S A U D I O G E R P R O D U C T I V I T Y R AT E

Estimated
TRADE ACTIVITY DESCRIPTION Quantity
Unit Days Gv. Qty Gv. Days

005 EARTHWORKS Bed manual Final Grading in Normal soil m³ 0 70 1.0


EARTHWORKS Bed manual Final Grading in Rock m³ 0 18 1.0
010 FOUNDATIONS m³ 0 5 1.0
020 REINFORCED CONCRETE STRUCTURE m³ 0 5 1.0
GROUND SLAB/CRAWL SPACE m³ 0 5 1.0
VERTICAL STRUCTURE m³ 0 3 1.0
HORIZONTAL STRUCTURE m³ 0 5 1.0
030 MASONRY WORKS
BLOCKS (0.10; 0.15; 0.20) m² 0 5 1.0
REINFORCEMENT ML 0 10 1.0
REINFORCEMENT AND BLOCKS m² 0 3 1.0
PLASTERS 500 m² 42 3 1.0
SCREEDS m² 0 70 1.0
BLOCKS FOR CLOSING SHAFTS 500 m² 42 3 1.0
080 WATERPROOFING
INSULATING m² 0 175 1.0
WATERPROOF 2 LAYERS m² 0 150 1.0
DRAINING m² 0 150 1.0
PROTECTION WITH SCREED m² 0 70 1.0
PROTECTION WITH GRAVEL m² 0 125 1.0
MULTI-LAYERS WATERPROOF m² 0 30 1.0
INTERIOR (DAMP ROOM) m² 0 10 1.0
TECHNICAL ROOM (SURFACE<50 m²) m² 0 25 1.0
TECHNICAL ROOM (SURFACE>50 m²) m² 0 100 1.0
SWIMMING POOL AND FOUNTAIN m² 0 400 1.0
090 ROOF-COVERING TILES
TILES m² 0 2 1.0
DOMES m² 0 5 1.0
100 INSULATING LINING
DRY ROOM (CD1 panels 3.00 x 1.20) m² 0 25 1.0
DAMP ROOM (CD10 Siporex) m² 0 17 1.0
Ceiling CD30 (fibralith) m² 0 30 1.0
110 DRY AREA PARTITION
DRY ROOM WITH INSULATION (HT < 3m) m² 0 7 1.0
DRY ROOM WITH INSULATION (HT > 3m) m² 0 4 1.0
120 MOVABLE PARTITION
RAIL m² 0 10 1.0
PANELS m² 0 20 1.0
130 FALSE CEILING
MINERAL FIBER m² 0 20 1.0
METAL m² 0 15 1.0
131 FIBROUS PLASTER-GYPSUM
SIMPLE STAFF (Flat,no cornice with bank moulding) m² 0 3 1.0
MEDIUM STAFF (Cornice, rosace, frise) m² 0 2 1.0
COMPLEX STAFF (Cornice with fillet,rosace,luminous ramp) m² 0 2 1.0
150 EXTERIOR WOOD JOINERY
WINDOW (FRAME) u 0 4 1.0
WINDOW (LEAF) u 0 4 1.0
WINDOW (GLAZING) u 0 6 1.0
WINDOW: ALL (Frame,window leaf, glazing) u 0 1 1.0
DOOR (FRAME) u 0 10 1.0
DOOR (LEAF) u 0 2 1.0
ALL (Door frame & leaf) u 0 1 0.6
151 DOOR NOBLE (VIP) u 0 1 1.0
DOOR STAFF u 0 3 1.0
160 EXTERIOR ALUMINUM JOINERY

Prepared by: Russel Carandang, RCE Page 1


WINDOW (Frame) u 0 10 1.0
WINDOW (Leaf) u 0 10 1.0
WINDOW (Glazing) u 0 5 1.0
WINDOW (Bulletproof glazing) u 0 5 1.0
WINDOW ALL STANDARD u 0 1 0.4
ROOLING SHUTTER FOR STANDARD WINDOW u 0 1 0.4
DOOR (Frame) u 0 1 0.4
DOOR (Leaf) u 0 1 0.4
DOOR (Block) u 0 1 0.5
ROOLING SHUTTER FOR STANDARD DOOR u 0 1 0.4
190 METAL WORKS
METAL GATE u 0 1 1.0
METAL DOOR u 0 3 1.0
SUPPORT CHANDELIER u 0 4 1.0
SUPPORT CHANDELIER TEST u 0 4 2.0
SUPPORT MARBLE (VANITY) u 0 3 1.0
BATHROOM ACCESSTRAP u 0 4 1.0
191 DECORATIVE METAL WORKS
RAILING u 0 1 1.0
STAIR HANDRAIL u 0 1 1.0
200 MIRRORS u 0 1 1.0
210 GLUED CARPET m² 0 200 1.0
VINYL TILE m² 0 100 1.0
211 PLAIN CARPET m² 0 30 1.0
DESIGN CARPET m² 0 20 1.0
220 TILING WORKS
GLUED WALL TILLING m² 0 6 1.0
GLUED FLOOR TILLING m² 0 8 1.0
230 STRETCHED WALL FABRICS m² 0 100 2.0
240 INTERNAL MARBLE
MATCHED m² 0 2 1.0
GLUED m² 0 5 1.0
250 FAÇADE SURFACE FINISHING
MANUAL SANDTEX m² 0 20 1.0
MECHANICAL SANDTEX m² 0 150 1.0
CLOSE SURFACE m² 0 250 1.0
OPEN SURFACE m² 0 115 1.0
260 INTERIOR PAINTING
WALL (MAKING GOOD) m² 0 250 1.0
WALL (MECHANICAL SANDTEX) m² 0 450 1.0
ROLLER PAINTING m² 0 150 1.0
SPRAY GUN PAINTING m² 0 600 1.0
CEILING (PLASTER) m² 0 25 1.0
CEILING (SANDPAPER) m² 0 50 1.0
CEILING (SPRAYGUN PAINTING) m² 0 80 1.0
CEILING (COLOR FILLET) m² 0 2 1.0
261 BONDED COVERING WALL FABRICS
MAKING GOOD m² 0 250 1.0
MECHANICAL SANDPAPER m² 0 450 1.0
1 LAYER FIXING m² 0 200 1.0
LAYING m² 0 60 1.0
270 EXTERNAL MARBLE
NORMAL ELEVATION m² 0 4 1.0
DIFFICULT ELEVATION m² 0 2 1.0
300 CURTAINS
RAIL ML 0 20 1.0
FABRICATION pair 0 1 1.0
LAYING u 0 1 0.3
320 LIGHTING FIXTURES AND CHANDELIERS
CHANDELIER u 0 1 1.0
WALL LIGHT u 0 10 1.0

