You are on page 1of 302

No.

Uraian Pekerjaan

I.1

I.2

I.3

I.4

I.5

I.6

II.1

II.2

II.3

II.4

II.5

II.6

II.7

II.8

III.1
III.2

III.3
III.4
Uraian Pekerjaan

PEKERJAAN PERSIAPAN
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting
Volume Harga Satuan Jumlah Harga

Ls 1.00 740,000,000.00 740,000,000.00

Ls 1.00 1,251,945,000.00 1,251,945,000.00

m2 34,555.27 3,060.00 105,739,126.20

Ls 1.00 1,632,120,634.00 1,632,120,634.00

Ls 1.00 1,755,956,854.00 1,755,956,854.00

Unit 2.00 61,489,410.00 122,978,820.00

m3 98,677.01 16,067.00 1,585,443,519.67

m3 52,752.32 32,133.00 1,695,090,298.56

m3 9,270.28 18,331.00 169,933,502.68

m3 18,533.21 23,398.00 433,640,047.58

m3 27,796.13 34,203.00 950,711,034.39

m3 37,066.41 45,063.00 1,670,323,633.83

m3 825.38 27,957.00 23,075,148.66

m3 50,311.00 16,599.00 835,112,289.00

m3 3,192.92 874,044.14 2,790,753,003.89


m3 112,315.76 827,500.00 92,941,291,400.00

kg 119,897.26 10,500.00 1,258,921,230.00


m2 17,654.67 126,963.00 2,241,489,867.21
Bobot (%) PER
PER DKO -1 PER DK -1 PER DK -2
REVETMENT

0.660% 0.05 0.06 0.04 0.07


1.116% 0.06 0.07 0.06 0.07
0.094% 1,630.46 799.64 1,442.95 686.33
1.455% 0.07 0.07 0.06 0.07
1.565% 0.07 0.07 0.06 0.07
0.110% 0.00 0.00 0.00 0.00

1.413% 6,315.23 3,245.09 6,837.08 4,820.26


1.511% 5,227.11 1,154.53 1,459.30 3,494.98
0.151% 0.00 0.00 0.00 0.00
0.386% 0.00 0.00 0.00 0.00
0.847% 0.00 0.00 0.00 0.00
1.489% 0.00 0.00 120.00 0.00
0.021% 0.00 189.29 3,083.98 47.63
0.744% 300.00 2,289.86 3,225.13 1,639.03

2.487% 74.14 69.78 0.00 75.50


82.832% 2,525.28 2,018.87 3,488.39 1,561.23
1.122% 2,982.82 4,404.89 123,018.79 4,206.81
1.998% 2,308.83 1,687.83 5,702.56 1,551.52
S.d Pekan 17

PER DPS -2 PER DKO-2 DPS - 6 BO DK3 BO DKI4

0.05 0.05 0.00 0.00 0.00


0.07 0.07 0.06 0.07 0.06
3,185.82 2,653.51 4,523.22 2,319.98 2,468.23
0.07 0.07 0.00 0.07 0.04
0.07 0.07 0.00 0.07 0.04
0.00 1.00 0.00 0.00 0.00

3,736.37 9,328.98 0.00 14,688.14 0.00


2,522.26 7,135.93 0.00 33,464.87 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
123.52 44.30 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00

86.58 46.63 0.00 179.04 0.00


2,579.10 2,080.99 0.00 3,426.25 0.00
2,122.04 1,593.20 0.00 5,509.15 0.00
1,721.44 1,132.88 0.00 1,750.67 0.00
REV
BO-DKO1 BO-DK2 TAMBAHAN TOTAL
(DK1 - DKO2)

0.01 0.00 0.00 0.334


0.01 0.06 0.00 0.655
2,468.23 3,210.00 0.00 25,388.370
0.04 0.07 0.00 0.634
0.04 0.07 0.00 0.634
0.00 0.00 0.00 1.000

1,736.67 1,070.92 0.00 51,778.738


1,396.26 770.04 0.00 56,625.281
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 0.000
0.00 0.00 0.00 120.000
0.00 0.00 0.00 3,488.720
0.00 0.00 0.00 7,454.021

0.00 36.31 0.00 567.987


3,434.92 1,118.25 86.89 22,320.178
0.00 1,202.38 3,120.15 148,160.219
1,491.82 734.87 126.53 18,208.954
No LOKASI SAT
Rivertment
Subdam Maindam
Kiri Kanan

1 PER DKO 1
Pengecoran m3
Bekisting m2
Pembesian kg

2 PER DK-1
Pengecoran m3 606.49 883.41
Bekisting m2 473.98 568.88
Pembesian kg 2,447.16 1,957.73

3 PER REVt (KONTRAK)


Pengecoran m3 1,295.48 1,295.48
Bekisting m3 2,008.53 2,008.53
Pembesian kg 4,674.04 4,767.52

4 RIVERTMENT DKO-DK1
Pengecoran m3 1,362.98 1,362.98
Bekisting m3 2,113.26 2,113.26
Pembesian kg 4,512.96 4,603.21

5 PER DK-2
Pengecoran m3 1,855.09 2,834.28
Bekisting m3
Pembesian kg 4,705.61 5,671.87

6 PER DPS-2
Pengecoran m3 677.18 1,102.05
Bekisting m3 517.18 567.51
Pembesian kg

7 PER DKO-2
Pengecoran m3 742.75 1,397.43
Bekisting m3 520.04 914.11
Pembesian kg 1,714.38 1,472.01

8 BO DPS-6
Pengecoran m3 2,709.28 6,341.49
Bekisting m2 1,535.92 3,069.30
Pembesian kg 5,381.68 7,676.60
9 BO DK-3
Pengecoran m3 1,099.30 2,608.39
Bekisting m2 836.69 1,199.00
Pembesian kg 4,331.09 5,008.35

10 BO DKI-4
Pengecoran m3 1,017.98 2,936.84
Bekisting m2 769.77 1,426.76
Pembesian kg 3,518.16 4,469.96

11 BO-DKO-1
Pengecoran m3 942.77 7,680.53
Bekisting m2 705.53 2,504.99
Pembesian kg 3,809.69 6,350.72

12 BO DK-2
Pengecoran m3 1,855.09 2,834.28
Bekisting m2 -
Pembesian kg 4,705.61 5,671.87
Galian m3 6,905.81 1,303.02
Urugan m3 1,472.02 2,116.05

13 BO DKI-6
Pengecoran m3 1,485.93 2,148.05
Bekisting m2 980.92 1,205.24
Pembesian kg 3,971.27 8,715.98
Galian m3 7,677.52 8,366.79
Urugan m3 1,601.65 788.46

14 BO DKI-5
Pengecoran m3 1,955.11 3,079.16
Bekisting m2 1,091.74 1,361.33
Pembesian kg 5,129.17 7,560.19
Galian m3 1,578.92 2,699.63
Urugan m3 1,729.71 1,813.70

15 BO DPS 5
Pengecoran m3 1,154.84 3,424.31
Bekisting m2 896.36 2092.56
Pembesian kg 10,918.53 5,671.87
Galian m3 2,388.18 1,962.54
TOTAL
LOKASI PENGECORAN

Saluran Dinding Apron Dinding Apron Retaining


Apron Sand Strap
Pembagi Kanan Kiri Wall Hulu

208.02
16.75 162.03 501.92

1,423.15 570.80

150.63 103.83 103.83


25.20 221.11 221.11

429.24 636.10
24.38 141.70 141.70 1,085.73

1,362.33 210.51 170.72 636.89


540.80 378.95 329.83 1,262.29
618.15 142.35 111.88 227.29
42.39 219.50 172.26 327.52

1,198.89 301.82
516.18 371.89

652.43
305.17

1,423.15 - - 570.80
- - - -
- - - -
710.73 - - 500.35
1,578.69 - - 3,175.15

1,207.03 502.10 167.81 745.70


886.17 699.19

6,056.03 6,165.14
1,123.84 1,577.13

1,261.66 368.00 313.29 496.57


1,068.58 615.45

798.88
790.85 673.41

1,517.68
591.46 104.9327

1,488.06
Retaining Wall Tanggul
Hilir

189.27

282.33

354.43 235.99
726.86 848.49

123.31
216.29

418.37
783.52
988.11
1,319.88

404.31
201.17

246.90
500.25

282.33
-
-
334.53

674.13
1,214.89

4,834.37
1,558.21

374.88
1,176.54

784.50
725.93

127.66
140.3164

1,120.14
1 Maindam
31.20 18.75

10.50
17.08

1.91

1.00
17.58
2.40
1.20
4.00 18.18

1.20
2.40

1.20
18.78

1.20
3.00

1.20

0.98
15.48

0.98
4.00
0.98

0.98

0.98
16.08

1.62
4.50

0.98

0.98

16.70 16.75

4.50 4.50 5.50 33.50 2.00 2.00 2.70

22.20

RETAINING WALL

1.1 0.6
1.0
1.1
0.9 1.0
1.1
1.2 1.0
3.4 1.4 1.0
2.4

1.4
1.4
TAHAPAN RENCANA PENGECORAN MAINDAM BO DKI 5
Subdam
17.50

10.50

6.36

1.91
1.00
1.22
1.20
1.20
1.20
2.40
1.20 1.00 Stage 9 - A = 3.45m2 1.20
1.20
1.20 0.98 Stage 8 - A = 4.27m2 1.20
1.20
2.40
1.20
0.98 Stage 7 - A = 5.13 m2
1.20
1.20
1.20
0.98 Stage 6 - A = 6.00 m2
1.20 1.20
0.98
0.98 Stage 5 - A = 6.87 m2
0.98 9.50 9.50 1.00
1.98
0.98 0.98 Stage 4 - A = 7.75 m2
1.00

0.98
1.20
1.05
0.98
1.62 Stage 3 - A = 14.65 m2
1.20
0.95
1.62 0.98 Stage 2 - A = 10.05 m2
1.02
0.98 0.98 Stage 1 - A = 10.92 m2
0.98
0.98

11.55
16.00

1.50 32.00
2.00 2.00 2.70

Apron

1.1 0.6
1.0
1.1
0.9 1.0
1.1
1.2 1.0

1.4 1.0

1.4
1.4

7.50 3.00

Exst. As Saluran

Stage 10 - R = 0.32 m2

Stage 9 - R = 0.84 m2

Stage 9 - R = 1.14 m2
Exst. As Saluran

Stage 10 - R = 0.32 m2

Stage 9 - R = 0.84 m2

Stage 9 - R = 1.14 m2
Stage 9 - R = 1.10 m2
Stage 9 - R = 0.84 m2

Stage 8 - R = 1.23 m2

4.00 Stage 7 - R = 1.63 m2

Stage 6 - R = 2.45 m2
Stage 5 - R = 0

Stage 4 - R = 1.19 m2

Stage 3 - R = 2.63 m2

4.00 Stage 2 - R = 2.06 m2

Stage 1 - R = 3.00 m2
0 17.50

2.00
4.88

1.91

1.22

2.40

1.00 Stage 6 - A = 2.45 m2 1.30

2.40
2.40
1.07 Stage 5 - A = 3.60 m2 1.20

0.98 Stage 4 - A = 4.23 m2 1.20


6.00
0.98 Stage 3 - A = 5.10 m2 1.20

0.98 Stage 2 - A = 5.97 m2 1.20

0.98 Stage 1 - A = 6.84 m2

16.00 16.00

1.50
32.00 7.40

40.00

7.50 3.00 20.00 3.00 6.00

CL
Exst. As Saluran
0.50

0.95

Stage 10 - R = 0.32 m2
1.20

Stage 9 - R = 0.84 m2

5.03
1.20
4.00
Stage 9 - R = 1.14 m2
CL
Exst. As Saluran
0.50

0.95

Stage 10 - R = 0.32 m2
1.20

Stage 9 - R = 0.84 m2

5.03
1.20
4.00
Stage 9 - R = 1.14 m2
1.20
Stage 9 - R = 1.10 m2
1.21
Stage 9 - R = 0.84 m2
1.20
1.14
Stage 8 - R = 1.23 m2

