Professional Documents
Culture Documents
Uraian Pekerjaan
I.1
I.2
I.3
I.4
I.5
I.6
II.1
II.2
II.3
II.4
II.5
II.6
II.7
II.8
III.1
III.2
III.3
III.4
Uraian Pekerjaan
PEKERJAAN PERSIAPAN
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
1 PER DKO 1
Pengecoran m3
Bekisting m2
Pembesian kg
2 PER DK-1
Pengecoran m3 606.49 883.41
Bekisting m2 473.98 568.88
Pembesian kg 2,447.16 1,957.73
4 RIVERTMENT DKO-DK1
Pengecoran m3 1,362.98 1,362.98
Bekisting m3 2,113.26 2,113.26
Pembesian kg 4,512.96 4,603.21
5 PER DK-2
Pengecoran m3 1,855.09 2,834.28
Bekisting m3
Pembesian kg 4,705.61 5,671.87
6 PER DPS-2
Pengecoran m3 677.18 1,102.05
Bekisting m3 517.18 567.51
Pembesian kg
7 PER DKO-2
Pengecoran m3 742.75 1,397.43
Bekisting m3 520.04 914.11
Pembesian kg 1,714.38 1,472.01
8 BO DPS-6
Pengecoran m3 2,709.28 6,341.49
Bekisting m2 1,535.92 3,069.30
Pembesian kg 5,381.68 7,676.60
9 BO DK-3
Pengecoran m3 1,099.30 2,608.39
Bekisting m2 836.69 1,199.00
Pembesian kg 4,331.09 5,008.35
10 BO DKI-4
Pengecoran m3 1,017.98 2,936.84
Bekisting m2 769.77 1,426.76
Pembesian kg 3,518.16 4,469.96
11 BO-DKO-1
Pengecoran m3 942.77 7,680.53
Bekisting m2 705.53 2,504.99
Pembesian kg 3,809.69 6,350.72
12 BO DK-2
Pengecoran m3 1,855.09 2,834.28
Bekisting m2 -
Pembesian kg 4,705.61 5,671.87
Galian m3 6,905.81 1,303.02
Urugan m3 1,472.02 2,116.05
13 BO DKI-6
Pengecoran m3 1,485.93 2,148.05
Bekisting m2 980.92 1,205.24
Pembesian kg 3,971.27 8,715.98
Galian m3 7,677.52 8,366.79
Urugan m3 1,601.65 788.46
14 BO DKI-5
Pengecoran m3 1,955.11 3,079.16
Bekisting m2 1,091.74 1,361.33
Pembesian kg 5,129.17 7,560.19
Galian m3 1,578.92 2,699.63
Urugan m3 1,729.71 1,813.70
15 BO DPS 5
Pengecoran m3 1,154.84 3,424.31
Bekisting m2 896.36 2092.56
Pembesian kg 10,918.53 5,671.87
Galian m3 2,388.18 1,962.54
TOTAL
LOKASI PENGECORAN
208.02
16.75 162.03 501.92
1,423.15 570.80
429.24 636.10
24.38 141.70 141.70 1,085.73
1,198.89 301.82
516.18 371.89
652.43
305.17
1,423.15 - - 570.80
- - - -
- - - -
710.73 - - 500.35
1,578.69 - - 3,175.15
6,056.03 6,165.14
1,123.84 1,577.13
798.88
790.85 673.41
1,517.68
591.46 104.9327
1,488.06
Retaining Wall Tanggul
Hilir
189.27
282.33
354.43 235.99
726.86 848.49
123.31
216.29
418.37
783.52
988.11
1,319.88
404.31
201.17
246.90
500.25
282.33
-
-
334.53
674.13
1,214.89
4,834.37
1,558.21
374.88
1,176.54
784.50
725.93
127.66
140.3164
1,120.14
1 Maindam
31.20 18.75
10.50
17.08
1.91
1.00
17.58
2.40
1.20
4.00 18.18
1.20
2.40
1.20
18.78
1.20
3.00
1.20
0.98
15.48
0.98
4.00
0.98
0.98
0.98
16.08
1.62
4.50
0.98
0.98
16.70 16.75