Prepared by: Russel Carandang, RCE Page 2


330 WOOD FITTINGS m² 0 1 1.0
WOOD WALL FITTING m² 0 2 1.0
WOOD CORNICE ML 0 2 1.0
WOOD SKIRTING ML 0 20 1.0
WOOD MOULDING ML 0 25 1.0
STAFF VERTICAL m² 0 2 1.0
CUPBOARD u 0 1 1.0
CURTAIN BOX m² 0 1 1.0
400 HVAC GLOBAL PER m² m² 0 1 1.1
DUCTING AND PIPPING m² 0 1 0.3
EQUIPMENT m² 0 1 0.4
FINISHING m² 0 1 0.3
TESTING m² 0 1 0.1
410 PLUMBING GLOBAL PER m² m² 0 1 0.5
PIPES AND NETWORKS m² 0 1 0.1
EQUIPMENT m² 0 1 0.3
FINISHING AND TESTING m² 0 1 0.0
420/430 INDUSTRIAL KITCHEN/PANTRIES
ELECTRIC EUROPEAN (VIP-ROYALE) u 0 1 15.0
ELECTRIC STAFF u 0 1 10.0
GAZ EUROPEAN (VIP-ROYALE) u 0 1 21.0
GAZ STAFF u 0 1 16.0
450/460 HIGH CURRENT / LOW CURRENT GLOBAL PER m² m² 0 1 0.7
INCORPORATIONS m² 0 1 0.1
CABLE TRAY m² 0 1 0.2
PIPPING AND WIRING m² 0 1 0.3
FINISHING AND TESTING m² 0 1 0.0
790 LANDSCAPING m² 0 1 0.2
800 SIGN POST INTERIOR u 0 10 1.0
SIGN POST EXTERIOR u 0 5 1.0
900 EXTERNAL PAVING m² 0 8 1.0
910 EXTERNAL FOUNTAIN MARBLE m² 0 1 1.0
EXTERNAL FOUNTAIN MOSAIC m² 0 3 1.0
1000 FINAL CLEANING m² 0 300 1.0

Prepared by: Russel Carandang, RCE Page 3


Min.Req'd
Gv.men Hrs/unit
No.of men
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00

1 1 0.00
1 1 0.00
1 1 0.00
1 4 138.89
6 6 0.00
1 4 138.89

3 3 0.00
1 1 0.00
1 1 0.00
6 6 0.00
6 6 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
3 3 0.00

1 1 0.00
1 1 0.00

2 2 0.00
3 3 0.00
4 4 0.00

2 2 0.00
2 2 0.00

2 2 0.00
2 2 0.00

2 2 0.00
2 2 0.00

1 1 0.00
1 1 0.00
1 1 0.00

2 2 0.00
4 4 0.00
2 2 0.00
2 2 0.00
2 2 0.00
2 2 0.00
2 2 0.00
1 1 0.00
1 1 0.00

Prepared by: Russel Carandang, RCE Page 4


2 2 0.00
2 2 0.00
2 2 0.00
8 8 0.00
2 2 0.00
2 2 0.00
2 2 0.00
2 2 0.00
2 2 0.00
2 2 0.00

4 4 0.00
3 3 0.00
2 2 0.00
1 1 0.00
2 2 0.00
2 2 0.00

4 4 0.00
4 4 0.00
1 1 0.00
2 2 0.00
3 3 0.00
2 2 0.00
2 2 0.00

2 2 0.00
2 2 0.00
4 4 0.00

1 1 0.00
1 1 0.00

2 2 0.00
2 2 0.00
12 12 0.00
12 12 0.00

3 3 0.00
4 4 0.00
2 2 0.00
2 2 0.00
2 2 0.00
4 4 0.00
2 2 0.00
1 1 0.00

3 3 0.00
4 4 0.00
2 2 0.00
2 2 0.00

1 1 0.00
1 1 0.00

1 1 0.00
1 1 0.00
1 1 0.00

1 1 0.00
1 1 0.00

Prepared by: Russel Carandang, RCE Page 5


1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
0 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00

6 6 0.00
6 6 0.00
6 6 0.00
6 6 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
1 1 0.00
8 8 0.00

Prepared by: Russel Carandang, RCE Page 6

You might also like