You are on page 1of 1

Part: Floor Slab Page: 1 of 1

PERUNDING ALAM BAKTI


Single Storey Warehouse Rev:
Project No: PAB 831 Date: 28-Jan-19
Client : Industrial Concrete Products Designed By : Tini Checked By : Ir.Harry

BS 8110 ref. CALCULATIONS OUTPUT

fcu = 40 fy = 460

300mm
3000mm

Table 3.4 DURABILITY and FIRE RESISTANCE


Nominal cover for mild condition of exposure = 20 mm Cover = 20mm
Max. fire resistance of 300mm slab with 20 = 1.5 hr > 1 hr 1 hr fire resistance OK!
cover
LOADING
Self-weight 0.300 x 24 = 7.2
Finishes = 2
Characteristic dead load = 9.2 kN/m2 gk = 9.2kN/m2
3.5.2.4 Characteristic imposed load = 11 kN/m2 qk = 5 kN/m2
Table 3.12 Design Load = (1.4x9.2 + 1.6x11) x 19 = 579.12 kN/m width F= 62.64 kN/m width
3.5.2.4 ULTIMATE BENDING MONENTS
Table 3.12 Interior mid-span 0.063FL = 0.063 x 125.28 x 3 = 23.7 kNm/m
and supports
REINFORCEMENT d= 150 mm
3.4.4.4 Interior mid-span K = M = 23.7 x 10^6 = 0.053
and supports fcubd2 40x10^3x150^2

z = 150 (0.5 +√(0.25 - 0.053/0.9) = 140.6 (but < 0.685d = 142.5) Top & Bottom
x = (d-z) / 0.45 = (150-140.6)/0.45 = 21 T12@125
(905mm2/m)
As = M = 47.4 x 10^6 = 772 mm2/m
0.95fyz 0.95x460x140.6

Check for shear :


Table 3.8 v = 0.5 x 125.28 x 10^3 = 0.42 N/mm2 < vc OK!
10^3 x 150
3.4.6 DEFLECTION basic span/eff. Depth ratio = 26 Max.
Table 3.9 M = 47.4 x 10^6 = 2.11
bd2 10^3 x 150^2
fs = 2 x 460 x 772 = 261.6 N/mm2
3 x 905
Table 3.10 Modification factor for tension reinf's. = 1.2
Allowable span/eff. Depth ratio = 26 x 1.2 = 31.2
Actual span/eff. Depth ratio = 3000/150 = 20 L/d Ratio OK!
3.12.11.2.7 CRACKING 3d = 3 x 150 = 450.00
Spacing between bars = 125-12 = 113mm < 3d Spacing OK!