You are on page 1of 2
Test notes for generator U040805e Principle schematic: tr Collector 1. Check collector (picture 1) ~ Measure resistance from collector coil (DF) to collector coil (D-). tpoint = - check for wear. 2. Check rectifier diodes (picture 2) measure resistance at all 6 rectifier diodes. Check the barring direction (4). Results: When the rectifier diode is in order the gauge will display a high resistance and after chan ging of the measuring cables will show a low resistance. Note: Switch gauge beforehand to symbol , + ,! Check soldering and clamping connections for corosion! Lisbherr-Werk Ehingen GmbH, Kundendienst 2) LIEBHERR 10032402 Mundendienst-Information ib Service Information lt iP . Information du service LIEBHERR-WERK EHINGEN GMBH D-89582 Ehingen/Donau - Tel. (07391) 502-0 Datum Abteilung Nr. 02.06.2008 __VKD /juht U040805e Liebherr - Diesel Engine D934/D936-A6 and D836/D846/D9508-A7 Notes for fault finding at notification of overvoltage from the gearbox control unit. At failure notification (overvoltage, e. g.: E 97 5923) from the ZF gearbox control unit the failure reason in most cases can be found at the voltage regulator (> 29,5 V) of the generator. Therefor as first action for remedy the voltage regulator should be exchanged. At the same time further components of the generator (diodes, collectors) should be checked while the gene- rator is dismantled. Generator - test notes, see page 2. 1. Dismantle the generator (1) 2. Dismantle cover (2) ~ 2 nuts (a) and 1 screw (b) to be taken off 3. Dismantle voltage regulator (3) unscrew 3 screws (c) and take off voltage regulator (3) . DF. Nee D Assembly in inverse sequence! Leber Werk Ehingen GmbH, Kundendenst 1 LEBHERR Annonann

You might also like