2 15,971.21 1.22 19,484.88
m2 15,971.21 2.36 37,692.06
glb 1.00 7,400.00 7,400.00
446,081.58
m2 15,971.21 6.24 99,660.35
m3 7,354.63 8.80 64,720.74
m3 9,943.54 28.33 281,700.49
1,669,006.73
m2 15,971.21 3.02 48,233.05
m3 15,971.21 9.48 151,407.07
m2 15,971.21 16.91 270,073.16
m2 15,971.21 62.60 999,797.75
m2 885.61 33.50 29,667.94
kg 7,453.61 4.42 32,944.96
kg 2,253.24 4.17 9,396.01
m2 15,920.61 1.33 21,174.41
m 6,000.49 8.14 48,843.99
kg 10,988.22 5.23 57,468.39
35,647.74
m 743.13 8.12 6,034.22
m2 688.00 33.56 23,089.28
und 11.00 443.47 4,878.17
und 3.00 548.69 1,646.07
1,033,150.02
35,508.81
m2 9,918.66 1.22 12,100.77
m2 9,918.66 2.36 23,408.04
509,065.84
m2 6,833.96 22.65 154,789.19
m3 991.87 21.67 21,493.82
m 4,237.90 2.78 11,781.36
m3 2,332.93 28.33 66,091.91
m2 9,918.66 11.67 115,750.76
m2 9,918.66 14.03 139,158.80
488,575.37
m2 641.64 13.05 8,373.40
m2 9,918.66 38.36 380,479.80
m3 6.11 295.55 1,805.81
m 4,237.97 14.67 62,171.02
m 1,527.09 8.26 12,613.76
m2 624.84 37.02 23,131.58
270,559.70
m2 4,817.67 1.22 5,877.56
m2 4,817.67 2.96 14,260.30
m 1,428.20 3.36 4,798.75
m3 96.40 29.34 2,828.38
kg 2,919.81 3.81 11,124.48
m 1,428.20 16.50 23,565.30
m2 2,003.20 17.72 35,496.70
und 216.00 37.94 8,195.04
m2 2,586.74 44.96 116,299.83
m2 2,586.74 18.60 48,113.36
135,912.60
und 36.00 246.55 8,875.80
und 489.00 53.79 26,303.31
und 9.00 2,500.00 22,500.00
glb 1.00 16,000.00 16,000.00
m2 30,707.55 0.93 28,558.02
und 1.00 14,300.00 14,300.00
und 1.00 950.94 950.94
m2 30,707.55 0.60 18,424.53
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PROYECTO : "MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL, PEATONAL Y HABILITACION DE AREAS VERDES EN LA AV. JOSE CARLOS MARIATEEGUI, SECTOR JCM 1ETAPA, ZONA 1-JOSE CARLOS MARIATEGUI, CENTRO POBLADO DE VMT - DISTRITO DE VMT - PROVINCIA DE LIMA - REGION
FECHA : DICIEMBRE DEL 2018

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4
01 PAVIMENTOS 0.00 0.00 0.00 0.00 0.00
0 0 0 0.00 0.00 0.00 0.00 0.00
01.01 OBRAS PROVISIONALES S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 7.20x3.60m und S/. 1,195.78 S/. 1,195.78 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.01.02 ALQUILER DE LOCAL PARA LA OBRA mes S/. 7,200.00 S/. 7,200.00 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.01.03 ALQUILER DE BAÑO QUIMICO (DISAL) mes S/. 7,200.00 S/. 7,200.00 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.02 SEGURIDAD Y SALUD S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.02.01 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO glb S/. 4,136.00 S/. 4,136.00 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.02.02 EQUIPOS DE PROTECCION PERSONAL glb S/. 9,125.00 S/. 9,125.00 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.02.03 MANTENIENTO DE TRANSITO Y SEGURIDAD VIAL mes S/. 6,297.57 S/. 6,669.30 (105.9%) S/. -267.99 (-4.26%) S/. -103.74 (-1.65%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.03 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.03.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 19,484.88 S/. 19,484.88 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.03.02 TRAZO, NIVELES Y REPLANTEO CON EQUIPO TOPOGRÁFICO m2 S/. 37,692.06 S/. 37,692.06 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.03.