Professional Documents
Culture Documents
Copy to,
To
Managing Director, PGCB
Project Director & Chief Engineer
National Power Transmission Network Development (NPTND) Project
Mohakhali, Power Grid Company of Bangladesh (PGCB) √ Executive Director (P & D), PGCB
Bangladesh.
√ Chief Engineer (P & D/Project), PGCB
Kind Attn: Mr.
√ ETERN-HEI-FEPEC Consortium
√ Consultant
Dear Sir,
√ Master File
We are pleased to enclose the following documents for the purpose indicated below: Issued by:
In case of any modification other than those desired are carried out, the same shall be
highlighted clearly in the Drawing/Document with full justification thereof and resubmitted
for approval. (Engr. Md. Delowar Hossain)
Superintending Engineer
Approval/Comments/Information conveyed herein neither relieves the contractor of his Civil Design, P&D
contractual obligation and his responsibilities for correctness of dimensions, material of
constructions, weight, quantities, design details, assemble fits, performance particulars
PGCB, Dhaka
and conformity of the supplies with the Statutory Laws of Bangladesh as may be Our Ref:
applicable, nor does it limit the Employer’s right under the contract.” 27.21.0000.412.49.001.18.311
Date: 04.06.2018
For information
(FI)
Received by Date
Page 1 of 1