22.20
RETAINING WALL
1.1 0.6
1.0
1.1
0.9 1.0
1.1
1.2 1.0
3.4 1.4 1.0
2.4
1.4
1.4
TAHAPAN RENCANA PENGECORAN MAINDAM BO DKI 5
Subdam
17.50
10.50
6.36
1.91
1.00
1.22
1.20
1.20
1.20
2.40
1.20 1.00 Stage 9 - A = 3.45m2 1.20
1.20
1.20 0.98 Stage 8 - A = 4.27m2 1.20
1.20
2.40
1.20
0.98 Stage 7 - A = 5.13 m2
1.20
1.20
1.20
0.98 Stage 6 - A = 6.00 m2
1.20 1.20
0.98
0.98 Stage 5 - A = 6.87 m2
0.98 9.50 9.50 1.00
1.98
0.98 0.98 Stage 4 - A = 7.75 m2
1.00
0.98
1.20
1.05
0.98
1.62 Stage 3 - A = 14.65 m2
1.20
0.95
1.62 0.98 Stage 2 - A = 10.05 m2
1.02
0.98 0.98 Stage 1 - A = 10.92 m2
0.98
0.98
11.55
16.00
1.50 32.00
2.00 2.00 2.70
Apron
1.1 0.6
1.0
1.1
0.9 1.0
1.1
1.2 1.0
1.4 1.0
1.4
1.4
7.50 3.00
Exst. As Saluran
Stage 10 - R = 0.32 m2
Stage 9 - R = 0.84 m2
Stage 9 - R = 1.14 m2
Exst. As Saluran
Stage 10 - R = 0.32 m2
Stage 9 - R = 0.84 m2
Stage 9 - R = 1.14 m2
Stage 9 - R = 1.10 m2
Stage 9 - R = 0.84 m2
Stage 8 - R = 1.23 m2
Stage 6 - R = 2.45 m2
Stage 5 - R = 0
Stage 4 - R = 1.19 m2
Stage 3 - R = 2.63 m2
Stage 1 - R = 3.00 m2
0 17.50
2.00
4.88
1.91
1.22
2.40
2.40
2.40
1.07 Stage 5 - A = 3.60 m2 1.20
16.00 16.00
1.50
32.00 7.40
40.00
CL
Exst. As Saluran
0.50
0.95
Stage 10 - R = 0.32 m2
1.20
Stage 9 - R = 0.84 m2
5.03
1.20
4.00
Stage 9 - R = 1.14 m2
CL
Exst. As Saluran
0.50
0.95
Stage 10 - R = 0.32 m2
1.20
Stage 9 - R = 0.84 m2
5.03
1.20
4.00
Stage 9 - R = 1.14 m2
1.20
Stage 9 - R = 1.10 m2
1.21
Stage 9 - R = 0.84 m2
1.20
1.14
Stage 8 - R = 1.23 m2
+ 864.69
1.20
Stage 7 - R = 1.63 m2 1.14
4.00
1.15
Stage 6 - R = 2.45 m2
1.09 1.00
Stage 5 - R = 0.74 m2
1.19
1.13
Stage 4 - R = 1.19 m2
1.20
Stage 3 - R = 2.63 m2 1.14
32.00
20
1.20
1.20
1.20
4.00
4.00
4.00
4.00
SCHEDULE PELAKSANAAN 2018
Jam Kerja :
Hari Kerja Efektif / Bulan :
Sisa Pekerjaan
No Uraian Pekerjaan
Volume
A PERSIAPAN
B MOBILISASI ALAT
C GALIAN + COFFERDAM
D DEWATERING
1 2 3 4
m3
92.23
10.00 16.75 167.50 167.50 1.20
10.05 16.75 168.34 335.84 1.20
14.65 16.75 245.39 581.23 1.98
7.75 16.75 129.81 711.04 1.20
6.87 18.00 123.66 834.70 1.20
6.00 18.00 108.00 942.70 1.20
5.13 18.00 92.34 1,035.04 1.20
4.27 18.00 76.86 1,111.90 1.20
3.45 9.88 34.09 1,145.98 1.20
7.20 10.33 74.38 1,220.36 1.20
7.20 10.48 75.46 1,295.82 1.20
3.50 9.61 33.62 1,329.43 1.20
m3
m3
m3
3.20 15.07 48.22 4,170.90 1.20
3.20 15.07 48.22 4,219.13 1.20
2.75 15.07 45.59 4,264.71 1.20
2.45 15.07 40.61 4,305.33 1.20
2.09 15.07 34.65 4,339.97 1.20
1.73 15.07 28.68 4,368.65 1.20
1.27 15.07 21.05 4,389.70 1.20
0.81 15.07 13.43 4,403.13 1.20
0.50 15.07 3.77 4,406.90 1.20