+ 864.69
1.20
Stage 7 - R = 1.63 m2 1.14
4.00
1.15
Stage 6 - R = 2.45 m2
1.09 1.00
Stage 5 - R = 0.74 m2
1.19
1.13
Stage 4 - R = 1.19 m2
1.20
Stage 3 - R = 2.63 m2 1.14

Stage 2 - R = 2.06 m2 1.14


1.20 4.00
Stage 1 - R = 3.00 m2 1.00

32.00
20

1.20

1.20

1.20

4.00
4.00

4.00

4.00
SCHEDULE PELAKSANAAN 2018
Jam Kerja :
Hari Kerja Efektif / Bulan :
Sisa Pekerjaan

No Uraian Pekerjaan
Volume

A PERSIAPAN

B MOBILISASI ALAT

C GALIAN + COFFERDAM

D DEWATERING

E PEKERJAAN MAINDAM 2,936.84


Tahapan Pengecoran Sisi Kanan K175 3,029.07
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Stage 11
Stage 12
Tahapan Pengecoran Sisi Kanan K225
Stage 9
Stage 10
Stage 11
Stage 12

Tahapan Pengecoran Sisi Kiri K175


Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Stage 10
Stage 11
Stage 12
Tahapan Pengecoran Sisi Kiri K225
Stage 9
Stage 10
Stage 11
Stage 12

F PEKERJAAN SUBDAM 1,017.98


Tahapan Pengecoran Sisi Kanan K175 1,093.61
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Tahapan Pengecoran Sisi Kanan K225
Stage 6
Stage 7
Stage 8
Stage 9

Tahapan Pengecoran Sisi Kiri K175


Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
Stage 9
Tahapan Pengecoran Sisi Kiri K225
Stage 6
Stage 7
Stage 8
Stage 9

F PEKERJAAN APRON DAN DINDING APRON 1,198.89


Tahapan Pengecoran Sisi Kanan K175 1,274.04
Stage 1 Pondasi Sayap Apron
Stage 2 Sayap Apron
Stage 3 Sayap Apron
Stage 4 Sayap Apron
Stage 5 Sayap Apron
Stage 6 Sayap Apron
Stage 7 Sayap Apron
Stage 8 Sayap Apron
Stage 9 Sayap Apron
Tahapan Pengecoran Sisi Kiri K175
Stage 1 Pondasi Sayap Apron
Stage 2 Sayap Apron
Stage 3 Sayap Apron
Stage 4 Sayap Apron
Stage 5 Sayap Apron
Stage 6 Sayap Apron
Stage 7 Sayap Apron
Stage 8 Sayap Apron
Stage 9 Sayap Apron
Plat Lantai Apron
Stage 1 Plat Apron Kanan
Stage 1 Plat Apron Kiri

G PEKERJAAN RETAINING WALL 404.31


Sisi Hilir (Kiri, Trap 1) 394.72
Stage 1 Pondasi
Stage 2
Stage 3
Stage 4
Stage 5
Sisi Hilir (Kiri, Trap 2)
Stage 6
Stage 7
Stage 8
Stage 9
Sisi Hilir (Kiri, Trap 3)
Stage 10
Stage 11
Stage 12
Stage 13

Sisi Hilir (Kiri, Trap 1)


Stage 1 Pondasi
Stage 2
Stage 3
Stage 4
Stage 5
Sisi Hilir (Kiri, Trap 2)
Stage 6
Stage 7
Stage 8
Stage 9
Sisi Hilir (Kiri, Trap 3)
Stage 10
Stage 11
Stage 12
Stage 13
7 jam
25 hari
Sisa Pekerjaan Lebar Bangunan Stage Pekerjaan Beton Stage Pekerjaan B

Volume Vol. Beton


Panjang Lebar Tinggi Luas Panjang Tinggi
Beton ACC
Satuan
(m) (m) (m) (m2) (m) (m3) (m3) (m)

1 2 3 4

m3
92.23
10.00 16.75 167.50 167.50 1.20
10.05 16.75 168.34 335.84 1.20
14.65 16.75 245.39 581.23 1.98
7.75 16.75 129.81 711.04 1.20
6.87 18.00 123.66 834.70 1.20
6.00 18.00 108.00 942.70 1.20
5.13 18.00 92.34 1,035.04 1.20
4.27 18.00 76.86 1,111.90 1.20
3.45 9.88 34.09 1,145.98 1.20
7.20 10.33 74.38 1,220.36 1.20
7.20 10.48 75.46 1,295.82 1.20
3.50 9.61 33.62 1,329.43 1.20

3.45 10.92 37.67 1,367.11 1.20


2.40 3.00 7.20 1,374.31 2.40
2.40 3.00 7.20 1,381.51 2.40
1.90 3.00 5.70 1,387.21 1.90

10.00 16.70 167.00 1,554.21 1.20


10.00 16.70 167.00 1,721.21 1.20
14.65 16.70 244.66 1,965.86 1.98
7.75 16.70 129.43 2,095.29 1.20
6.87 22.20 152.51 2,247.80 1.20
6.00 22.20 133.20 2,381.00 1.20
5.13 22.20 113.89 2,494.89 1.20
4.27 22.20 94.79 2,589.68 1.20
3.45 15.78 54.44 2,644.12 1.20
7.20 14.98 107.86 2,751.98 1.20
7.20 18.03 129.82 2,881.79 1.20
3.60 17.33 62.39 2,944.18 1.20

3.45 18.78 64.79 3,008.97 1.20


2.40 3.00 7.20 3,016.17 2.40
2.40 3.00 7.20 3,023.37 2.40
1.90 3.00 5.70 3,029.07 1.90

m3

6.48 16.00 103.68 3,132.75 1.20


5.97 16.00 95.52 3,228.27 1.20
5.10 16.00 81.60 3,309.87 1.20
4.23 16.00 67.68 3,377.55 1.20
3.60 17.50 63.00 3,440.55 1.50
2.45 6.63 16.24 3,456.80 1.20
4.80 6.53 31.34 3,488.14 2.40
4.80 6.08 29.18 3,517.32 2.40
2.40 5.18 12.43 3,529.76 1.20
2.45 10.62 26.02 3,555.78 1.20
2.40 3.00 7.20 3,562.98 2.40
2.40 3.00 7.20 3,570.18 2.40
1.90 3.00 5.70 3,575.88 1.20

6.48 16.00 103.68 3,679.56 1.20


5.97 16.00 95.52 3,775.08 1.20
5.10 16.00 81.60 3,856.68 1.20
4.23 16.00 67.68 3,924.36 1.20
3.60 17.50 63.00 3,987.36 1.50
2.45 6.63 16.24 4,003.60 1.20
4.80 6.53 31.34 4,034.94 2.40
4.80 6.08 29.18 4,064.13 2.40
2.40 5.18 12.43 4,076.56 1.20

2.45 10.62 26.02 4,102.58 1.20


2.40 3.00 7.20 4,109.78 2.40
2.40 3.00 7.20 4,116.98 2.40
1.90 3.00 5.70 4,122.68 1.20

m3
m3
3.20 15.07 48.22 4,170.90 1.20
3.20 15.07 48.22 4,219.13 1.20
2.75 15.07 45.59 4,264.71 1.20
2.45 15.07 40.61 4,305.33 1.20
2.09 15.07 34.65 4,339.97 1.20
1.73 15.07 28.68 4,368.65 1.20
1.27 15.07 21.05 4,389.70 1.20
0.81 15.07 13.43 4,403.13 1.20
0.50 15.07 3.77 4,406.90 1.20
3.20 20.95 67.04 4,473.94 1.20
3.20 20.95 67.04 4,540.98 1.20
2.75 20.95 63.37 4,604.35 1.20
2.45 20.95 56.46 4,660.81 1.20
2.09 20.95 48.16 4,708.98 1.20
1.73 20.95 39.87 4,748.84 1.20
1.27 20.95 29.27 4,778.11 1.20
0.81 20.95 18.67 4,796.78 1.20
0.50 20.95 5.24 4,802.02 1.20

198 1.5 297.35 5,099.37 15.90


198 1.5 297.35 5,396.72

3.00 10.51 34.68 34.68 1


2.06 10.51 23.82 58.50 1.2
2.63 10.51 30.41 88.90 1.2
1.19 10.51 13.76 102.66 1.19
0.74 10.51 8.56 111.22 1.15

2.45 7.6 20.48 131.70 1


1.63 7.6 13.63 145.33 1.2
1.23 7.6 10.28 155.61 1.2
0.84 7.6 7.02 162.63 1.2

1.10 4.3 5.20 167.83 1.2


1.14 4.3 5.39 173.23 1.2
0.84 4.3 3.97 177.20 1.2
0.32 4.3 1.51 178.71 0.95

3.00 9.77 32.24 32.24 1


2.06 9.77 22.14 54.38 1.2
2.63 9.77 28.26 82.64 1.2
1.19 9.77 12.79 95.43 1.19
0.74 9.77 7.95 103.39 1.15

2.45 14.27 38.46 141.84 1


1.63 14.27 25.59 167.43 1.2
1.23 14.27 19.31 186.74 1.2
0.84 14.27 13.19 199.92 1.2

1.10 4.3 5.20 205.13 1.2


1.14 4.3 5.39 210.52 1.2
0.84 4.3 3.97 214.49 1.2
0.32 4.3 1.51 216.00 0.95
Stage Pekerjaan Bekisting Kebutuhan Material

Volume Vol. Bek. Jumlah


BeKisting ACC Panel Split Pasir Batu Kali Semen K 225 Semen K 175 1
(m2) (m2) 2.88 0.79 0.47 1.60 350.00 280.00

20.10 20.1 17.00 15.88 9.45 32.16 5,628.00


20.10 40.2 17.00 15.88 9.45 32.16 5,628.00
33.17 73.365 29.00 26.20 15.59 53.06 9,286.20
20.10 93.465 17.00 15.88 9.45 32.16 5,628.00
21.60 115.065 18.00 17.06 10.15 34.56 6,048.00
21.60 136.665 18.00 17.06 10.15 34.56 6,048.00
21.60 158.265 18.00 17.06 10.15 34.56 6,048.00
21.60 179.865 17.00 17.06 10.15 34.56 6,048.00
11.86 191.721 9.00 9.37 5.57 18.97 3,319.68
12.40 204.117 11.00 9.79 5.83 19.83 3,470.88
12.58 216.693 11.00 9.94 5.91 20.12 3,521.28
11.53 228.219 9.00 9.11 5.42 18.44 3,227.28

13.10 13.104 11.00 10.35 6.16 20.97 4,586.40


7.20 20.304 7.00 5.69 3.38 11.52 2,520.00
7.20 27.504 7.00 5.69 3.38 11.52 2,520.00
5.70 33.204 5.00 4.50 2.68 9.12 1,995.00

20.04 20.04 17.00 15.83 9.42 32.06 5,611.20


20.04 40.08 17.00 15.83 9.42 32.06 5,611.20
33.07 73.146 27.00 26.12 15.54 52.91 9,258.48
20.04 93.186 17.00 15.83 9.42 32.06 5,611.20
26.64 119.826 20.00 21.05 12.52 42.62 7,459.20
26.64 146.466 20.00 21.05 12.52 42.62 7,459.20
26.64 173.106 20.00 21.05 12.52 42.62 7,459.20
26.64 199.746 19.00 21.05 12.52 42.62 7,459.20
18.94 218.682 15.00 14.96 8.90 30.30 5,302.08
17.98 236.658 15.00 14.20 8.45 28.76 5,033.28
21.64 258.294 19.00 17.09 10.17 34.62 6,058.08
20.80 279.09 15.00 16.43 9.77 33.27 5,822.88

22.54 22.536 17.00 17.80 10.59 36.06 7,887.60 6,310.08


7.20 29.736 7.00 5.69 3.38 11.52 2,520.00 2,016.00
7.20 36.936 7.00 5.69 3.38 11.52 2,520.00 2,016.00
5.70 42.636 5.00 4.50 2.68 9.12 1,995.00 1,596.00

