Principle schematic:
tr
Collector
1. Check collector (picture 1)
~ Measure resistance from collector
coil (DF) to collector coil (D-).
tpoint =
- check for wear.
2. Check rectifier diodes (picture 2)
measure resistance at
all 6 rectifier diodes.
Check the barring direction (4).
Results:
When the rectifier diode is in
order the gauge will display
a high resistance and after
chan ging of the measuring
cables will show a low
resistance.
Note:
Switch gauge beforehand
to symbol , + ,!
Check soldering and
clamping connections
for corosion!
Lisbherr-Werk Ehingen GmbH, Kundendienst 2) LIEBHERR
10032402Mundendienst-Information
ib Service Information
lt iP . Information du service
LIEBHERR-WERK EHINGEN GMBH
D-89582 Ehingen/Donau - Tel. (07391) 502-0
Datum Abteilung Nr.
02.06.2008 __VKD /juht U040805e
Liebherr - Diesel Engine D934/D936-A6 and D836/D846/D9508-A7
Notes for fault finding at notification of overvoltage from the gearbox control unit.
At failure notification (overvoltage, e. g.: E 97 5923)
from the ZF gearbox control unit the failure reason in
most cases can be found at the voltage regulator (>
29,5 V) of the generator. Therefor as first action for
remedy the voltage regulator should be exchanged.
At the same time further components of the generator
(diodes, collectors) should be checked while the gene-
rator is dismantled.
Generator - test notes, see page 2.
1. Dismantle the generator (1) 2. Dismantle cover (2)
~ 2 nuts (a) and 1 screw (b) to be taken
off
3. Dismantle voltage regulator (3)
unscrew 3 screws (c) and take off voltage
regulator (3) .
DF. Nee
D
Assembly in inverse sequence!
Leber Werk Ehingen GmbH, Kundendenst 1 LEBHERR