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb S/. 7,400.00 S/. 7,400.00 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.04 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.04.01 DEMOLICION DE PAVIMENTO FLEXIBLE C/EQUIPO E=2" m2 S/. 99,660.35 S/. 73,914.76 (74.17%) S/. 25,745.59 (25.83%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.04.02 EXCAVACION A NIVEL SUB RASANTE CON EQUIPO m3 S/. 64,720.74 S/. 26,427.64 (40.83%) S/. 38,293.10 (59.17%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.04.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 S/. 281,700.49 0.00 S/. 281,700.49 (100%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05 PAVIMENTO RIGIDO S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.01 CONFORMACION Y COMPACTACION DE SUB RASANTE CON EQUIPO m2 S/. 48,233.05 S/. 3,617.48 (7.5%) S/. 44,615.57 (92.5%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.02 RELLENO COMPACTADO CON MATERIAL PROPIO MEJORADO E=0.15M C/EQUIPO m3 S/. 151,407.07 0.00 S/. 151,407.07 (100%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.03 BASE GRANULAR E=0.15 m CON EQUIPO m2 S/. 270,073.16 0.00 S/. 226,416.94 (83.84%) S/. 43,656.22 (16.16%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.04 LOSA DE CONCRETO F´C=280 KG/CM2 E=0.20M INC. ACABADO DE PAVIMENTO m2 S/. 999,797.75 0.00 S/. 937,112.97 (93.73%) S/. 62,684.78 (6.27%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.05 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO DE CONCRETO m2 S/. 29,667.94 0.00 S/. 23,484.17 (79.16%) S/. 6,183.77 (20.84%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.06 ACERO LISO REDONDO 5/8" P/ DOWELS kg S/. 32,944.96 0.00 S/. 23,679.13 (71.87%) S/. 9,265.83 (28.13%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.07 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 EN JUNTAS LONGITUDINALES kg S/. 9,396.01 0.00 S/. 7,000.07 (74.5%) S/. 2,395.94 (25.5%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.08 CURADO DE LOSA DE CONCRETO m2 S/. 21,174.41 0.00 0.00 S/. 20,296.66 (95.85%) S/. 877.75 (4.15%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.09 JUNTAS DE CONSTRUCCION INC. CORTE CON DISCO m S/. 48,843.99 0.00 0.00 S/. 18,022.03 (36.9%) S/. 30,821.96 (63.1%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.05.10 CANASTILLA PARA DOWELS kg S/. 57,468.39 0.00 S/. 41,960.35 (73.01%) S/. 15,508.04 (26.99%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.06 SEÑALIZACION S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.06.01 PINTURA EN PAVIMENTO (LINEAL CONTINUA e=0.10m) m S/. 6,034.22 0.00 0.00 0.00 S/. 6,034.22 (100%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.06.02 PINTADO DE SIMBOLOS, LETRAS Y SEÑALES m2 S/. 23,089.28 0.00 0.00 0.00 S/. 23,089.28 (100%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.06.03 SEÑAL PREVENTIVA VERTICAL DE FIBRA DE VIDRIO 0.60x0.60m H=2.40, INC. DADO DE CONCRETO und S/. 4,878.17 0.00 0.00 0.00 S/. 4,878.17 (100%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
01.06.04 GIBA DE CONCRETO F'C=280 KG/CM2 INC. PINTURA RETROREFLECTIVA und S/. 1,646.07 0.00 0.00 0.00 S/. 1,646.07 (100%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