19.20 19.2 16.00 15.17 9.02 30.72 5376


19.20 38.4 16.00 15.17 9.02 30.72 5376
19.20 57.6 16.00 15.17 9.02 30.72 5376
19.20 76.8 15.00 15.17 9.02 30.72 5376
26.25 103.05 19.00 20.74 12.34 42 7350
7.96 111.006 7.00 6.29 3.74 12.7296 2227.68
15.67 126.678 12.00 12.38 7.37 25.0752 4388.16
14.59 141.27 12.00 11.53 6.86 23.3472 4085.76
6.22 147.486 5.00 4.91 2.92 9.9456 1740.48
12.74 12.744 9.00 10.07 5.99 20.3904 4460.4 3568.32
7.20 19.944 7.00 5.69 3.38 11.52 2520 2016
7.20 27.144 7.00 5.69 3.38 11.52 2520 2016
3.60 30.744 3.00 2.84 1.69 5.76 1260 1008

19.20 19.2 16.00 15.17 9.02 30.72 5376


19.20 38.4 16.00 15.17 9.02 30.72 5376
19.20 57.6 16.00 15.17 9.02 30.72 5376
19.20 76.8 15.00 15.17 9.02 30.72 5376
26.25 103.05 19.00 20.74 12.34 42 7350
7.96 111.006 7.00 6.29 3.74 12.7296 2227.68
15.67 126.678 12.00 12.38 7.37 25.0752 4388.16
14.59 141.27 12.00 11.53 6.86 23.3472 4085.76
6.22 147.486 5.00 4.91 2.92 9.9456 1740.48

12.74 12.744 9.00 10.07 5.99 20.3904 4460.4 3568.32


7.20 19.944 7.00 5.69 3.38 11.52 2520 2016
7.20 27.144 7.00 5.69 3.38 11.52 2520 2016
3.60 30.744 3.00 2.84 1.69 5.76 1260 1008

18.08 18.084 13.00 14.29 8.50 28.9344 5063.52


18.08 18.084 13.00 14.29 8.50 28.9344 5063.52
18.08 18.084 13.00 14.29 8.50 28.9344 5063.52
18.08 18.084 13.00 14.29 8.50 28.9344 5063.52
18.08 18.084 13.00 14.29 8.50 28.9344 5063.52
18.08 18.084 13.00 14.29 8.50 28.9344 5063.52
18.08 18.084 12.00 14.29 8.50 28.9344 5063.52
18.08 18.084 12.00 14.29 8.50 28.9344 5063.52
18.08 18.084 12.00 14.29 8.50 28.9344 5063.52
25.14 25.14 19.00 19.86 11.82 40.224 7039.2
25.14 25.14 19.00 19.86 11.82 40.224 7039.2
25.14 25.14 19.00 19.86 11.82 40.224 7039.2
25.14 25.14 19.00 19.86 11.82 40.224 7039.2
25.14 25.14 19.00 19.86 11.82 40.224 7039.2
25.14 25.14 19.00 19.86 11.82 40.224 7039.2
25.14 25.14 18.00 19.86 11.82 40.224 7039.2
25.14 25.14 18.00 19.86 11.82 40.224 7039.2
25.14 25.14 18.00 19.86 11.82 40.224 7039.2

23.85 23.85 85.00 18.84 11.21 38.16 6678


-

10.51 10.51 9.00 8.30 4.94 16.816 2942.8


12.61 12.612 9.00 9.96 5.93 20.1792 3531.36
12.61 12.612 9.00 9.96 5.93 20.1792 3531.36
12.51 12.5069 8.00 9.88 5.88 20.01104 3501.932
12.09 12.0865 8.00 9.55 5.68 19.3384 3384.22

7.60 7.6 7.00 6.00 3.57 12.16 2128


9.12 9.12 7.00 7.20 4.29 14.592 2553.6
9.12 9.12 6.00 7.20 4.29 14.592 2553.6
9.12 9.12 6.00 7.20 4.29 14.592 2553.6

5.16 5.16 4.00 4.08 2.43 8.256 1444.8


5.16 5.16 4.00 4.08 2.43 8.256 1444.8
5.16 5.16 4.00 4.08 2.43 8.256 1444.8
4.09 4.085 2.00 3.23 1.92 6.536 1143.8

9.77 9.77 7.00 7.72 4.59 15.632 2735.6


11.72 11.724 9.00 9.26 5.51 18.7584 3282.72
11.72 11.724 9.00 9.26 5.51 18.7584 3282.72
11.63 11.6263 8.00 9.18 5.46 18.60208 3255.364
11.24 11.2355 8.00 8.88 5.28 17.9768 3145.94

14.27 14.27 11.00 11.27 6.71 22.832 3995.6


17.12 17.124 13.00 13.53 8.05 27.3984 4794.72
17.12 17.124 12.00 13.53 8.05 27.3984 4794.72
17.12 17.124 12.00 13.53 8.05 27.3984 4794.72

5.16 5.16 4.00 4.08 2.43 8.256 1444.8


5.16 5.16 4.00 4.08 2.43 8.256 1444.8
5.16 5.16 4.00 4.08 2.43 8.256 1444.8
4.09 4.085 2.00 3.23 1.92 6.536 1143.8
2 3 4 5 6 7 8 9
10 11 12 13 14 15 16 17
18 19 20 21 22 23 24 25
26 27 28 29 30 31 32 33
34 35 36 37 38 39 40 41
JADWAL PELA

42 43 44 45 46 47 48 49
JADWAL PELAKSANAAN

50 51 52 53 54 55 56 57
58 59 60 61 62 63 64 65
66 67 68 69 70 71 72 73
74 75 76 77 78 79 80 81
82 83 84 85 86 87 88 89
90 91 92 93 94 95 96 97
98 99 100
SCHEDULE PELAKSANAAN 2018 s/d 2019
Jam Kerja
Hari Kerja Efektif / Bulan

No Uraian Pekerjaan

A BO - DKI 4
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting
TOTAL
B BO - DKI 5
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

C BO - DKI 6
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting
D BO - DK 3
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

E BO - DPS 6
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting
F BO - DKO 1
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

G BO-DK 2
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

H BO-DPS 5
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

I PEREVETMENT
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

J RIVERT DKO2-DK1
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

K PER-DPS 2
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

L PER-DKO 1
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

M PER-DKO 2
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian
Beton Mutu K-225
Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

N PER-DK 1
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting

O PER-DK 2
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian
Beton Mutu K-225
Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting
Total

Mobilisasi dan Demobilisasi


Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara

Galian Pasir Berbatu (kedalaman ≤ 3 m)


Galian Pasir Berbatu (kedalaman > 3 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 10 m < L ≤ 100 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 100 m < L ≤ 1000 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak 1000 m < L ≤ 2500 m)
Hasil Galian Pasir Berbatu diangkut (dengan jarak L > 2500 m)
Timbunan Tanah Setempat
Urugan Kembali Bekas Galian

Beton Mutu K-225


Beton Mutu K-175
Pembesian Dengan Besi Ulir
Bekisting
2019
: 7 jam
: 25 hari
MC-0 Sisa Pekerjaan

Harsat
Volume Satuan Volume Satuan

0.07 Ls 0.00 Ls 740,000,000.00


0.07 Ls 0.06 Ls 1,251,945,000.00
3,399.00 m2 2468.23 m2 3,060.00
0.07 Ls 0.04 Ls 1,632,120,634.00
0.07 Ls 0.04 Ls 1,755,956,854.00
- Unit 0.00 Unit 61,489,410.00

7,425.53 m3 0.00 m3 16,067.00


12,975.76 m3 0.00 m3 32,133.00
- m3 0.00 m3 18,331.00
- m3 0.00 m3 23,398.00
12,661.14 m3 0.00 m3 34,203.00
- m3 0.00 m3 45,063.00
- m3 0.00 m3 27,957.00
7,740.15 m3 0.00 m3 16,599.00

195.47 m3 0.00 m3 874,044.14


6,103.44 m3 0.00 m3 827,500.00
7,751.69 kg 0.00 kg 10,500.00
3,553.72 m2 0.00 m2 126,963.00
0.07 Ls - Ls 740,000,000.00
0.07 Ls 0.07 Ls 1,251,945,000.00
5579.10 m2 - m2 3,060.00
0.07 Ls - Ls 1,632,120,634.00
0.07 Ls - Ls 1,755,956,854.00
0.00 Unit - Unit 61,489,410.00

13148.73 m3 - m3 16,067.00
5840.02 m3 - m3 32,133.00
0.00 m3 - m3 18,331.00
0.00 m3 - m3 23,398.00
0.00 m3 - m3 34,203.00
8250.42 m3 - m3 45,063.00
0.00 m3 - m3 27,957.00
10738.33 m3 - m3 16,599.00

254.51 m3 - m3 874,044.14
7167.39 m3 - m3 827,500.00
12689.36 kg - kg 10,500.00
4908.00 m2 - m2 126,963.00

0.07 Ls - Ls 740,000,000.00
0.07 Ls - Ls 1,251,945,000.00
6404.00 m2 - m2 3,060.00
0.07 Ls - Ls 1,632,120,634.00
0.07 Ls - Ls 1,755,956,854.00
0.00 Unit - Unit 61,489,410.00
-
17641.65 m3 - m3 16,067.00
33099.84 m3 - m3 32,133.00
0.00 m3 - m3 18,331.00
0.00 m3 - m3 23,398.00
0.00 m3 - m3 34,203.00
44092.20 m3 - m3 45,063.00
0.00 m3 - m3 27,957.00
6649.29 m3 - m3 16,599.00
-
263.16 m3 - m3 874,044.14
6395.54 m3 - m3 827,500.00
9974.68 kg - kg 10,500.00
5192.58 m2 - m2 126,963.00
0.07 Ls 0.00 Ls 740,000,000.00
0.07 Ls 0.07 Ls 1,251,945,000.00
2,319.98 m2 2319.98 m2 3,060.00
0.07 Ls 0.07 Ls 1,632,120,634.00
0.07 Ls 0.07 Ls 1,755,956,854.00
- Unit 0.00 Unit 61,489,410.00
-
19,716.44 m3 14688.14 m3 16,067.00
45,132.59 m3 33464.87 m3 32,133.00
- m3 0.00 m3 18,331.00
- m3 0.00 m3 23,398.00
- m3 0.00 m3 34,203.00
58,506.35 m3 0.00 m3 45,063.00
- m3 0.00 m3 27,957.00
6,342.68 m3 0.00 m3 16,599.00
-
210.05 m3 179.04 m3 874,044.14
5,795.48 m3 3628.75 m3 827,500.00
9,339.44 kg 5509.15 kg 10,500.00
4,117.24 m2 1678.25 m2 126,963.00

0.07 Ls - Ls 740,000,000.00
0.07 Ls 0.06 Ls 1,251,945,000.00
4,523.22 m2 4,523.22 m2 3,060.00
0.07 Ls - Ls 1,632,120,634.00
0.07 Ls - Ls 1,755,956,854.00
- Unit - Unit 61,489,410.00
-
13,701.52 m3 - m3 16,067.00
7,571.75 m3 - m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
10,685.58 m3 - m3 45,063.00
4,116.83 m3 - m3 27,957.00
6,470.85 m3 - m3 16,599.00
-
308.69 m3 - m3 874,044.14
11,849.58 m3 - m3 827,500.00
13,058.28 kg - kg 10,500.00
7,918.50 m2 - m2 126,963.00
0.07 Ls 0.01 Ls 740,000,000.00
0.07 Ls 0.01 Ls 1,251,945,000.00
4,102.00 m2 2,468.23 m2 3,060.00
0.07 Ls 0.04 Ls 1,632,120,634.00
0.07 Ls 0.04 Ls 1,755,956,854.00
1.00 Unit - Unit 61,489,410.00
-
8,413.54 m3 1,736.67 m3 16,067.00
6,439.59 m3 1,396.26 m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
10,391.49 m3 - m3 45,063.00
1,283.33 m3 - m3 27,957.00
3,178.31 m3 - m3 16,599.00
-
284.74 m3 - m3 874,044.14
9,511.90 m3 2,708.57 m3 827,500.00
10,160.41 kg - kg 10,500.00
4,002.96 m2 1,416.13 m2 126,963.00

