ENGINEERING, PROCUREMENT,
CONSTRUCTION AND COMMISSIONING (EPCC)
OF WATER COOLED HEAT EXCHANGERS INSTALLATION
AT GPP2, GPP3 & GPP4,
GAS PROCESSING KERTIH (GPK), TERENGGANU.
DOCUMENT TITLE:
INSPECTION & TEST PROCEDURE
DOCUMENT NO.:
DSE/PGB/HEX/QAQC/IP/026
SRA AY AFM
0 14/03/16 FOR
APPROVAL
1.0 INTRODUCTION
This procedure applicable for project, especially for erected and fabricated by DiPETRO Synergy
Sdn Bhd for Engineering Procurement Construction and Commissioning (EPCC) of Water Cooled
Heat Exchangers Installation at GPP2, GPP3 & GPP4, at Gas Processing Kerteh (GPK).
2.0 SCOPE
This procedure shall be applied to inspect the butterfly valves at Valmatic Engineering Sdn. Bhd.
in accordance with project specification.
3.0 DEFINITION
4.0 ATTACHMENT