3.20 20.95 67.04 4,473.94 1.20
3.20 20.95 67.04 4,540.98 1.20
2.75 20.95 63.37 4,604.35 1.20
2.45 20.95 56.46 4,660.81 1.20
2.09 20.95 48.16 4,708.98 1.20
1.73 20.95 39.87 4,748.84 1.20
1.27 20.95 29.27 4,778.11 1.20
0.81 20.95 18.67 4,796.78 1.20
0.50 20.95 5.24 4,802.02 1.20
42 43 44 45 46 47 48 49
JADWAL PELAKSANAAN
50 51 52 53 54 55 56 57
58 59 60 61 62 63 64 65
66 67 68 69 70 71 72 73
74 75 76 77 78 79 80 81
82 83 84 85 86 87 88 89
90 91 92 93 94 95 96 97
98 99 100
SCHEDULE PELAKSANAAN 2018 s/d 2019
Jam Kerja
Hari Kerja Efektif / Bulan
No Uraian Pekerjaan
A BO - DKI 4
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
C BO - DKI 6
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
E BO - DPS 6
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
G BO-DK 2
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
H BO-DPS 5
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
I PEREVETMENT
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
J RIVERT DKO2-DK1
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
K PER-DPS 2
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
L PER-DKO 1
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
M PER-DKO 2
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
N PER-DK 1
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
O PER-DK 2
Mobilisasi dan Demobilisasi
Jalan Masuk
Pembersihan Lapangan
Cofferdam
Dewatering
Jembatan Sementara
Harsat
Volume Satuan Volume Satuan
13148.73 m3 - m3 16,067.00
5840.02 m3 - m3 32,133.00
0.00 m3 - m3 18,331.00
0.00 m3 - m3 23,398.00
0.00 m3 - m3 34,203.00
8250.42 m3 - m3 45,063.00
0.00 m3 - m3 27,957.00
10738.33 m3 - m3 16,599.00
254.51 m3 - m3 874,044.14
7167.39 m3 - m3 827,500.00
12689.36 kg - kg 10,500.00
4908.00 m2 - m2 126,963.00
0.07 Ls - Ls 740,000,000.00
0.07 Ls - Ls 1,251,945,000.00
6404.00 m2 - m2 3,060.00
0.07 Ls - Ls 1,632,120,634.00
0.07 Ls - Ls 1,755,956,854.00
0.00 Unit - Unit 61,489,410.00
-
17641.65 m3 - m3 16,067.00
33099.84 m3 - m3 32,133.00
0.00 m3 - m3 18,331.00
0.00 m3 - m3 23,398.00
0.00 m3 - m3 34,203.00
44092.20 m3 - m3 45,063.00
0.00 m3 - m3 27,957.00
6649.29 m3 - m3 16,599.00
-
263.16 m3 - m3 874,044.14
6395.54 m3 - m3 827,500.00
9974.68 kg - kg 10,500.00
5192.58 m2 - m2 126,963.00
0.07 Ls 0.00 Ls 740,000,000.00
0.07 Ls 0.07 Ls 1,251,945,000.00
2,319.98 m2 2319.98 m2 3,060.00
0.07 Ls 0.07 Ls 1,632,120,634.00
0.07 Ls 0.07 Ls 1,755,956,854.00
- Unit 0.00 Unit 61,489,410.00
-
19,716.44 m3 14688.14 m3 16,067.00
45,132.59 m3 33464.87 m3 32,133.00
- m3 0.00 m3 18,331.00
- m3 0.00 m3 23,398.00