02 VEREDAS, RAMPAS Y ESCALERAS DE CONCRETO S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PROYECTO : "MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL, PEATONAL Y HABILITACION DE AREAS VERDES EN LA AV. JOSE CARLOS MARIATEEGUI, SECTOR JCM 1ETAPA, ZONA 1-JOSE CARLOS MARIATEGUI, CENTRO POBLADO DE VMT - DISTRITO DE VMT - PROVINCIA DE LIMA - REGION
FECHA : DICIEMBRE DEL 2018

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 12,100.77 S/. 12,100.77 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.01.02 TRAZO, NIVELES Y REPLANTEO CON EQUIPO TOPOGRÁFICO m2 S/. 23,408.04 S/. 20,201.83 (86.3%) S/. 3,206.21 (13.7%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.02.01 DEMOLICION DE VEREDAS DE CONCRETO e=10 cm C/ EQUIPO m2 S/. 154,789.19 S/. 32,247.75 (20.83%) S/. 122,541.44 (79.17%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.02.02 EXCAVACION A NIVEL SUB RASANTE MANUAL PARA VEREDAS m3 S/. 21,493.82 0.00 S/. 17,911.52 (83.33%) S/. 3,582.30 (16.67%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.02.03 EXCAVACION MANUAL PARA SARDINELES m S/. 11,781.36 0.00 S/. 5,890.68 (50%) S/. 5,890.68 (50%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 10 KM m3 S/. 66,091.91 0.00 0.00 S/. 66,091.91 (100%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.02.05 CONFORMACION Y COMPACTACION DE SUB RASANTE PARA VEREDAS m2 S/. 115,750.76 0.00 0.00 S/. 77,167.17 (66.67%) S/. 38,583.59 (33.33%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.02.06 BASE GRANULAR PARA VEREDAS E=0.10 m COMPACTADA m2 S/. 139,158.80 0.00 0.00 S/. 83,992.54 (60.36%) S/. 55,166.26 (39.64%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.03.01 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 S/. 8,373.40 0.00 S/. 10,896.33 (130.13%) S/. -2,522.93 (-30.13%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.03.02 CONCRETO EN VEREDAS f'c=175 kg/cm2 H=0.10m (Semipulido y Bruñado @1.00m) m2 S/. 380,479.80 0.00 0.00 S/. 380,479.80 (100%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.03.03 ESCALERA DE CONCRETO f'c= 175 kg/cm2 E=0.10M. INC. ACABADO,BRUÑADO Y CURADO m3 S/. 1,805.81 0.00 0.00 S/. 1,582.19 (87.62%) S/. 223.62 (12.38%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.03.04 SARDINEL DE VEREDA CONCRETO PREMEZCLADO F'C=175KG/CM2 m S/. 62,171.02 0.00 0.00 S/. 26,129.22 (42.03%) S/. 36,041.80 (57.97%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.03.05 JUNTAS DE DILATACION EN VEREDAS @4.00 M m S/. 12,613.76 0.00 0.00 S/. 8,524.74 (67.58%) S/. 4,089.02 (32.42%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
02.03.06 CONCRETO F´c=175 KG/CM2 EN RAMPAS(BRUÑADO@0.10m) m2 S/. 23,131.58 0.00 0.00 S/. 19,011.05 (82.19%) S/. 4,120.53 (17.81%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
03 AREAS VERDES S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 5,877.56 0.00 S/. 5,877.56 (100%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.02 REFINE Y NIVELACION TERRENO NORMAL m2 S/. 14,260.30 0.00 S/. 14,260.30 (100%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.03 EXCAVACION MANUAL PARA SARDINEL PERALTADO EN JARDINERAS m S/. 4,798.75 0.00 S/. 4,198.91 (87.5%) S/. 599.84 (12.5%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.04 ELIMINACION DE MATERIAL EXCEDENTE EN SARDINEL PERALTADO EN JARDINERAS m3 S/. 