Probability (P)
Severity (S)
Sub activity (Key Consequence Population at
Sr. No. Hazards involved in task
steps) (Ill health/ Injury/ Incident/ Emergency) risk
• Unskilled worker.
• Not Aware use of Personal protective • leads of person injury/property
1 Mobilization of equipment damage,slip ,trip , fall Hazards may leads All workers 2 2
manpower • lack of work knowledge of personal injury.
• lack of site safety rule.
Hydrostatic testis
1.. Ensure All fittings & Couplings are
2 pressure All workers 2 2
independing on 1.Pressure Build up & Loose fittings Properly tightened.2Ensure slow
requirement charge+D11
Depressurization a.Slipping hazard
poor housekeeping, improper illumination Slip, Trip, Fall hazard,Severe injury,
and ventilation,falling of
3 Material storage cause sprain.Fire hazard, personal injury All workers 2 2
material,flammable liquid and gases due to poor illumination.
storage,
• Incompetent person
• Personal injury by electrical shock
• Damage of material or other electrical
part
• Inadequate wiring. •Electrocution
• Misuse equipment or use electrical • Fire and explosion
equipment which they know to be faulty. • Personal injury due to lifting of
Installation of • incompetent person excessive weight of cabling work. Electrician and
4 electrical • Damage material or other electrical 2 3
• Property damage, helper
connection parts • personal injury due to electrical shock.
• improper grounding,
• burn injury,
• fire explosion,
• overloading of electricity cause fire,
• Improper grounding
• Lack of using PPE
• Loose cloths, gloves, jewellery, long
hair ,
• Breakage of wheel , • Loose cloth entanglement,
• Striking wheel,Flying Particles,Non • Fire and explosion
standards wheel Machine RPM(Rotation
Cutting Of pipe Per Minute) not matching with wheel RPM, •• Cut and Hit Injury, Fitter and
5 coat 2 3
body injury, helper
Excessive Noise ,Poor housekeeping, • eye injury.
• Nonstandard machine,
• Working near flammable or hazardous
material.
I• Fall of pipe
• Fire and Explosion,
• Flying of hot particles,Flying of hot
articles, , Absence of fire point, Working at
flammable area Fire and explosion,personal injury,Eye
6 Heating of pipe coa• Fail to use of PPE , Area is not clean fitter and helper 3 3
injury, .
enough to work,
• Improper use of oil burnol,
• oil leakage
• Damage of burnol torch.
Dust, Irritation to eyes and respiratory
system, stacking combustible materialsSlip, Slip ,trip and fall injusry,Respiratory
7 Housekeeping trip hazard,Failure to use PPE, Obstruction Deasease, All workers 2 2
of Emergency exit way due to poor Body Injury, and Fire.
housekeeping.
DATE:
Residual Risk
Existing Control Measure Additional control Measure
Risk level (R)=SxP
1. Supervisor in place at all the time.
1. person not allow at work site below 18 years of age. 2. Job safety Training for weekly
2. Gate pass will not be issued until safety training is conducted. conducted by safety representative along
3. All worker to be issued require PPE(Safety helmet, Safety shoes, with site supervisor.
Safety goggles, hand gloves). 3. All worker must be medically fit to
4. safety induction training conducted by Safety representative and work.
4. Do not allow to work without safety
site supervisor. inducted person.
5. Only authorized people are allowed to work on respective jobs.
Low 6. Ensure adequate and separate man movement access to be used 5. Daily tool box training to be conducted Low
by site supervisor along with safety
on site. representative.
7. Minimum two adequate accesses should be maintained at each
and every work location. 6. Restrict to work under high
temperature and Provision of breaks for
resting.
8. Specific visual control signage’s to be displayed at conspicuous 7. Drinking water close to the area where
location of site. worker are working .
1. Ensure All fittings & Couplings are Properly tightened.
1. Ensure Slow charge of testing medium.
1.3. While Charging the water makes sure there is no leaking.
1.4. Any modification or Retightening must be carried out only after
Low
depressurizing the system. Then rectify the Leak.
1.5. Ensure that the connections and line from the piping spool to
drain and air blown is properly fixed and secured
2.1. Ensure dry wet floor immediately to prevent slip and fall
hazards.
2.2. Spillage containment on standby in case of spillage emergency.
2.3.Sufficiant manpower to be provided for cleaning
1.1. Use personal protective equipment’s
to handling material.
2. Stacked area shall be proper
barricaded.
1) All fire extinguisher must be inspected and labelled to ensure that 1. Extinguisher must be inspected once
extinguisher are not out of date. in a monthly by safety representative .
2) All extinguisher must be fixed properly and there is no chance of 2. Extinguisher
fall hazards. should kept in near by hot work area.
3) Extinguisher must be regularly cleaned. 3. If defective condition of
4) Provision of information to the worker not to misuse extinguisher. extinguisher must be removed from site.
5) worker 4. Check daily safety pin
Low should aware of knowledge the operating procedure in case of fire and pressure gauge indicator. Low
emergency.
Action By
Site incharge and
Safety incharge
Site Incherge and
HSEO and store
incharge
Site incharge and
safety incharge
Site incharge
Site incharge and
Safety incharge
Site incharge and
Safety incharge
PROBABILITY (P)
PRREPARED BY:-
SAFETY INCHARGE:
MATRIX
Extreme Intolerable
APPROVED BY:-