- m3 0.00 m3 34,203.00
58,506.35 m3 0.00 m3 45,063.00
- m3 0.00 m3 27,957.00
6,342.68 m3 0.00 m3 16,599.00
-
210.05 m3 179.04 m3 874,044.14
5,795.48 m3 3628.75 m3 827,500.00
9,339.44 kg 5509.15 kg 10,500.00
4,117.24 m2 1678.25 m2 126,963.00
0.07 Ls - Ls 740,000,000.00
0.07 Ls 0.06 Ls 1,251,945,000.00
4,523.22 m2 4,523.22 m2 3,060.00
0.07 Ls - Ls 1,632,120,634.00
0.07 Ls - Ls 1,755,956,854.00
- Unit - Unit 61,489,410.00
-
13,701.52 m3 - m3 16,067.00
7,571.75 m3 - m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
10,685.58 m3 - m3 45,063.00
4,116.83 m3 - m3 27,957.00
6,470.85 m3 - m3 16,599.00
-
308.69 m3 - m3 874,044.14
11,849.58 m3 - m3 827,500.00
13,058.28 kg - kg 10,500.00
7,918.50 m2 - m2 126,963.00
0.07 Ls 0.01 Ls 740,000,000.00
0.07 Ls 0.01 Ls 1,251,945,000.00
4,102.00 m2 2,468.23 m2 3,060.00
0.07 Ls 0.04 Ls 1,632,120,634.00
0.07 Ls 0.04 Ls 1,755,956,854.00
1.00 Unit - Unit 61,489,410.00
-
8,413.54 m3 1,736.67 m3 16,067.00
6,439.59 m3 1,396.26 m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
10,391.49 m3 - m3 45,063.00
1,283.33 m3 - m3 27,957.00
3,178.31 m3 - m3 16,599.00
-
284.74 m3 - m3 874,044.14
9,511.90 m3 2,708.57 m3 827,500.00
10,160.41 kg - kg 10,500.00
4,002.96 m2 1,416.13 m2 126,963.00
0.07 Ls - Ls 740,000,000.00
0.07 Ls 0.06 Ls 1,251,945,000.00
3,210.00 m2 3,210.00 m2 3,060.00
0.07 Ls 0.07 Ls 1,632,120,634.00
0.07 Ls 0.07 Ls 1,755,956,854.00
- Unit - Unit 61,489,410.00
-
9,177.31 m3 1,070.92 m3 16,067.00
8,033.98 m3 770.04 m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
12,469.06 m3 - m3 45,063.00
- m3 - m3 27,957.00
4,742.24 m3 - m3 16,599.00
-
221.66 m3 - m3 874,044.14
7,049.62 m3 719.34 m3 827,500.00
10,031.80 kg - kg 10,500.00
4,302.14 m2 652.88 m2 126,963.00
- Ls - Ls 740,000,000.00
- Ls - Ls 1,251,945,000.00
3,068.39 m2 - m2 3,060.00
- Ls - Ls 1,632,120,634.00
- Ls - Ls 1,755,956,854.00
- Unit - Unit 61,489,410.00
-
9,011.41 m3 - m3 16,067.00
1,868.45 m3 - m3 32,133.00
- m3 - m3 18,331.00
- m3 - m3 23,398.00
- m3 - m3 34,203.00
3,952.27 m3 - m3 45,063.00
2,478.16 m3 - m3 27,957.00
4,444.30 m3 - m3 16,599.00
-
- m3 - m3 874,044.14
3,318.89 m3 - m3 827,500.00
115,718.27 kg - kg 10,500.00
5,145.65 m2 - m2 126,963.00
MC0
1.00 1.00 - 740,000,000.00
1.00 1.00 - 1,251,945,000.00
55,783.34 55,783.34 - 3,060.00
1.00 1.00 - 1,632,120,634.00
1.00 1.00 - 1,755,956,854.00
2.00 2.00 - 61,489,410.00
28
Total MCO Progres Bobot %
25-May-2018
27-May-2018
52,857,142.86 -
89,424,642.86 71,539,714.29
10,400,940.00 7,552,794.40
116,580,045.29 58,290,022.64
