Working Time Sheet

Name: INDRAWAN
Assignment: QS Estimator
Month: April 2018

Work Time
Date Site Home Work Items Project Project Code
Start End
4/1/18 Sun

4/2/18 Mon

4/3/18 Tue

4/4/18 Wed

4/5/18 Thu

4/6/18 Fri

4/7/18 Sat

4/8/18 Sun

4/9/18 Mon

4/10/18 Tue

4/11/18 Wed

4/12/18 Thu

4/13/18 Fri

4/14/18 Sat

4/15/18 Sun

4/16/18 Mon

4/17/18 Tue

4/18/18 Wed

4/19/18 Thu

4/20/18 Fri

4/21/18 Sat

4/22/18 Sun

4/23/18 Mon 8:30 17:30 Preparing materials for design review meeting Pettarani Elevated Toll Road JA18R1020

4/24/18 Tue 8:30 17:30 Meeting with WIKA and preparing for design review Pettarani Elevated Toll Road JA18R1020

Review the drawing measure, calculated the quantity, and


4/25/18 Wed 8:30 17:30 Pettarani Elevated Toll Road JA18R1020
load calculation base on drawing Rev.10R
Review the drawing measure, calculated the quantity, and
4/26/18 Thu 8:30 17:30 Pettarani Elevated Toll Road JA18R1020
load calculation base on drawing Rev.10R
Review the drawing measure, calculated the quantity, and
4/27/18 Fri 8:30 17:30 Pettarani Elevated Toll Road JA18R1020
load calculation base on drawing Rev.10R

4/28/18 Sat

4/29/18 Sun

Review the drawing measure, calculated the quantity, and


4/30/18 Mon 8:30 17:30 Pettarani Elevated Toll Road JA18R1020
load calculation base on drawing Rev.10R
30 30

Prepared by Approved by Project Team Leader