0.07 Ls - Ls 740,000,000.00
0.07 Ls 0.06 Ls 1,251,945,000.00
3,210.00 m2 3,210.00 m2 3,060.00
0.07 Ls 0.07 Ls 1,632,120,634.00
0.07 Ls 0.07 Ls 1,755,956,854.00
- Unit - Unit 61,489,410.00
-
9,177.31 m3 1,070.92 m3 16,067.00
8,033.98 m3 770.04 m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
12,469.06 m3 - m3 45,063.00
- m3 - m3 27,957.00
4,742.24 m3 - m3 16,599.00
-
221.66 m3 - m3 874,044.14
7,049.62 m3 719.34 m3 827,500.00
10,031.80 kg - kg 10,500.00
4,302.14 m2 652.88 m2 126,963.00

0.07 Ls 0.00 Ls 740,000,000.00


0.07 Ls 0.00 Ls 1,251,945,000.00
10245.33 m2 0.00 m2 3,060.00
0.07 Ls 0.00 Ls 1,632,120,634.00
0.07 Ls 0.00 Ls 1,755,956,854.00
0.00 Unit 0.00 Unit 61,489,410.00
-
11241.93 m3 0.00 m3 16,067.00
6958.92 m3 0.00 m3 32,133.00
0.00 m3 0.00 m3 18,331.00
0.00 m3 0.00 m3 23,398.00
0.00 m3 0.00 m3 34,203.00
3476.52 m3 0.00 m3 45,063.00
8627.24 m3 0.00 m3 27,957.00
6097.09 m3 0.00 m3 16,599.00
-
192.72 m3 0.00 m3 874,044.14
6224.49 m3 0.00 m3 827,500.00
42084.99 kg 0.00 kg 10,500.00
3825.63 m2 0.00 m2 126,963.00

0.07 Ls 0.04 Ls 740,000,000.00


0.07 Ls 0.06 Ls 1,251,945,000.00
3,976.56 m2 1,442.95 m2 3,060.00
0.07 Ls 0.06 Ls 1,632,120,634.00
0.07 Ls 0.06 Ls 1,755,956,854.00
- Unit - Unit 61,489,410.00
-
11,947.47 m3 6,837.08 m3 16,067.00
2,550.04 m3 1,459.30 m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
5,122.05 m3 120.00 m3 45,063.00
3,359.01 m3 3,083.98 m3 27,957.00
6,016.46 m3 3,225.13 m3 16,599.00
-
- m3 - m3 874,044.14
4,301.20 m3 3,488.39 m3 827,500.00
149,968.14 kg 123,018.79 kg 10,500.00
6,668.63 m2 5,702.56 m2 126,963.00

- Ls - Ls 740,000,000.00
- Ls - Ls 1,251,945,000.00
3,068.39 m2 - m2 3,060.00
- Ls - Ls 1,632,120,634.00
- Ls - Ls 1,755,956,854.00
- Unit - Unit 61,489,410.00
-
9,011.41 m3 - m3 16,067.00
1,868.45 m3 - m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
3,952.27 m3 - m3 45,063.00
2,478.16 m3 - m3 27,957.00
4,444.30 m3 - m3 16,599.00
-
- m3 - m3 874,044.14
3,318.89 m3 - m3 827,500.00
115,718.27 kg - kg 10,500.00
5,145.65 m2 - m2 126,963.00

0.07 Ls 0.05 Ls 740,000,000.00


0.07 Ls 0.07 Ls 1,251,945,000.00
3,185.82 m2 3,185.82 m2 3,060.00
0.07 Ls 0.07 Ls 1,632,120,634.00
0.07 Ls 0.07 Ls 1,755,956,854.00
- Unit - Unit 61,489,410.00
-
4,094.13 m3 3,736.37 m3 16,067.00
2,685.52 m3 2,522.26 m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
1,343.06 m3 123.52 m3 45,063.00
1,160.64 m3 - m3 27,957.00
4,275.95 m3 - m3 16,599.00
-
83.86 m3 64.42 m3 874,044.14
2,727.93 m3 2,364.09 m3 827,500.00
4,000.92 kg 2,122.04 kg 10,500.00
2,919.81 m2 1,449.01 m2 126,963.00

0.07 Ls 0.05 Ls 740,000,000.00


0.07 Ls 0.06 Ls 1,251,945,000.00
1,630.46 m2 1,630.46 m2 3,060.00
0.07 Ls 0.07 Ls 1,632,120,634.00
0.07 Ls 0.07 Ls 1,755,956,854.00
- Unit - Unit 61,489,410.00
-
6,900.98 m3 6,315.23 m3 16,067.00
5,654.56 m3 5,227.11 m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
4,528.23 m3 - m3 45,063.00
1,850.48 m3 - m3 27,957.00
6,176.82 m3 300.00 m3 16,599.00
-
82.60 m3 74.14 m3 874,044.14
2,333.82 m3 2,137.66 m3 827,500.00
3,815.60 kg 2,982.82 kg 10,500.00
1,500.87 m2 1,722.53 m2 126,963.00

0.07 Ls 0.05 Ls 740,000,000.00


0.07 Ls 0.07 Ls 1,251,945,000.00
2,653.51 m2 2,653.51 m2 3,060.00
0.07 Ls 0.07 Ls 1,632,120,634.00
0.07 Ls 0.07 Ls 1,755,956,854.00
1.00 Unit 1.00 Unit 61,489,410.00
-
10,074.51 m3 9,328.98 m3 16,067.00
7,861.59 m3 2,522.26 m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
12,905.68 m3 44.30 m3 45,063.00
44.30 m3 - m3 27,957.00
4,986.12 m3 - m3 16,599.00
-
69.42 m3 46.63 m3 874,044.14
3,328.83 m3 1,978.54 m3 827,500.00
3,186.39 kg 1,593.20 kg 10,500.00
3,043.95 m2 846.78 m2 126,963.00

0.07 Ls 0.06 Ls 740,000,000.00


0.07 Ls 0.07 Ls 1,251,945,000.00
799.64 m2 799.64 m2 3,060.00
0.07 Ls 0.07 Ls 1,632,120,634.00
0.07 Ls 0.07 Ls 1,755,956,854.00
0.00 Unit 0.00 Unit 61,489,410.00
-
3245.09 m3 3245.09 m3 16,067.00
1154.53 m3 1154.53 m3 32,133.00
0.00 m3 0.00 m3 18,331.00
0.00 m3 0.00 m3 23,398.00
0.00 m3 0.00 m3 34,203.00
0.00 m3 0.00 m3 45,063.00
4474.51 m3 189.29 m3 27,957.00
2289.86 m3 2289.86 m3 16,599.00
-
75.45 m3 69.78 m3 874,044.14
1947.96 m3 2018.87 m3 827,500.00
4404.89 kg 4404.89 kg 10,500.00
1704.64 m2 1687.83 m2 126,963.00

0.07 Ls 0.07 Ls 740,000,000.00


0.07 Ls 0.07 Ls 1,251,945,000.00
686.33 m2 686.33 m2 3,060.00
0.07 Ls 0.07 Ls 1,632,120,634.00
0.07 Ls 0.07 Ls 1,755,956,854.00
0.00 Unit 0.00 Unit 61,489,410.00
-
5666.75 m3 4,820.26 m3 16,067.00
3598.96 m3 3,494.98 m3 32,133.00
387.76 m3 0.00 m3 18,331.00
2400.00 m3 0.00 m3 23,398.00
0.00 m3 0.00 m3 34,203.00
3019.74 m3 0.00 m3 45,063.00
47.63 m3 47.63 m3 27,957.00
3410.58 m3 1,639.03 m3 16,599.00
-
75.50 m3 75.50 m3 874,044.14
1580.56 m3 1,561.23 m3 827,500.00
4404.89 kg 4,206.81 kg 10,500.00
1551.52 m2 1,551.52 m2 126,963.00
al

MC0
1.00 1.00 - 740,000,000.00
1.00 1.00 - 1,251,945,000.00
55,783.34 55,783.34 - 3,060.00
1.00 1.00 - 1,632,120,634.00
1.00 1.00 - 1,755,956,854.00
2.00 2.00 - 61,489,410.00

151,406.99 151,406.99 - 16,067.00


151,426.10 151,426.10 - 32,133.00
387.76 387.76 - 18,331.00
2,400.00 2,400.00 - 23,398.00
12,661.14 12,661.14 - 34,203.00
178,742.65 178,742.65 - 45,063.00
27,442.13 27,442.13 - 27,957.00
83,559.03 83,559.03 - 16,599.00

2,317.80 2,317.80 - 874,044.14


79,636.63 79,636.63 - 827,500.00
400,589.75 400,589.75 - 10,500.00
60,355.84 60,355.84 - 126,963.00
1

28
Total MCO Progres Bobot %
25-May-2018

27-May-2018

52,857,142.86 -
89,424,642.86 71,539,714.29
10,400,940.00 7,552,794.40
116,580,045.29 58,290,022.64
125,425,489.57 62,712,744.79
- -
- -
119,305,990.51 -
416,950,096.08 -
- -
- -
433,048,971.42 -
- -
- -
128,478,749.85 -
- -
170,845,911.16 -
5,050,594,366.25 -
81,392,745.00 -
451,191,041.23 -
52,857,142.86
89,424,642.86
17,072,046.00
116,580,045.29
125,425,489.57
-

211,260,603.78
187,657,341.93
-
-
-
371,788,532.03
-
178,245,539.67

222,449,476.97
5,931,013,032.13
133,238,280.00
623,133,845.36

52,857,142.86
89,424,642.86
19,596,240.00
116,580,045.29
125,425,489.57
-
-
283,448,467.99
1,063,597,149.88
-
-
-
1,986,926,870.11
-
110,371,617.49
-
230,013,454.93
5,292,309,350.00
104,734,140.00
659,265,534.54
52,857,142.86 -
89,424,642.86 89,424,642.86
7,099,146.76 7,099,146.76
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
316,784,045.18 235,994,417.68
1,450,245,385.22 1,075,326,667.71
- -
- -
- -
2,636,471,477.80 -
- -
105,282,145.82 -
- -
183,594,718.93 156,493,006.84
4,795,761,495.68 3,002,794,692.78
98,064,120.00 57,846,075.00
522,736,710.45 213,075,634.44

52,857,142.86 -
89,424,642.86 71,539,714.29
13,841,056.26 13,841,056.26
116,580,045.29 -
125,425,489.57 -
- -
- -
220,142,346.86 -
243,303,041.30 -
- -
- -
- -
481,524,485.09 -
115,094,348.13 -
107,409,680.69 -
- -
269,805,625.30 -
9,805,531,173.75 -
137,111,940.00 -
1,005,357,004.31 -
52,857,142.86 7,077,523.72
89,424,642.86 17,884,928.57
12,552,120.00 7,552,794.40
116,580,045.29 58,290,022.64
125,425,489.57 62,712,744.79
61,489,410.00 -
- -
135,180,347.18 27,903,044.76
206,923,345.47 44,866,022.58
- -
- -
- -
468,271,713.87 -
35,878,056.81 -
52,756,767.69 -
- -
248,875,327.39 -
7,871,097,250.00 2,241,342,566.63
106,684,305.00 -
508,227,810.48 179,796,113.19

52,857,142.86 -
89,424,642.86 71,539,714.29
9,822,600.00 9,822,600.00
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
147,451,869.01 17,206,415.41
258,156,007.95 24,743,631.05
- -
- -
- -
561,893,236.81 -
- -
78,716,377.56 -
- -
193,739,749.22 -
5,833,561,530.24 595,255,337.43
105,333,900.00 -
546,212,892.83 82,892,111.29

52,857,142.86 -
89,424,642.86 -
31,350,720.36 -
116,580,045.29 -
125,425,489.57 -
- -
- -
180,624,071.72 -
223,611,035.48 -
- -
- -
- -
156,662,548.29 -
241,191,778.31 -
101,205,544.71 -
- -
168,443,513.45 -
5,150,768,722.94 -
441,892,395.00 -
485,713,925.10 -