125,425,489.57 62,712,744.79
- -
- -
119,305,990.51 -
416,950,096.08 -
- -
- -
433,048,971.42 -
- -
- -
128,478,749.85 -
- -
170,845,911.16 -
5,050,594,366.25 -
81,392,745.00 -
451,191,041.23 -
52,857,142.86
89,424,642.86
17,072,046.00
116,580,045.29
125,425,489.57
-
211,260,603.78
187,657,341.93
-
-
-
371,788,532.03
-
178,245,539.67
222,449,476.97
5,931,013,032.13
133,238,280.00
623,133,845.36
52,857,142.86
89,424,642.86
19,596,240.00
116,580,045.29
125,425,489.57
-
-
283,448,467.99
1,063,597,149.88
-
-
-
1,986,926,870.11
-
110,371,617.49
-
230,013,454.93
5,292,309,350.00
104,734,140.00
659,265,534.54
52,857,142.86 -
89,424,642.86 89,424,642.86
7,099,146.76 7,099,146.76
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
316,784,045.18 235,994,417.68
1,450,245,385.22 1,075,326,667.71
- -
- -
- -
2,636,471,477.80 -
- -
105,282,145.82 -
- -
183,594,718.93 156,493,006.84
4,795,761,495.68 3,002,794,692.78
98,064,120.00 57,846,075.00
522,736,710.45 213,075,634.44
52,857,142.86 -
89,424,642.86 71,539,714.29
13,841,056.26 13,841,056.26
116,580,045.29 -
125,425,489.57 -
- -
- -
220,142,346.86 -
243,303,041.30 -
- -
- -
- -
481,524,485.09 -
115,094,348.13 -
107,409,680.69 -
- -
269,805,625.30 -
9,805,531,173.75 -
137,111,940.00 -
1,005,357,004.31 -
52,857,142.86 7,077,523.72
89,424,642.86 17,884,928.57
12,552,120.00 7,552,794.40
116,580,045.29 58,290,022.64
125,425,489.57 62,712,744.79
61,489,410.00 -
- -
135,180,347.18 27,903,044.76
206,923,345.47 44,866,022.58
- -
- -
- -
468,271,713.87 -
35,878,056.81 -
52,756,767.69 -
- -
248,875,327.39 -
7,871,097,250.00 2,241,342,566.63
106,684,305.00 -
508,227,810.48 179,796,113.19
52,857,142.86 -
89,424,642.86 71,539,714.29
9,822,600.00 9,822,600.00
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
147,451,869.01 17,206,415.41
258,156,007.95 24,743,631.05
- -
- -
- -
561,893,236.81 -
- -
78,716,377.56 -
- -
193,739,749.22 -
5,833,561,530.24 595,255,337.43
105,333,900.00 -
546,212,892.83 82,892,111.29
52,857,142.86 -
89,424,642.86 -
31,350,720.36 -
116,580,045.29 -
125,425,489.57 -
- -
- -
180,624,071.72 -
223,611,035.48 -
- -
- -
- -
156,662,548.29 -
241,191,778.31 -
101,205,544.71 -
- -
168,443,513.45 -
5,150,768,722.94 -
441,892,395.00 -
485,713,925.10 -
52,857,142.86 31,820,000.00
89,424,642.86 69,197,640.31
12,168,284.82 4,415,418.04
116,580,045.29 91,831,767.10
125,425,489.57 98,799,449.93
- -
- -
191,960,044.31 109,851,420.59
81,940,465.66 46,891,526.24
- -
- -
- -
230,814,720.36 5,407,560.00
93,907,749.85 86,218,828.86
99,867,250.13 53,533,956.77
