China Harbour Engineering Co.L.L.C. INSPECTION AND TESTING PLAN (ITP): concrete repairs

Contractor: Date:
Contract No. & Location:
Description of Activity:

SERIAL No.: PAGE NO.:

Legend for acceptance criteria: *AR = Approval *H = Hold Point *M = Monitoring *S = Surveillance *A = Actual Inspection *T/C = Test Certificate Reqd.

INSPECTION & ACCEPTANCE REMARKS/FORM


ITEM No. DESCRIPTION SPECSIFICATION HGC CHEC DORSCH REPORT NO

1.0 MATERIAL&DOCUMENT APPROVAL

1.1 Clause 3.3 of Section 03300- Cast in Place of Concrete, Vol.4 part A- Civil &
Concrete Repair Material Approval
Architectural Specifications

1.2 Method Statement, Quality Control Procedure, Clause 3.3 of Section 03300-Cast in Place Concrete, Vol-4 & Manufacturer’s
Check Sheet, Risk Assessment Approval. Product data Sheet

1.3 Clause 3.3 of Section 03300-Cast in Place Concrete, Vol-4 & Manufacturer’s
Repair Material Deliveries to the Site
Product data Sheet

2.0 EXECUTION

2.1 Clause 3.3 of Section 03300-Cast in Place Concrete, Vol-4 & Manufacturer’s
Surface Preparation
Product data Sheet

2.2 Mixing of Materials Manufacturer’s Product Data Sheet

2.3 Application of Repair Material Manufacturer’s Product Data Sheet

2.4 Curing Manufacturer’s Product Data Sheet

2.5 Testing of Material Cubes Manufacturer’s Product Data Sheet

Contractor: (Name, Signature & Date) Consultant: Approved By (Name, Signature &
Date)

CC: PM, RE, QA/QC, RE/ARE