52,857,142.86 31,820,000.00
89,424,642.86 69,197,640.31
12,168,284.82 4,415,418.04
116,580,045.29 91,831,767.10
125,425,489.57 98,799,449.93
- -
- -
191,960,044.31 109,851,420.59
81,940,465.66 46,891,526.24
- -
- -
- -
230,814,720.36 5,407,560.00
93,907,749.85 86,218,828.86
99,867,250.13 53,533,956.77
- -
- -
3,559,241,691.70 2,886,642,607.11
1,574,665,452.57 1,291,697,305.12
846,669,837.56 724,014,101.28

- -
- -
9,389,280.34 -
- -
- -
- -
- -
144,786,361.55 -
60,038,787.11 -
- -
- -
- -
178,101,034.70 -
69,281,790.18 -
73,771,015.67 -
- -
- -
2,746,378,684.40 -
1,215,041,856.83 -
653,306,573.70 -

52,857,142.86 37,000,000.00
89,424,642.86 89,424,642.86
9,748,601.55 9,748,601.55
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
65,780,418.84 60,032,240.72
86,293,814.16 81,047,925.18
- -
- -
- -
60,522,312.78 5,566,181.76
32,447,984.52 -
70,976,494.05 -
- -
73,292,971.05 56,304,175.18
2,257,365,848.40 1,956,285,137.00
42,009,660.00 22,281,420.00
370,707,430.75 183,970,656.63

52,857,142.86 37,000,000.00
89,424,642.86 71,539,714.29
4,989,201.48 4,989,198.42
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
110,877,981.39 101,466,776.31
181,697,896.95 167,962,741.70
- -
- -
- -
204,055,751.29 -
51,733,869.36 -
102,529,048.46 4,979,700.00
- -
72,196,045.66 64,803,642.57
1,931,236,950.95 1,768,914,862.29
40,063,800.00 31,319,610.00
190,554,551.53 218,697,760.49

52,857,142.86 37,000,000.00
89,424,642.86 89,424,642.86
8,119,732.95 8,119,732.95
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
61,489,410.00 61,489,410.00
- -
161,867,097.74 149,888,681.49
252,616,524.57 81,047,925.18
- -
- -
- -
581,568,578.03 1,996,290.90
1,238,616.43 -
82,764,534.44 -
- -
60,672,647.77 40,760,786.09
2,754,603,042.65 1,637,238,035.23
33,457,095.00 16,728,547.50
386,469,220.64 107,509,576.78

52,857,142.86 44,400,000.00
89,424,642.86 89,424,642.86
2,446,895.16 2,446,895.16
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
52,138,861.03 52,138,861.03
37,098,512.49 37,098,512.49
- -
- -
- -
- -
125,093,876.07 5,291,980.53
38,009,316.42 38,009,386.14
- -
65,943,133.91 60,994,296.01
1,611,936,482.11 1,670,614,799.22
46,251,345.00 46,251,345.00
216,426,208.32 214,291,500.68

52,857,142.86 52,857,142.86
89,424,642.86 89,424,642.86
2,100,162.15 2,100,162.15
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
91,047,672.25 77,447,117.42
115,645,381.68 112,304,192.34
7,107,978.55 -
56,155,200.00 -
- -
136,078,689.54 -
1,331,577.65 1,331,591.91
56,612,217.42 27,206,258.97
- -
65,986,836.12 65,986,836.12
1,307,912,098.07 1,291,921,552.47
46,251,345.00 44,171,469.77
196,986,131.03 196,986,131.03
103,471,639,577.53 27,194,014,159.76

740,000,000.00
1,251,945,000.00
170,697,027.82
1,632,120,634.00
1,755,956,854.00
122,978,820.00

2,432,656,179.35
4,865,774,785.94
7,107,978.55
56,155,200.00
433,048,971.42
8,054,679,950.70
767,199,647.32
1,386,996,300.07

2,025,859,411.87
65,899,311,719.26
4,206,192,379.40
7,662,958,717.84
103,471,639,577.53
2 3 4 5 6

29 30 31 32 33
28-May-2018 4-Jun-2018 11-Jun-2018 18-Jun-2018 25-Jun-2018

3-Jun-2018 10-Jun-2018 17-Jun-2018 24-Jun-2018 1-Jul-2018

LIBUR LEBARAN
N
N LIBUR LEBARAN LIBUR LEBARAN
LIBUR LEBARAN
7 8 9 10 11

34 35 36 37 38
2-Jul-2018 9-Jul-2018 16-Jul-2018 23-Jul-2018 30-Jul-2018

8-Jul-2018 15-Jul-2018 22-Jul-2018 29-Jul-2018 5-Aug-2018


12 13 14 15 16

39 40 41 42 43
6-Aug-2018 13-Aug-2018 20-Aug-2018 27-Aug-2018 3-Sep-2018

12-Aug-2018 19-Aug-2018 26-Aug-2018 2-Sep-2018 9-Sep-2018


74
17 18 19 20 21

44 45 46 47 48
10-Sep-2018 17-Sep-2018 24-Sep-2018 1-Oct-2018 8-Oct-2018

16-Sep-2018 23-Sep-2018 30-Sep-2018 7-Oct-2018 14-Oct-2018


22 23 24 25 26

49 50 51 52 53
15-Oct-2018 22-Oct-2018 29-Oct-2018 5-Nov-2018 12-Nov-2018

21-Oct-2018 28-Oct-2018 4-Nov-2018 11-Nov-2018 18-Nov-2018


27 28 29 30

54 55 56 57 58
19-Nov-2018 26-Nov-2018 3-Dec-2018 10-Dec-2018 17-Dec-2018

25-Nov-2018 2-Dec-2018 9-Dec-2018 16-Dec-2018 23-Dec-2018


59 60 61 62 63
24-Dec-2018 31-Dec-2018 7-Jan-2019 14-Jan-2019 21-Jan-2019

30-Dec-2018 6-Jan-2019 13-Jan-2019 20-Jan-2019 27-Jan-2019


JADWAL PELAKSANAAN
64 65 66 67 68
28-Jan-2019 4-Feb-2019 11-Feb-2019 18-Feb-2019 25-Feb-2019

3-Feb-2019 10-Feb-2019 17-Feb-2019 24-Feb-2019 3-Mar-2019


AAN
69 70 71 72 73
4-Mar-2019 11-Mar-2019 18-Mar-2019 25-Mar-2019 1-Apr-2019

10-Mar-2019 17-Mar-2019 24-Mar-2019 31-Mar-2019 7-Apr-2019


74 75 76 77 78
8-Apr-2019 15-Apr-2019 22-Apr-2019 29-Apr-2019 6-May-2019

14-Apr-2019 21-Apr-2019 28-Apr-2019 5-May-2019 12-May-2019


79 80 81 82 83
13-May-2019 20-May-2019 27-May-2019 3-Jun-2019 10-Jun-2019

19-May-2019 26-May-2019 2-Jun-2019 9-Jun-2019 16-Jun-2019


84 85 86 87 88
17-Jun-2019 24-Jun-2019 1-Jul-2019 8-Jul-2019 15-Jul-2019

23-Jun-2019 30-Jun-2019 7-Jul-2019 14-Jul-2019 21-Jul-2019


89 90 91 92 93
22-Jul-2019 29-Jul-2019 5-Aug-2019 12-Aug-2019 19-Aug-2019

28-Jul-2019 4-Aug-2019 11-Aug-2019 18-Aug-2019 25-Aug-2019


94 95 96 97 98
26-Aug-2019 2-Sep-2019 9-Sep-2019 16-Sep-2019 23-Sep-2019

1-Sep-2019 8-Sep-2019 15-Sep-2019 22-Sep-2019 29-Sep-2019


99 100 101 102 103
30-Sep-2019 7-Oct-2019 14-Oct-2019 21-Oct-2019 28-Oct-2019

6-Oct-2019 13-Oct-2019 20-Oct-2019 27-Oct-2019 3-Nov-2019


104 105 106
4-Nov-2019 11-Nov-2019 18-Nov-2019

10-Nov-2019 17-Nov-2019 24-Nov-2019


1 Maindam

KIRI

22.5
1.1
1.1
1.0
2.2 2.2 26.1
2.0

2.2
2.1
2.0 27.6

1.0
1.0
1.0
1.0
1.0
1.0
1.0

26.1 28.3
5.0

54.4

Apron
RETAINING WALL HILIR

1
1.1
1.1
+790,090
TAHAPAN RENCANA PENGECORAN MAINDAM BO DKI 5
Subdam

KANAN
27.5

1
1.0 Stage 10 A = 3 m2

26.1
2.0 Sta ge 9 A = 3 m2

27.6
2.0 Stage 8 A = 3 m2

1.2
1.0
1.2 Sta ge 7 A = 3.5 m2

1.0
1.2 Stage 6 A = 4.2 m2

1.0
1.2 Stage 5 A =5 m2

7.0 Sta ge 4 A = 5.7 m2 1.0


1.2
Stage 3 A = 6.6 m2
1.2
Stage 2 A = 7.4 m2 1.0
1.2
Stage 1 A = 8.2 m2 1.0

5.0 5.0 5.0

21.0
A

RETAINING WALL HULU

18,50 3,42

2,84
RETAINING WALL HULU
A

RETAINING WALL HILIR

1.1
1.0
1.0 1.1 0.6
.6 1.0
.0 1.1 1.2
1.0
0 1.1
0.6 1.4 1.0
0 1.1
0.9
1.1
1.2
1.1
1.1 0.7 1.4

1.1 1.0

1.1 1.3
1.6
1.8
35.5

1.1
Stage 9 A = 3 m2 1.0
2.2 1.0
Stage 8 A = 3 m2
2.0
2.0
2.2 5.0
Stage 7 A = 3 m2
2.0
2.0 1.2
1.0
1.2 Stage 6 A = 3.0 m2
1.0 1.0
2.0 1.2 Stage 5 A = 3.7 m2

1.0 1.0
1.2 Stage 4 A = 4.5 m2

1.0 1.0
2.0 1.2 Stage 3 A = 5.3 m2

1.0 1.0
1.2 Sta ge 2 A = 6.1 m2

1.0 1.0
2.0 Stage 1 A = 6.8 m2

1.0

3.0 3.0 4.5

21.0 25.0
A

11,34 1.1
1.0
1.1
1.0
1.1
1.0
1.1
1.0 0.6
1.1
1.0 1.0
1.2 1.1
1.0
1.0 1.4 1.0
3,42

8,50
2,84

1.1 0.6
1.0
1.1
0.9 1.0
1.1
1.2 1.0
3.4 1.4 1.0
2.4

1.4
1.1 0.6
1.0
1.1
0.9 1.0
1.1
1.2 1.0
3.4 1.4 1.0
2.4

1.4
1.4

1.1
1.0
1.1 0.6
1.0
1.1 1.2
1.0
1.1
0.6 1.0
1.1
0.9
1.1
1.2
1.1
1.1 0.7 1.4

1.1 1.0

1.1 1.3
1.6
Stage 9 A = 3 m2 1.0

Stage 8 A = 3 m2
2.0

Stage 7 A = 3 m2
2.0
1.0
Stage 6 A = 3.0 m2
1.0
Stage 5 A = 3.7 m2

1.0
Stage 4 A = 4.5 m2
1.0
Stage 3 A = 5.3 m2

1.0
Stage 2 A = 6.1 m2

1.0
Stage 1 A = 6.8 m2

1.1
1.0 0.6
1.1
1.0 1.0
1.2 1.1
1.0
1.0 1.4 1.0
1.1
1.0
1.1 0.6
1.0
1.1 1.2
1.0
.6 1.0
Sisa Pekerjaan

No Uraian Pekerjaan
Volume

A PERSIAPAN

B MOBILISASI ALAT

C GALIAN

D DEWATERING

E PEKERJAAN MAINDAM 1,955.11


Tahapan Pengecoran K175
Stage 1 A
Stage 1 B
Stage 2A
Stage 2B
Stage 3A
Stage 3B
Stage 4A
Stage 4B
Stage 5A
Stage 5B
Stage 6A
Stage 6B
Stage 7A
Stage 7B
Tahapan Pengecoran K225 Sisi Kanan
Stage 8
Stage 9
Stage 10