- -
- -
3,559,241,691.70 2,886,642,607.11
1,574,665,452.57 1,291,697,305.12
846,669,837.56 724,014,101.28
- -
- -
9,389,280.34 -
- -
- -
- -
- -
144,786,361.55 -
60,038,787.11 -
- -
- -
- -
178,101,034.70 -
69,281,790.18 -
73,771,015.67 -
- -
- -
2,746,378,684.40 -
1,215,041,856.83 -
653,306,573.70 -
52,857,142.86 37,000,000.00
89,424,642.86 89,424,642.86
9,748,601.55 9,748,601.55
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
65,780,418.84 60,032,240.72
86,293,814.16 81,047,925.18
- -
- -
- -
60,522,312.78 5,566,181.76
32,447,984.52 -
70,976,494.05 -
- -
73,292,971.05 56,304,175.18
2,257,365,848.40 1,956,285,137.00
42,009,660.00 22,281,420.00
370,707,430.75 183,970,656.63
52,857,142.86 37,000,000.00
89,424,642.86 71,539,714.29
4,989,201.48 4,989,198.42
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
110,877,981.39 101,466,776.31
181,697,896.95 167,962,741.70
- -
- -
- -
204,055,751.29 -
51,733,869.36 -
102,529,048.46 4,979,700.00
- -
72,196,045.66 64,803,642.57
1,931,236,950.95 1,768,914,862.29
40,063,800.00 31,319,610.00
190,554,551.53 218,697,760.49
52,857,142.86 37,000,000.00
89,424,642.86 89,424,642.86
8,119,732.95 8,119,732.95
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
61,489,410.00 61,489,410.00
- -
161,867,097.74 149,888,681.49
252,616,524.57 81,047,925.18
- -
- -
- -
581,568,578.03 1,996,290.90
1,238,616.43 -
82,764,534.44 -
- -
60,672,647.77 40,760,786.09
2,754,603,042.65 1,637,238,035.23
33,457,095.00 16,728,547.50
386,469,220.64 107,509,576.78
52,857,142.86 44,400,000.00
89,424,642.86 89,424,642.86
2,446,895.16 2,446,895.16
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
52,138,861.03 52,138,861.03
37,098,512.49 37,098,512.49
- -
- -
- -
- -
125,093,876.07 5,291,980.53
38,009,316.42 38,009,386.14
- -
65,943,133.91 60,994,296.01
1,611,936,482.11 1,670,614,799.22
46,251,345.00 46,251,345.00
216,426,208.32 214,291,500.68
52,857,142.86 52,857,142.86
89,424,642.86 89,424,642.86
2,100,162.15 2,100,162.15
116,580,045.29 116,580,045.29
125,425,489.57 125,425,489.57
- -
- -
91,047,672.25 77,447,117.42
115,645,381.68 112,304,192.34
7,107,978.55 -
56,155,200.00 -
- -
136,078,689.54 -
1,331,577.65 1,331,591.91
56,612,217.42 27,206,258.97
- -
65,986,836.12 65,986,836.12
1,307,912,098.07 1,291,921,552.47
46,251,345.00 44,171,469.77
196,986,131.03 196,986,131.03
103,471,639,577.53 27,194,014,159.76
740,000,000.00
1,251,945,000.00
170,697,027.82
1,632,120,634.00
1,755,956,854.00
122,978,820.00
2,432,656,179.35
4,865,774,785.94
7,107,978.55
56,155,200.00