2,828.38 0.00 S/. 2,828.38 (100%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.05 ACERO PARA SARDINEL PERALTADO EN JARDINERAS kg S/. 11,124.48 0.00 S/. 11,124.48 (100%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.06 CONCRETO PARA SARDINEL PERALTADO EN JARDINERAS FC=175 KG/CM2 INC. ENCOFRADO m S/. 23,565.30 0.00 S/. 16,187.64 (68.69%) S/. 7,377.66 (31.31%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.07 SIEMBRA DE GRASS INCLUYE TIERRA DE CHACRA m2 S/. 35,496.70 0.00 0.00 S/. 35,496.70 (100%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.08 PLANTACION DE ARBOLES INCLUYE EXCAVACION und S/. 8,195.04 0.00 0.00 S/. 7,051.32 (86.04%) S/. 1,143.72 (13.96%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.09 BLOQUE DE CONCRETO 0.30x0.30x0.08 m INC. COMPACTACION m2 S/. 116,299.83 0.00 0.00 S/. 79,841.28 (68.65%) S/. 36,458.55 (31.35%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
03.10 COLOCACION DE GRASS EN BLOQUE DE CONCRETO TIPO MICHI m2 S/. 48,114.13 0.00 0.00 S/. 48,114.13 (100%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
04 VARIOS S/. - 0.00 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
04.01 NIVELACION DE BUZONES und S/. 8,875.80 0.00 0.00 S/. 5,021.83 (56.58%) S/. 3,853.97 (43.42%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
04.02 NIVELACION DE CAJAS DE AGUA Y DESAGUE und S/. 26,303.31 0.00 S/. 17,842.39 (67.83%) S/. 8,460.92 (32.17%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
04.03 REUBICACION DE POSTES DE LUZ/TELÉFONO und S/. 22,500.00 0.00 0.00 S/. 22,500.00 (100%) 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
04.04 PLAN DE MANEJO DE TRANSITO Y DESVIOS glb S/. 16,000.00 S/. 16,000.00 (100%) 0.00 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
04.05 MITIGACION DEL IMPACTO AMBIENTAL m2 S/. 28,558.03 S/. 7,394.49 (25.89%) S/. 7,904.45 (27.68%) S/. 7,139.51 (25%) S/. 6,119.58 (21.43%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
04.06 ENSAYOS DE CAMPO und S/. 14,299.21 0.00 S/. 14,299.21 (100%) 0.00 0.00
0 0 0 S/. - 0.00 0.00 0.00 0.00
04.07 PEDESTAL DE CONCRETO Y PLACA RECORDATORIA und S/. 950.94 0.00 0.00 0.00 S/. 950.94 (100%)
0 0 0 S/. - 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
PROYECTO : "MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL, PEATONAL Y HABILITACION DE AREAS VERDES EN LA AV. JOSE CARLOS MARIATEEGUI, SECTOR JCM 1ETAPA, ZONA 1-JOSE CARLOS MARIATEGUI, CENTRO POBLADO DE VMT - DISTRITO DE VMT - PROVINCIA DE LIMA - REGION
FECHA : DICIEMBRE DEL 2018

PRESUPUESTO S/. / MESES


ITEM PARTIDAS Und S/. MES 1 MES 2 MES 3 MES 4
04.08 LIMPIEZA FINAL DE OBRA m2 S/. 18,424.53 0.00 0.00 0.00 S/. 18,424.53 (100%)
0 0 0 S/. - 0.00 0.00 0.00 0.00

COSTO DIRECTO 3,690,089.65 292,007.74 2,056,116.96 1,069,441.39 272,523.56


GASTOS GENERALES 295,207.17 23,360.62 164,489.36 85,555.31 21,801.88
UTILIDAD 258,306.28 20,440.54 143,928.19 74,860.90 19,076.65
PRESUPUESTO PARCIAL 4,243,603.09 335,808.90 2,364,534.50 1,229,857.59 313,402.09
IGV (18% ST) 763,848.56 60,445.60 425,616.21 221,374.37 56,412.38
TOTAL DE OBRA (VALOR REFERENCIAL) 5,007,451.65 396,254.50 2,790,150.71 1,451,231.96 369,814.47
AVANCE MENSUAL (%) 100.00% 7.97% 56.15% 29.21% 7.44%
AVANCE ACUMULADO (%) 100.00% 7.97% 64.12% 93.33% 100.00%