Tahapan Pengecoran Sisi Kiri K225


Stage 8
Stage 9
Stage 10
PEKERJAAN SUBDAM
Tahapan Pengecoran Sisi Kanan K175
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6

Tahapan Pengecoran Sisi Kanan K225


Stage 7
Stage 8
Stage 9

Tahapan Pengecoran Sisi Kiri K175


Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Tahapan Pengecoran Sisi Kiri K225
Stage 7
Stage 8
Stage 9

Sisi Hulu Kiri, Trap 1)


Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hulu Kiri, Trap 2)
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kanan, Trap 1)
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kanan, Trap 2)
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kanan, Trap 3)
Stage 1 Pondasi
Stage 2
Stage 3

Sisi Hilir (Kiri, Trap 1)


Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kiri, Trap 2)
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kiri, Trap 3)
Stage 1 Pondasi
Stage 2
Stage 3

Pekerjaan Retaining Wall


Sisa Pekerjaan Lebar Bangunan Stage Pekerjaan Beton Stage Pekerjaan B

Volume Vol. Beton


Panjang Lebar Tinggi Luas Panjang Tinggi
Beton ACC
Satuan
(m) (m) (m) (m2) (m) (m3) (m3) (m)
1 2 3 4

8.20 27.20 223.04 223.04 1.20


8.20 27.20 223.04 223.04 1.20
7.40 27.20 201.28 424.32 1.20
7.40 27.20 201.28 424.32 1.20
6.60 25.95 171.27 595.59 1.98
6.60 25.95 171.27 595.59 1.98
5.70 31.70 180.69 776.28 1.20
5.70 31.70 180.69 776.28 1.20
5.00 31.70 158.50 934.78 1.20
5.00 31.70 158.50 934.78 1.20
4.20 36.20 152.04 1,086.82 1.20
4.20 36.20 152.04 1,086.82 1.20
3.50 36.20 126.70 1,213.52 1.20
3.50 36.20 126.70 1,213.52 1.20

3.00 27.60 82.80 1,296.32 2.20


3.00 26.70 80.10 1,376.42 2.20
3.00 26.10 78.30 1,454.72 1.20
3.00 23.50 70.50 70.50 1.20
3.00 22.50 67.50 138.00 2.40
3.00 21.90 65.70 203.70 2.40

6.48 25.00 162.00 300.00 1.20


6.10 25.00 152.50 452.50 1.20
5.10 28.00 142.80 595.30 1.20
2.50 28.00 70.00 665.30 1.20
3.60 31.00 111.60 776.90 1.50
2.45 31.00 75.95 852.85 1.20

3.00 20.50 61.50 61.50 2.40


3.00 19.50 58.50 120.00 2.40
3.00 18.50 55.50 175.50 1.20

6.48 21.00 136.08 311.58 1.20


6.10 21.00 128.10 439.68 1.20
5.10 23.00 117.30 556.98 1.20
2.50 23.00 57.50 614.48 1.20
3.60 25.00 90.00 704.48 1.50
2.45 25.00 61.25 765.73 1.20

3.00 12.50 37.50 37.50 2.40


3.00 11.30 33.90 71.40 2.40
3.00 10.50 31.50 102.90 1.20

1.40 12.13 16.98 16.98 1.40


0.90 12.13 10.92 10.92 2.40
0.70 12.13 8.49 25.47 1.00
1.40 13.67 19.14 44.61 1.40
0.90 13.67 12.30 12.30 2.40
0.70 13.67 9.57 54.18 1.00

1.80 6.83 12.29 66.47 1.00


1.40 6.83 9.56 9.56 2.40
0.80 6.83 5.46 71.94 2.00

1.80 9.45 17.01 88.95 1.00


1.40 9.45 13.23 13.23 2.40
0.80 9.45 7.56 96.51 2.00

1.80 12.24 22.03 118.54 1.00


1.40 12.24 17.14 17.14 2.40
0.80 12.24 9.79 128.33 2.00

1.80 7.07 12.73 12.73 1.00


1.40 7.07 9.90 9.90 2.40
0.80 7.07 5.66 18.38 2.00

1.80 9.45 17.01 35.39 1.00


1.40 9.45 13.23 13.23 2.40
0.80 9.45 7.56 42.95 2.00

1.80 12.24 22.03 64.98 1.00


1.40 12.24 17.14 17.14 2.40
0.80 12.24 9.79 74.78 2.00
Stage Pekerjaan Bekisting Kebutuhan Material

Volume Vol. Bek. Jumlah


BeKisting ACC Panel Split Pasir Batu Kali Semen K 225 Semen K 175 1
(m2) (m2) 2.88 0.79 0.47 1.60 350.00 280.00

32.64 32.64 25.00 25.79 15.34 52.22 9,139.20


32.64 32.64 25.00 25.79 15.34 52.22 9,139.20
32.64 65.28 25.00 25.79 15.34 52.22 9,139.20
32.64 65.28 25.00 25.79 15.34 52.22 9,139.20
51.381 116.661 38.00 40.59 24.15 82.21 14,386.68
51.381 116.661 38.00 40.59 24.15 82.21 14,386.68
38.04 154.701 28.00 30.05 17.88 60.86 10,651.20
38.04 154.701 28.00 30.05 17.88 60.86 10,651.20
38.04 192.741 28.00 30.05 17.88 60.86 10,651.20
38.04 192.741 28.00 30.05 17.88 60.86 10,651.20
43.44 236.181 31.00 34.32 20.42 69.50 12,163.20
43.44 236.181 31.00 34.32 20.42 69.50 12,163.20
43.44 279.621 31.00 34.32 20.42 69.50 12,163.20
43.44 279.621 31.00 34.32 20.42 69.50 12,163.20

60.72 340.341 43.00 47.97 28.54 97.15 21,252.00


58.74 399.081 41.00 46.40 27.61 93.98 20,559.00
31.32 430.401 23.00 24.74 14.72 50.11 10,962.00
28.2 28.2 21.00 22.28 13.25 45.12 9,870.00
54 82.2 39.00 42.66 25.38 86.40 18,900.00
52.56 134.76 37.00 41.52 24.70 84.10 18,396.00

30.00 30 22.00 23.70 14.10 48.00 8,400.00


30.00 60 22.00 23.70 14.10 48.00 8,400.00
33.60 93.6 26.00 26.54 15.79 53.76 9,408.00
33.60 127.2 25.00 26.54 15.79 53.76 9,408.00
46.50 173.7 33.00 36.74 21.86 74.40 13,020.00
37.20 210.9 27.00 29.39 17.48 59.52 10,416.00

49.20 49.2 35.00 38.87 23.12 78.72 17,220.00


46.80 96 33.00 36.97 22.00 74.88 16,380.00
22.20 118.2 17.00 17.54 10.43 35.52 7,770.00

25.20 25.2 20.00 19.91 11.84 40.32 7,056.00


25.20 50.4 20.00 19.91 11.84 40.32 7,056.00
27.60 78 22.00 21.80 12.97 44.16 7,728.00
27.60 105.6 21.00 21.80 12.97 44.16 7,728.00
37.50 143.1 27.00 29.63 17.63 60.00 10,500.00
30.00 173.1 21.00 23.70 14.10 48.00 8,400.00

30.00 30 21.00 23.70 14.10 48.00 10,500.00


27.12 57.12 19.00 21.42 12.75 43.39 9,492.00
12.60 69.72 9.00 9.95 5.92 20.16 4,410.00

16.98 16.982 12.00 13.42 7.98 27.17 4,754.96


29.11 29.112 20.00 23.00 13.68 46.58 8,151.36
12.13 12.13 8.00 9.58 5.70 19.41 3,396.40
19.14 19.138 14.00 15.12 8.99 30.62 5,358.64
32.81 32.808 22.00 25.92 15.42 52.49 9,186.24
13.67 13.67 10.00 10.80 6.42 21.87 3,827.60

6.83 6.83 5.00 5.40 3.21 10.93 1,912.40


16.39 16.392 12.00 12.95 7.70 26.23 4,589.76
13.66 13.66 10.00 10.79 6.42 21.86 3,824.80

9.45 9.45 7.00 7.47 4.44 15.12 2,646.00


22.68 22.68 16.00 17.92 10.66 36.29 6,350.40
18.90 18.9 14.00 14.93 8.88 30.24 5,292.00

12.24 12.24 9.00 9.67 5.75 19.58 3,427.20


29.38 29.376 20.00 23.21 13.81 47.00 8,225.28
24.48 24.48 18.00 19.34 11.51 39.17 6,854.40

7.07 7.07 5.00 5.59 3.32 11.31 1,979.60


16.97 16.968 12.00 13.40 7.97 27.15 4,751.04
14.14 14.14 10.00 11.17 6.65 22.62 3,959.20

9.45 9.45 7.00 7.47 4.44 15.12 2,646.00


22.68 22.68 16.00 17.92 10.66 36.29 6,350.40
18.90 18.9 14.00 14.93 8.88 30.24 5,292.00

12.24 12.24 9.00 9.67 5.75 19.58 3,427.20


29.38 29.376 20.00 23.21 13.81 47.00 8,225.28
24.48 24.48 18.00 19.34 11.51 39.17 6,854.40
1 2 3 4 5 6 7 8 9
9 10 11 12 13 14 15 16 17
17 18 19 20 21 22 23 24 25
JADWAL

25 26 27 28 29 30 31 32 33
JADWAL PELAKSANAAN

33 34 35 36 37 38 39 40 41
41 42 43 44 45 46 47 48 49
49 50 51 52 53 54 55 56 57
57 58 59 60 61 62 63 64 65
65 66 67 68
MAINDAM

57.6

1.1
11.8

11.8 2.2

12.8
12.8 2.2

13.8
13.8

45.5 2.5 3.3

Apron (Dinding & Plat Apron


1,20
2,50
METODE DKI 6
SUBDAM

10.0

11.8 1.1
1.0
1.0 Satege 103.0 2.2
2.0 Stage 9 5.0
12.8 2.0 3.0 2.2

2.0 Sateg 8
13.8 11.0
2.0 3.0
1.0 1.2
1.0
Sateg 7 3.3
1.0 1.2
1.0 Stage 6 4.3
1.0 1.2
1.0 Stage 5 4.9
1.0 1.2
1.0 Stage 4 5.6
1.0 1.2
1.0 Stage 3 6.6
1.0 1.2
1.0 Stage 2 7.3
1.0 1.2
1.0 Stage 18.2

2.5 3.3

RETAINING WALL HULU

RETAINING WALL HILIR


18.0
1.1

2.2
2.5

1.0
2.2
5.0
2 2.0

2.0
2.0
1.0 2.9 1.2
1.0 1.2
2.0 3.7
1.0 1.2
4.5
1.0 1.2
2.0 5.4
1.0 1.2
6.0
1.0 6.8 1.2

46.0 3.0 3.0 4.5

1.1
0.7 0.7 1.1
1.9 1.0
0.9 1.0 1.1
1.0
2.4 1.3
1.0 1.1
1.7 1.4 1.0
1.10.7
1.0 1.1
1.0 2.4 1.1
2.4 1.0
2.4 1.3
1.0
1.4 1.0
1.0 2.8 1.0
13,62
12,83
1,80
1,80