433,048,971.42
8,054,679,950.70
767,199,647.32
1,386,996,300.07
2,025,859,411.87
65,899,311,719.26
4,206,192,379.40
7,662,958,717.84
103,471,639,577.53
2 3 4 5 6
29 30 31 32 33
28-May-2018 4-Jun-2018 11-Jun-2018 18-Jun-2018 25-Jun-2018
LIBUR LEBARAN
N
N LIBUR LEBARAN LIBUR LEBARAN
LIBUR LEBARAN
7 8 9 10 11
34 35 36 37 38
2-Jul-2018 9-Jul-2018 16-Jul-2018 23-Jul-2018 30-Jul-2018
39 40 41 42 43
6-Aug-2018 13-Aug-2018 20-Aug-2018 27-Aug-2018 3-Sep-2018
44 45 46 47 48
10-Sep-2018 17-Sep-2018 24-Sep-2018 1-Oct-2018 8-Oct-2018
49 50 51 52 53
15-Oct-2018 22-Oct-2018 29-Oct-2018 5-Nov-2018 12-Nov-2018
54 55 56 57 58
19-Nov-2018 26-Nov-2018 3-Dec-2018 10-Dec-2018 17-Dec-2018
KIRI
22.5
1.1
1.1
1.0
2.2 2.2 26.1
2.0
2.2
2.1
2.0 27.6
1.0
1.0
1.0
1.0
1.0
1.0
1.0
26.1 28.3
5.0
54.4
Apron
RETAINING WALL HILIR
1
1.1
1.1
+790,090
TAHAPAN RENCANA PENGECORAN MAINDAM BO DKI 5
Subdam
KANAN
27.5
1
1.0 Stage 10 A = 3 m2
26.1
2.0 Sta ge 9 A = 3 m2
27.6
2.0 Stage 8 A = 3 m2
1.2
1.0
1.2 Sta ge 7 A = 3.5 m2
1.0
1.2 Stage 6 A = 4.2 m2
1.0
1.2 Stage 5 A =5 m2
21.0
A
18,50 3,42
2,84
RETAINING WALL HULU
A
1.1
1.0
1.0 1.1 0.6
.6 1.0
.0 1.1 1.2
1.0
0 1.1
0.6 1.4 1.0
0 1.1
0.9
1.1
1.2
1.1
1.1 0.7 1.4
1.1 1.0
1.1 1.3
1.6
1.8
35.5
1.1
Stage 9 A = 3 m2 1.0
2.2 1.0
Stage 8 A = 3 m2
2.0
2.0
2.2 5.0
Stage 7 A = 3 m2
2.0
2.0 1.2
1.0
1.2 Stage 6 A = 3.0 m2
1.0 1.0
2.0 1.2 Stage 5 A = 3.7 m2
1.0 1.0
1.2 Stage 4 A = 4.5 m2
1.0 1.0
2.0 1.2 Stage 3 A = 5.3 m2
1.0 1.0
1.2 Sta ge 2 A = 6.1 m2
1.0 1.0
2.0 Stage 1 A = 6.8 m2
1.0
21.0 25.0
A
11,34 1.1
1.0
1.1
1.0
1.1
1.0
1.1
1.0 0.6
1.1
1.0 1.0
1.2 1.1
1.0
1.0 1.4 1.0
3,42
8,50
2,84
1.1 0.6
1.0
1.1
0.9 1.0
1.1
1.2 1.0
3.4 1.4 1.0
2.4
1.4
1.1 0.6
1.0
1.1
0.9 1.0
1.1
1.2 1.0
3.4 1.4 1.0
2.4
1.4
1.4
1.1
1.0
1.1 0.6
1.0
1.1 1.2
1.0
1.1
0.6 1.0
1.1
0.9
1.1
1.2
1.1
1.1 0.7 1.4
1.1 1.0
1.1 1.3
1.6
Stage 9 A = 3 m2 1.0
Stage 8 A = 3 m2
2.0
Stage 7 A = 3 m2
2.0
1.0
Stage 6 A = 3.0 m2
1.0
Stage 5 A = 3.7 m2
1.0
Stage 4 A = 4.5 m2
1.0
Stage 3 A = 5.3 m2
1.0
Stage 2 A = 6.1 m2
1.0
Stage 1 A = 6.8 m2
1.1
1.0 0.6
1.1
1.0 1.0
1.2 1.1
1.0
1.0 1.4 1.0
1.1
1.0
1.1 0.6
1.0
1.1 1.2
1.0
.6 1.0
Sisa Pekerjaan
No Uraian Pekerjaan
Volume
A PERSIAPAN
B MOBILISASI ALAT
C GALIAN
D DEWATERING
25 26 27 28 29 30 31 32 33
JADWAL PELAKSANAAN
33 34 35 36 37 38 39 40 41
41 42 43 44 45 46 47 48 49
49 50 51 52 53 54 55 56 57
57 58 59 60 61 62 63 64 65
65 66 67 68
MAINDAM
57.6
1.1
11.8
11.8 2.2
12.8
12.8 2.2
13.8
13.8
10.0
11.8 1.1
1.0
1.0 Satege 103.0 2.2
2.0 Stage 9 5.0
12.8 2.0 3.0 2.2
2.0 Sateg 8
13.8 11.0
2.0 3.0
