You are on page 1of 3

HG Power Transmission Sdn. Bhd.

Client : Tenaga Nasional Berhad Date : 01/10/2018


Contract Title 500kV Double Circuit Transmission Line from PMU Bentong
South to PMU Lenggeng (Point L to LGNG) and 275kV Double
: Circuit Transmission Line from PMU Lenggeng to PMU Mahkota
Page : 1 Of 3
Cheras (Point L to Lenggeng)
Doc.
Contract No : TNB 369/2018 : MS-SI/01/REV1
No.
METHOD STATEMENT
Soil Investigation

Description
General Description

Soil investigation is best described as a means to go underground, determining the types of soil
strata (soil mechanics) at a particular point. The data collected will be platforms to determine the end
bearing capacity or the frictional strength of the soil at that particular point which will be translate to
the foundation design. The method use to check (test) the soil strata are as described below:

1.0 Work Plan

1.1. Tower locations are identified and the route angles verified. The foundation data is
confirmed.

1.2. Equipment is checked and verified adequate and reliable.

1.3. Permit, if required, is still valid

2.0 Setting Out

2.1 The center of the tower is identified by checking the back and front angel of the route.

2.2 The bisection of the tower Is calculated, and the tower legs are identified.

2.3 From the center of the tower and using the foundation data, the center of the foundation
Pits are marked

3.0 Test Procedure

3.1 The instrument is assembled and placed at the center of the pit.

3.2 The test is carried out as per the required specification.

3.3 The test is repeated at every foundation pit.

4.0 Mackintosh Probe (JKR Probe) Method

This method is done by striking the hammers of the probe against the metal rod attach to the
hammer. The striking blow count will be log at every 0.3m interval as the rod penetrates below
ground level. The test will be terminated once achieving 400 blows per 0.3m or when reaching a
maximum penetration of 10m below ground level. The soil strata and the underground water table
will be recorded throughout the test.
HG Power Transmission Sdn. Bhd.

Client : Tenaga Nasional Berhad Date : 01/10/2018


Contract Title 500kV Double Circuit Transmission Line from PMU Bentong
South to PMU Lenggeng (Point L to LGNG) and 275kV Double
: Circuit Transmission Line from PMU Lenggeng to PMU Mahkota
Page : 2 Of 3
Cheras (Point L to Lenggeng)
Doc.
Contract No : TNB 369/2018 : MS-SI/01/REV1
No.
METHOD STATEMENT
Soil Investigation

Photo: Example of Mackintosh Probe

5.0 Soil Penetration Test (SPT)

This method is to bore down below ground using a rotary wash boring machine which is mechanical
operated with a water pump attach, a metal pipe casing, a smaller pipes with drilling bits and taking
soil sample throughout the boring processes. Soil sample will be taken out of the bore hole in a 0.5m
metal tube at every 1.5m interval to determine the type of soil at that particular point. Sample are
collected by hammering a mechanism call the SPT hammer on hard ground condition and blow
count are recorded or using a thin metal tube press down on soft ground with the metal tube attach
at the end of the metal rod. Soil strata, underground table and soil samples are taken for analysis.

Photos: Example of SPT rotary wash boring machine

Equipment Use

 A rotary wash boring machine equip with and SPT hammer, diesel motor, metal casing, drilling
rods, drill bits and sampling tube.
 A high pressure water pump.
 Pipe wrench
 Pile clamp
 The height of the boring machine at static position will be at 4m and 5m height during operation

6.0 On Water Soil Investigation

The floating drilling platform is transported to site by using a mobile crane. Once its on the water, the
platform will move into the position driven by itself via self propelled or tug by a boat. Once the platform is
HG Power Transmission Sdn. Bhd.

Client : Tenaga Nasional Berhad Date : 01/10/2018


Contract Title 500kV Double Circuit Transmission Line from PMU Bentong
South to PMU Lenggeng (Point L to LGNG) and 275kV Double
: Circuit Transmission Line from PMU Lenggeng to PMU Mahkota
Page : 3 Of 3
Cheras (Point L to Lenggeng)
Doc.
Contract No : TNB 369/2018 : MS-SI/01/REV1
No.
METHOD STATEMENT
Soil Investigation

in position, the four anchor column is gradually lowered down to the sea/river bed and securely anchored.
The test rig is assembled on the working platform and the soil investigation is carried out as usual.

Photo: Example of on water SPT drilling platform