1.1
1.0
1.1 0.6
1.0
1.1 1.2
1.0
0.6 1.0
1.1
1.0
1.1 0.6
1.0
1.1 1.2
1.0
0.6 1.0

2.1 1.0
0.7 1.4
1.0
2.4 1.3
1.6
1.0 1.8
2.5

1.0

2.0

2.0

1.0 2.9 1.2


1.0 1.2
3.7
1.0 1.2
4.5
1.0 1.2
5.4
1.0 1.2
6.0
1.0 6.8 1.2

1.1
1.0
1 0.6
1.0
1.2 1.0
1.0
1.1
1.0
1 0.6
1.0
1.2 1.0
1.0
Sisa Pekerjaan

No Uraian Pekerjaan
Volume

A PERSIAPAN

B MOBILISASI ALAT

C GALIAN

D DEWATERING

E PEKERJAAN MAINDAM
Tahapan Pengecoran K175
Stage 1 A
Stage 1 B
Stage 2A
Stage 2B
Stage 3A
Stage 3B
Stage 4A
Stage 4B
Stage 5A
Stage 5B
Stage 6A
Stage 6B
Stage 7A
Stage 7B
Tahapan Pengecoran K225 Sisi Kanan
Stage 8
Stage 9
Stage 10

Tahapan Pengecoran Sisi Kiri K225


Stage 9
Stage 10
Stage 11

PEKERJAAN SUBDAM
F Tahapan Pengecoran Sisi Kanan K175
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Tahapan Pengecoran Sisi Kanan K225
Stage 7
Stage 8
Stage 9

Tahapan Pengecoran Sisi Kiri K175


Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
G Stage 9
Tahapan Pengecoran Sisi Kiri K225
Stage 6
Stage 7
Stage 8
Stage 9
Stage 1 Pondasi
Stage 2
Stage 3
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hulu(Kanan, Trap 2)
Stage 1 Pondasi
Stage 2
Stage 3

Sisi Hilir (Kanan, Trap 1)


Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kanan, Trap 2)
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kanan, Trap 3)
Stage 1 Pondasi
Stage 2
Stage 3

Sisi Hilir (Kiri, Trap 1)


Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kiri, Trap 2)
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kiri, Trap 3)
Stage 1 Pondasi
Stage 2
Stage 3
Stage 3
Sisa Pekerjaan Lebar Bangunan Stage Pekerjaan Beton Stage Pekerjaan B

Volume Vol. Beton


Panjang Lebar Tinggi Luas Panjang Tinggi
Beton ACC
Satuan
(m) (m) (m) (m2) (m) (m3) (m3) (m)
1 2 3 4

8.20 23.50 192.70 192.70 1.20


8.20 23.50 192.70 192.70 1.20
7.40 23.50 173.90 366.60 1.20
7.40 23.50 173.90 366.60 1.20
6.60 25.53 168.50 535.10 1.98
6.60 25.53 168.50 535.10 1.98
5.70 25.53 145.52 680.62 1.20
5.70 25.53 145.52 680.62 1.20
5.00 25.53 127.65 808.27 1.20
5.00 25.53 127.65 808.27 1.20
4.20 25.53 107.23 915.50 1.20
4.20 25.53 107.23 915.50 1.20
3.50 28.86 101.01 1,016.51 1.20
3.50 28.86 101.01 1,016.51 1.20

3.00 13.80 41.40 1,057.91 2.20


3.00 12.80 38.40 1,096.31 2.20
3.00 11.80 35.40 1,131.71 1.20
3.00 13.80 41.40 41.40 1.20
3.00 12.80 38.40 79.80 2.40
3.00 11.80 35.40 115.20 2.40

6.80 16.00 108.80 188.60 1.20


6.00 16.00 96.00 284.60 1.20
5.40 16.00 86.40 371.00 1.20
4.50 16.00 72.00 443.00 1.20
3.70 17.50 64.75 507.75 1.50
2.90 6.63 19.23 526.98 1.20

3.00 20.50 61.50 588.48 2.20


3.00 19.20 19.20 607.68 2.20
3.00 18.00 54.00 661.68 1.20

6.48 16.00 103.68 765.36 1.20


5.97 16.00 95.52 860.88 1.20
5.10 16.00 81.60 942.48 1.20
4.23 16.00 67.68 1,010.16 1.20
3.60 17.50 63.00 1,073.16 1.50
2.45 6.63 16.24 1,089.40 1.20
4.80 6.53 31.34 1,120.74 2.40
4.80 6.08 29.18 1,149.93 2.40
2.40 5.18 12.43 1,162.36 1.20

2.45 10.62 26.02 1,188.38 1.20


2.40 3.00 7.20 1,195.58 2.40
2.40 3.00 7.20 1,202.78 2.40
1.90 3.00 5.70 1,208.48 1.20
1.40 13.6 19.04 1,221.82 1.40
0.90 13.6 12.24 1,220.72 2.40
0.70 13.6 9.52 1,231.34 1.00
1.40 20.55 28.77 1,260.11 1
1.30 20.55 26.72 1,286.82 2.4
1.00 20.55 20.55 1,307.37 1

1.40 24.61 34.45 34.45 1


1.30 24.61 31.99 66.45 2.4
1.00 24.61 24.61 91.06 1

1.80 24.56 44.21 1,194.14 1.00


1.40 24.56 34.38 34.38 2.40
1.00 24.56 24.56 1,218.70 2.10

1.40 20.55 28.77 1,247.47 1.00


1.20 20.55 24.66 24.66 2.40
1.00 20.55 20.55 1,268.02 1.00

1.40 14.77 20.68 1,288.69 1.20


2.40 14.77 35.45 35.45 2.40
1.00 14.77 14.77 1,303.46 2.40

1.80 24.56 44.21 1,347.67 1.00


1.40 24.56 34.38 34.38 2.40
1.00 24.56 24.56 1,372.23 2.10

1.40 20.55 28.77 1,401.00 1.00


1.20 20.55 24.66 24.66 2.40
1.00 20.55 20.55 1,421.55 1.00

1.40 14.77 20.68 1,442.23 1.20


2.40 14.77 35.45 35.45 2.40
1.00 14.77 14.77 1,457.00 2.40
1.00 14.77 14.77 50.22 2.40
Stage Pekerjaan Bekisting Kebutuhan Material

Volume Vol. Bek. Jumlah Split Pasir Batu Kali Semen K 225 Semen K 175
BeKisting ACC Panel

(m2) (m2) 2.88 0.79 0.47 1.60 350.00 280.00

28.2 28.2 23.00 22.28 13.25 45.12 7,896.00


28.2 28.2 23.00 22.28 13.25 45.12 7,896.00
28.2 56.4 23.00 22.28 13.25 45.12 7,896.00
28.2 56.4 23.00 22.28 13.25 45.12 7,896.00
50.5494 106.9494 38.00 39.93 23.76 80.88 14,153.83
50.5494 106.9494 38.00 39.93 23.76 80.88 14,153.83
30.636 137.5854 24.00 24.20 14.40 49.02 8,578.08
30.636 137.5854 24.00 24.20 14.40 49.02 8,578.08
30.636 168.2214 24.00 24.20 14.40 49.02 8,578.08
30.636 168.2214 24.00 24.20 14.40 49.02 8,578.08
30.636 198.8574 23.00 24.20 14.40 49.02 8,578.08
30.636 198.8574 23.00 24.20 14.40 49.02 8,578.08
34.632 233.4894 25.00 27.36 16.28 55.41 9,696.96
34.632 233.4894 25.00 27.36 16.28 55.41 9,696.96

30.36 263.8494 23.00 23.98 14.27 48.58 10,626.00


28.16 292.0094 21.00 22.25 13.24 45.06 9,856.00
14.16 306.1694 11.00 11.19 6.66 22.66 4,956.00
16.56 16.56 13.00 13.08 7.78 26.50 5,796.00
30.72 47.28 23.00 24.27 14.44 49.15 10,752.00
28.32 75.6 21.00 22.37 13.31 45.31 9,912.00

19.20 19.2 16.00 15.17 9.02 30.72 5,376.00


19.20 38.4 16.00 15.17 9.02 30.72 5,376.00
19.20 57.6 16.00 15.17 9.02 30.72 5,376.00
19.20 76.8 16.00 15.17 9.02 30.72 5,376.00
26.25 103.05 19.00 20.74 12.34 42.00 7,350.00
7.96 111.006 7.00 6.29 3.74 12.73 2,227.68

45.10 156.11 33.00 35.63 21.20 72.16 15,785.00


42.24 198.346 31.00 33.37 19.85 67.58 14,784.00
21.60 219.946 17.00 17.06 10.15 34.56 7,560.00

19.20 19.2 16.00 15.17 9.02 30.72 5,376.00


19.20 38.4 16.00 15.17 9.02 30.72 5,376.00
19.20 57.6 16.00 15.17 9.02 30.72 5,376.00
19.20 76.8 15.00 15.17 9.02 30.72 5,376.00
26.25 103.05 19.00 20.74 12.34 42.00 7,350.00
7.96 111.006 7.00 6.29 3.74 12.73 2,227.68
15.67 126.678 12.00 12.38 7.37 25.08 4,388.16
14.59 141.27 12.00 11.53 6.86 23.35 4,085.76
6.22 147.486 5.00 4.91 2.92 9.95 1,740.48

12.74 12.744 9.00 10.07 5.99 20.39 4,460.40


7.20 19.944 7.00 5.69 3.38 11.52 2,520.00
7.20 27.144 7.00 5.69 3.38 11.52 2,520.00
3.60 30.744 3.00 2.84 1.69 5.76 1,260.00
19.04 19.04 14.00 15.04 8.95 30.46 6,664.00
32.64 32.64 22.00 25.79 15.34 52.22 11,424.00
13.60 13.6 10.00 10.74 6.39 21.76 4,760.00
20.55 20.55 14.00 16.23 9.66 32.88 7,192.50
49.32 49.32 34.00 38.96 23.18 78.91 17,262.00
20.55 20.55 14.00 16.23 9.66 32.88 7,192.50

24.61 24.61 18.00 19.44 11.57 39.38 6,890.80


59.064 59.064 42.00 46.66 27.76 94.50 16,537.92
24.61 24.61 18.00 19.44 11.57 39.38 6,890.80

24.56 24.56 19.00 19.40 11.54 39.30 6,876.80


58.94 58.944 40.00 46.57 27.70 94.31 16,504.32
51.58 51.576 36.00 40.75 24.24 82.52 14,441.28

20.55 20.55 14.00 16.23 9.66 32.88 5,754.00


49.32 49.32 34.00 38.96 23.18 78.91 13,809.60
20.55 20.55 14.00 16.23 9.66 32.88 5,754.00

17.72 17.724 12.00 14.00 8.33 28.36 4,962.72


35.45 35.448 25.00 28.00 16.66 56.72 9,925.44
35.45 35.448 24.00 28.00 16.66 56.72 9,925.44

24.56 24.56 19.00 19.40 11.54 39.30 6,876.80


58.94 58.944 40.00 46.57 27.70 94.31 16,504.32
51.58 51.576 36.00 40.75 24.24 82.52 14,441.28

20.55 20.55 14.00 16.23 9.66 32.88 5,754.00


49.32 49.32 34.00 38.96 23.18 78.91 13,809.60
20.55 20.55 14.00 16.23 9.66 32.88 5,754.00

17.72 17.724 12.00 14.00 8.33 28.36 4,962.72


35.45 35.448 25.00 28.00 16.66 56.72 9,925.44
35.45 35.448 24.00 28.00 16.66 56.72 9,925.44
35.45 35.448 24.00 28.00 16.66 56.72 9,925.44
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24
JA

25 26 27 28 29 30 31 32
JADWAL PELAKSANAAN

33 34 35 36 37 38 39 40
41 42 43 44 45 46 47 48
49 50 51 52 53 54 55 56
57 58 59 60 61 62 63 64
65 66 67 68
MAINDAM

32,50

0,39
1,20
1,20
1,00
1,20
1,50 1,20
11,19 2,05 1,20
1,20
1,20
1,20
1,20

2,50 2,50 95,50 2,50 2,50

DINDING APRON
0,79

2,40

2,40

1,50
2,30

SUBDAM

7,65 24,00 7,65

35,00
0,39
1,20 Stage 10 - 5,95 1,20
1,20
1,20 Stage 9 - 5,98 1,20
1,20
1,20
Stage 8 - 6,03 1,20
1,20
1,20
1,20
1,20 Stage 7 - 6,39 1,20
1,20