1.0 1.2
1.0
Sateg 7 3.3
1.0 1.2
1.0 Stage 6 4.3
1.0 1.2
1.0 Stage 5 4.9
1.0 1.2
1.0 Stage 4 5.6
1.0 1.2
1.0 Stage 3 6.6
1.0 1.2
1.0 Stage 2 7.3
1.0 1.2
1.0 Stage 18.2
2.5 3.3
2.2
2.5
1.0
2.2
5.0
2 2.0
2.0
2.0
1.0 2.9 1.2
1.0 1.2
2.0 3.7
1.0 1.2
4.5
1.0 1.2
2.0 5.4
1.0 1.2
6.0
1.0 6.8 1.2
1.1
0.7 0.7 1.1
1.9 1.0
0.9 1.0 1.1
1.0
2.4 1.3
1.0 1.1
1.7 1.4 1.0
1.10.7
1.0 1.1
1.0 2.4 1.1
2.4 1.0
2.4 1.3
1.0
1.4 1.0
1.0 2.8 1.0
13,62
12,83
1,80
1,80
1.1
1.0
1.1 0.6
1.0
1.1 1.2
1.0
0.6 1.0
1.1
1.0
1.1 0.6
1.0
1.1 1.2
1.0
0.6 1.0
2.1 1.0
0.7 1.4
1.0
2.4 1.3
1.6
1.0 1.8
2.5
1.0
2.0
2.0
1.1
1.0
1 0.6
1.0
1.2 1.0
1.0
1.1
1.0
1 0.6
1.0
1.2 1.0
1.0
Sisa Pekerjaan
No Uraian Pekerjaan
Volume
A PERSIAPAN
B MOBILISASI ALAT
C GALIAN
D DEWATERING
E PEKERJAAN MAINDAM
Tahapan Pengecoran K175
Stage 1 A
Stage 1 B
Stage 2A
Stage 2B
Stage 3A
Stage 3B
Stage 4A
Stage 4B
Stage 5A
Stage 5B
Stage 6A
Stage 6B
Stage 7A
Stage 7B
Tahapan Pengecoran K225 Sisi Kanan
Stage 8
Stage 9
Stage 10
PEKERJAAN SUBDAM
F Tahapan Pengecoran Sisi Kanan K175
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Tahapan Pengecoran Sisi Kanan K225
Stage 7
Stage 8
Stage 9
Volume Vol. Bek. Jumlah Split Pasir Batu Kali Semen K 225 Semen K 175
BeKisting ACC Panel
25 26 27 28 29 30 31 32
JADWAL PELAKSANAAN
33 34 35 36 37 38 39 40
41 42 43 44 45 46 47 48
49 50 51 52 53 54 55 56
57 58 59 60 61 62 63 64
65 66 67 68
MAINDAM
32,50
0,39
1,20
1,20
1,00
1,20
1,50 1,20
11,19 2,05 1,20
1,20
1,20
1,20
1,20
DINDING APRON
0,79
2,40
2,40
1,50
2,30
SUBDAM
35,00
0,39
1,20 Stage 10 - 5,95 1,20
1,20
1,20 Stage 9 - 5,98 1,20
1,20
1,20
Stage 8 - 6,03 1,20
1,20
1,20
1,20
1,20 Stage 7 - 6,39 1,20
1,20
7,65
2,00
1,60
1,60
2,40 2,00
2,40
1,90
1,91
2,60
1,20
3,55 1,20
4,25 1,20
5,03 1,20
5,80
Sisa Pekerjaan
No Uraian Pekerjaan
Volume
A PERSIAPAN
B MOBILISASI ALAT
C GALIAN
D DEWATERING
E PEKERJAAN MAINDAM
Tahapan Pengecoran K175
Stage 1 A
Stage 1 B
Stage 2A
Stage 2B
Stage 3A
Stage 3B
Stage 4A
Stage 4B
Stage 5A
Stage 5B
Stage 6A
Stage 6B
Stage 7A
Stage 7B
Stage 8A
Stage 8B
Stage 9A
Stage 9B
Stage 10A
Stage 10B
Tahapan Pengecoran Sisi Kiri K225
Stage 9
Stage 10
Stage 11
PEKERJAAN SUBDAM
F Tahapan Pengecoran Sisi Kanan K175
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Tahapan Pengecoran Sisi Kanan K225
Stage 7
Stage 8
Stage 9
Volume Vol. Bek. Jumlah Split Pasir Batu Kali Semen K 225 Semen K 175
BeKisting ACC Panel
25 26 27 28 29 30 31 32
JADWAL PELAKSANAAN
33 34 35 36 37 38 39 40
41 42 43 44 45 46 47 48
49 50 51 52 53 54 55 56
57 58 59 60 61 62 63 64
65 66 67 68