Stage 6 - 7,10 1,20


2,50 2,50

Stage 5 - 7,87 1,20


Stage 4 - 8,61 1,20
Stage 3 - 9,40
1,20
Stage 2 - 10,09 1,20
Stage 1 -10,83

7,65

2,00
1,60
1,60
2,40 2,00
2,40
1,90
1,91
2,60
1,20
3,55 1,20
4,25 1,20
5,03 1,20
5,80
Sisa Pekerjaan

No Uraian Pekerjaan
Volume

A PERSIAPAN

B MOBILISASI ALAT

C GALIAN

D DEWATERING

E PEKERJAAN MAINDAM
Tahapan Pengecoran K175
Stage 1 A
Stage 1 B
Stage 2A
Stage 2B
Stage 3A
Stage 3B
Stage 4A
Stage 4B
Stage 5A
Stage 5B
Stage 6A
Stage 6B
Stage 7A
Stage 7B
Stage 8A
Stage 8B
Stage 9A
Stage 9B
Stage 10A
Stage 10B
Tahapan Pengecoran Sisi Kiri K225
Stage 9
Stage 10
Stage 11

PEKERJAAN SUBDAM
F Tahapan Pengecoran Sisi Kanan K175
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Tahapan Pengecoran Sisi Kanan K225
Stage 7
Stage 8
Stage 9

Tahapan Pengecoran Sisi Kiri K175


Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Stage 7
Stage 8
G Stage 9
Tahapan Pengecoran Sisi Kiri K225
Stage 6
Stage 7
Stage 8
Stage 9
Stage 1 Pondasi
Stage 2
Stage 3
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hulu(Kanan, Trap 2)
Stage 1 Pondasi
Stage 2
Stage 3

Sisi Hilir (Kanan, Trap 1)


Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kanan, Trap 2)
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kanan, Trap 3)
Stage 1 Pondasi
Stage 2
Stage 3

Sisi Hilir (Kiri, Trap 1)


Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kiri, Trap 2)
Stage 1 Pondasi
Stage 2
Stage 3
Sisi Hilir (Kiri, Trap 3)
Stage 1 Pondasi
Stage 2
Stage 3
Stage 3
Sisa Pekerjaan Lebar Bangunan Stage Pekerjaan Beton Stage Pekerjaan

Volume Vol. Beton


Panjang Lebar Tinggi Luas Panjang Tinggi
Beton ACC
Satuan
(m) (m) (m) (m2) (m) (m3) (m3) (m)
1 2 3 4

10.83 47.75 517.13 517.13 1.20


10.83 47.75 517.13 517.13 1.20
10.09 47.75 481.80 998.93 1.20
10.09 47.75 481.80 998.93 1.20
9.40 50.25 472.35 1,471.28 1.98
9.40 50.25 472.35 1,471.28 1.98
8.61 50.25 432.65 1,903.93 1.20
8.61 50.25 432.65 1,903.93 1.20
7.87 39.40 310.08 2,214.01 1.20
7.87 39.40 310.08 2,214.01 1.20
7.10 39.40 279.74 2,493.75 1.20
7.10 39.40 279.74 2,493.75 1.20
6.38 36.50 232.87 2,726.62 1.20
6.38 36.50 232.87 2,726.62 1.20
6.03 27.98 168.72 2,895.34 1.20
5.80 27.98 162.28 2,888.90 1.20
5.80 15.95 92.51 2,987.85 1.20
5.80 15.95 92.51 2,981.41 1.20
5.80 3.92 22.74 3,010.59 0.39
5.80 3.92 22.74 3,004.15 0.39
3.00 13.80 41.40 41.40 1.20
3.00 12.80 38.40 79.80 2.40
3.00 11.80 35.40 115.20 2.40

6.80 16.00 108.80 188.60 1.20


6.00 16.00 96.00 284.60 1.20
5.40 16.00 86.40 371.00 1.20
4.50 16.00 72.00 443.00 1.20
3.70 17.50 64.75 507.75 1.50
2.90 6.63 19.23 526.98 1.20

3.00 20.50 61.50 588.48 2.20


3.00 19.20 19.20 607.68 2.20
3.00 18.00 54.00 661.68 1.20

6.48 16.00 103.68 765.36 1.20


5.97 16.00 95.52 860.88 1.20
5.10 16.00 81.60 942.48 1.20
4.23 16.00 67.68 1,010.16 1.20
3.60 17.50 63.00 1,073.16 1.50
2.45 6.63 16.24 1,089.40 1.20
4.80 6.53 31.34 1,120.74 2.40
4.80 6.08 29.18 1,149.93 2.40
2.40 5.18 12.43 1,162.36 1.20

2.45 10.62 26.02 1,188.38 1.20


2.40 3.00 7.20 1,195.58 2.40
2.40 3.00 7.20 1,202.78 2.40
1.90 3.00 5.70 1,208.48 1.20
1.40 13.6 19.04 1,221.82 1.40
0.90 13.6 12.24 1,220.72 2.40
0.70 13.6 9.52 1,231.34 1.00
1.40 20.55 28.77 1,260.11 1
1.30 20.55 26.72 1,286.82 2.4
1.00 20.55 20.55 1,307.37 1

1.40 24.61 34.45 34.45 1


1.30 24.61 31.99 66.45 2.4
1.00 24.61 24.61 91.06 1

1.80 24.56 44.21 1,194.14 1.00


1.40 24.56 34.38 34.38 2.40
1.00 24.56 24.56 1,218.70 2.10

1.40 20.55 28.77 1,247.47 1.00


1.20 20.55 24.66 24.66 2.40
1.00 20.55 20.55 1,268.02 1.00

1.40 14.77 20.68 1,288.69 1.20


2.40 14.77 35.45 35.45 2.40
1.00 14.77 14.77 1,303.46 2.40

1.80 24.56 44.21 1,347.67 1.00


1.40 24.56 34.38 34.38 2.40
1.00 24.56 24.56 1,372.23 2.10

1.40 20.55 28.77 1,401.00 1.00


1.20 20.55 24.66 24.66 2.40
1.00 20.55 20.55 1,421.55 1.00

1.40 14.77 20.68 1,442.23 1.20


2.40 14.77 35.45 35.45 2.40
1.00 14.77 14.77 1,457.00 2.40
1.00 14.77 14.77 50.22 2.40
Stage Pekerjaan Bekisting Kebutuhan Material

Volume Vol. Bek. Jumlah Split Pasir Batu Kali Semen K 225 Semen K 175
BeKisting ACC Panel

(m2) (m2) 2.88 0.79 0.47 1.60 350.00 280.00

57.3 57.3 44.00 45.27 26.93 91.68 16,044.00


57.3 57.3 44.00 45.27 26.93 91.68 16,044.00
57.3 114.6 44.00 45.27 26.93 91.68 16,044.00
57.3 114.6 44.00 45.27 26.93 91.68 16,044.00
99.495 214.095 73.00 78.60 46.76 159.19 27,858.60
99.495 214.095 73.00 78.60 46.76 159.19 27,858.60
60.3 274.395 45.00 47.64 28.34 96.48 16,884.00
60.3 274.395 45.00 47.64 28.34 96.48 16,884.00
47.28 321.675 35.00 37.35 22.22 75.65 13,238.40
47.28 321.675 35.00 37.35 22.22 75.65 13,238.40
47.28 368.955 34.00 37.35 22.22 75.65 13,238.40
47.28 368.955 34.00 37.35 22.22 75.65 13,238.40
43.8 412.755 32.00 34.60 20.59 70.08 12,264.00
43.8 412.755 32.00 34.60 20.59 70.08 12,264.00
33.576 446.331 26.00 26.53 15.78 53.72 9,401.28
33.576 446.331 26.00 26.53 15.78 53.72 9,401.28
19.14 465.471 16.00 15.12 9.00 30.62 5,359.20
19.14 465.471 16.00 15.12 9.00 30.62 5,359.20
1.5288 466.9998 4.00 1.21 0.72 2.45 428.06
1.5288 466.9998 4.00 1.21 0.72 2.45 428.06
16.56 16.56 13.00 13.08 7.78 26.50 5,796.00
30.72 47.28 23.00 24.27 14.44 49.15 10,752.00
28.32 75.6 21.00 22.37 13.31 45.31 9,912.00

19.20 19.2 16.00 15.17 9.02 30.72 5,376.00


19.20 38.4 16.00 15.17 9.02 30.72 5,376.00
19.20 57.6 16.00 15.17 9.02 30.72 5,376.00
19.20 76.8 16.00 15.17 9.02 30.72 5,376.00
26.25 103.05 19.00 20.74 12.34 42.00 7,350.00
7.96 111.006 7.00 6.29 3.74 12.73 2,227.68

45.10 156.11 33.00 35.63 21.20 72.16 15,785.00


42.24 198.346 31.00 33.37 19.85 67.58 14,784.00
21.60 219.946 17.00 17.06 10.15 34.56 7,560.00

19.20 19.2 16.00 15.17 9.02 30.72 5,376.00


19.20 38.4 16.00 15.17 9.02 30.72 5,376.00
19.20 57.6 16.00 15.17 9.02 30.72 5,376.00
19.20 76.8 15.00 15.17 9.02 30.72 5,376.00
26.25 103.05 19.00 20.74 12.34 42.00 7,350.00
7.96 111.006 7.00 6.29 3.74 12.73 2,227.68
15.67 126.678 12.00 12.38 7.37 25.08 4,388.16
14.59 141.27 12.00 11.53 6.86 23.35 4,085.76
6.22 147.486 5.00 4.91 2.92 9.95 1,740.48

12.74 12.744 9.00 10.07 5.99 20.39 4,460.40


7.20 19.944 7.00 5.69 3.38 11.52 2,520.00
7.20 27.144 7.00 5.69 3.38 11.52 2,520.00
3.60 30.744 3.00 2.84 1.69 5.76 1,260.00
19.04 19.04 14.00 15.04 8.95 30.46 6,664.00
32.64 32.64 22.00 25.79 15.34 52.22 11,424.00
13.60 13.6 10.00 10.74 6.39 21.76 4,760.00
20.55 20.55 14.00 16.23 9.66 32.88 7,192.50
49.32 49.32 34.00 38.96 23.18 78.91 17,262.00
20.55 20.55 14.00 16.23 9.66 32.88 7,192.50

24.61 24.61 18.00 19.44 11.57 39.38 6,890.80


59.064 59.064 42.00 46.66 27.76 94.50 16,537.92
24.61 24.61 18.00 19.44 11.57 39.38 6,890.80

24.56 24.56 19.00 19.40 11.54 39.30 6,876.80


58.94 58.944 40.00 46.57 27.70 94.31 16,504.32
51.58 51.576 36.00 40.75 24.24 82.52 14,441.28

20.55 20.55 14.00 16.23 9.66 32.88 5,754.00


49.32 49.32 34.00 38.96 23.18 78.91 13,809.60
20.55 20.55 14.00 16.23 9.66 32.88 5,754.00

17.72 17.724 12.00 14.00 8.33 28.36 4,962.72


35.45 35.448 25.00 28.00 16.66 56.72 9,925.44
35.45 35.448 24.00 28.00 16.66 56.72 9,925.44

24.56 24.56 19.00 19.40 11.54 39.30 6,876.80


58.94 58.944 40.00 46.57 27.70 94.31 16,504.32
51.58 51.576 36.00 40.75 24.24 82.52 14,441.28

20.55 20.55 14.00 16.23 9.66 32.88 5,754.00


49.32 49.32 34.00 38.96 23.18 78.91 13,809.60
20.55 20.55 14.00 16.23 9.66 32.88 5,754.00

17.72 17.724 12.00 14.00 8.33 28.36 4,962.72


35.45 35.448 25.00 28.00 16.66 56.72 9,925.44
35.45 35.448 24.00 28.00 16.66 56.72 9,925.44
35.45 35.448 24.00 28.00 16.66 56.72 9,925.44
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15 16
17 18 19 20 21 22 23 24
JA

25 26 27 28 29 30 31 32
JADWAL PELAKSANAAN

33 34 35 36 37 38 39 40
41 42 43 44 45 46 47 48
49 50 51 52 53 54 55 56
57 58 59 60 61 62 63 64
65 66 67 68