Case Study Overview
Adopting an SD-WAN Enabled Network

Our case study is based on a manufacturing company with sites in the US, Canada, and Mexico. Initially the
company had a WAN made of mostly MPLS circuits and some static IPSEC VPN tunnels.

•  160 sites
•  17,000 employees
•  5,000 knowledge workers
•  US, Canada, Mexico
•  Cisco
•  Talari

2
Phase I
Solution for Key Sites

•  Phase I – The business unit needed additional WAN reliability at key locations.
•  Key Solution - Talari dual T-3000 head end and T-510 for remote sites across 19 locations
•  Technology – SD WAN using SSL “conduits” for dynamic path creation and routing

Business Needs How Talari Met the Need


•  Reliability Inline fail to wire behind WAN router
•  Bandwidth Bandwidth AggregaJon
•  Simple Installed in 15 minutes
•  Cost EffecJve IniJal cost apx. $3,500 per site
•  Easy OperaJons Average 1 support Jcket per year
•  Lifecycle In 7 years only 1 hardware failure

hSp://www.talari.com/

3
Phase I
Lessons Learned

MPLS
MPLS Internet
Internet

1.  Trust the solution

n t i n c
M e
s o k ork
of the ill
er s w ain

h e as
PLS
l o s l i n w
ov bnet cert
su n l y
2.  Do the research
P

O
O GE 0/0/0
E
S L

CISCO 4331
SE E MANUAL BEFORE RE MO VING SE E MANUAL BEFORE RE MO VING
E
S
N

S L
GE 0/0/1 GE 0/0/2
NIM 1 NIM 2 SM 1

Cisco 2921
Lacks dynamic failover;
3.  Keep it simple relies on static routing
at the datacenter core

4.  Pilot for success


Talari 510

5.  Training pays


Single Point
of Failure

Catalyst 3750 SERIES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

SYST 1X 15X 17X 31X 33X 47X 1 3


RPS
MASTR
STAT
DUPLX
SPEED
STACK 2 4

MODE 2X 16X 18X 32X 34X 48X

Cisco 2960
Catalyst 3750 SERIES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

SYST 1X 15X 17X 31X 33X 47X 1 3


RPS
MASTR
STAT
DUPLX
SPEED
STACK 2 4

MODE 2X 16X 18X 32X 34X 48X

Cisco 2960

4
Phase II
Solution for All Sites

•  Phase II – Hardware refresh (most WAN devices 7-9 years old), several teams were competing for budget (IOT, Voice,
WAN, Security, Wireless), and the need for point to multipoint to work. All sites need more reliability not just key sites
•  Key Solution – Cisco ASR 1001-X head end, and ISR 4331 for remote sites across 160 locations
•  Technology – SD WAN using Cisco iWAN

Business Needs How Cisco Met the Need


•  Reliability Able to use dual routers and mulJple circuits per router
•  Bandwidth Bandwidth AggregaJon
•  Simple Not really, requires senior engineer
•  Cost EffecJve IniJal cost apx. $8,000 a site, far less than mulJple devices
•  Easy OperaJons To Be Determined
•  Lifecycle Expected to last 7-10 years

Cisco’s soluJon
allows for mulJple
funcJons in the
same device
hSps://blogs.cisco.com/perspecJves/cisco-intelligent-wan-iwan
5
Cisco Intelligent WAN Solution Components

© 20136 Cisco and/or its affiliates. All rights reserved.

6
Network – Site Networking Models – Service Groups
Cost effective implementations

•  Site Type A – Full Diversity - No single point of failure to Site – Diverse circuits, redundant hardware
•  Site Type B – Partial Diversity – Diverse circuits, single hardware device
•  Site Type C – Not Diverse – This type is for small sites such as warehouses and temporary sites

Dual Internet Remote Site Network Topology Single Router MPLS-Internet Remote Site Network Topology

Internet
Internet Internet
Internet

MPLS
MPLS Internet
Internet

Redundancy Redundancy
logically Redundancy Redundancy
logically logically logically

P
S
P
O
E
GE 0/0/0
L

4331 Routers 4331 Router


CISCO 4331

O GE 0/0/0
E
S L SE E MANUAL BEFORE RE MO VING SE E MANUAL BEFORE RE MO VING
E
S
N
CISCO 4331

*Add iWAN
SE E MANUAL BEFORE RE MO VING SE E MANUAL BEFORE RE MO VING
E
S
N

*Add iWAN
S L
GE 0/0/1 GE 0/0/2
NIM 1 NIM 2 SM 1
S L
GE 0/0/1 GE 0/0/2
NIM 1 NIM 2 SM 1 P
O GE 0/0/0
E
S L

CISCO 4331
SE E MANUAL BEFORE RE MO VING SE E MANUAL BEFORE RE MO VING
E
S

**Single point of failure


N

S L
GE 0/0/1 GE 0/0/2
NIM 1 NIM 2 SM 1

hardware based
Redundancy
physical & logically
Redundancy
physical & logically

3650 L3 Switch 3650 L3 Switch


S TA T D U PL X S PE ED S TA C K P oE S TA T D U PL X S PE ED S TA C K P oE S TA T D U PL X S PE ED S TA C K P oE S TA T D U PL X S PE ED S TA C K P oE

S YS T ACTV CONSO LE S YS T ACTV CONSO LE S YS T ACTV CONSO LE S YS T ACTV CONSO LE


MO DE MO DE MO DE MO DE

Catalyst 3650 48 PoE+ 4X10G Catalyst 3650 48 PoE+ 4X10G Catalyst 3650 48 PoE+ 4X10G Catalyst 3650 48 PoE+ 4X10G

Redundancy Redundancy Redundancy Redundancy


physical & logically physical & logically
NonRedundant Remote Site Network Topology physical & logically physical & logically

SYST STAT SPEED RPS SYST STAT SPEED RPS


LAN BASE 10G UPLINK PoE+ 740W Catalyst 2960-X Series LAN BASE 10G UPLINK PoE+ 740W Catalyst 2960-X Series
MAST STACK CONSOLE MAST STACK CONSOLE

1 11 13 23 25 35 37 47 1 11 13 23 25 35 37 47

2 12 14 24 26 36 38 48 2 12 14 24 26 36 38 48

MGMT CONSOLE 49 SFP+ 50 MGMT CONSOLE 49 SFP+ 50

SYST STAT SPEED RPS SYST STAT SPEED RPS


LAN BASE 10G UPLINK PoE+ 740W Catalyst 2960-X Series LAN BASE 10G UPLINK PoE+ 740W Catalyst 2960-X Series
MAST STACK CONSOLE MAST STACK CONSOLE

1 11 13 23 25 35 37 47 1 11 13 23 25 35 37 47

2 12 14 24 26 36 38 48 2 12 14 24 26 36 38 48

MGMT CONSOLE 49 SFP+ 50 MGMT CONSOLE 49 SFP+ 50

2960-X L2 Switch 2960-X L2 Switch


*needs to support NAC *needs to support NAC

MPLS
MPLS

P
O GE 0/0/0
E
S L
CISCO 4331

SE E MANUAL BEFORE RE MO VING SE E MANUAL BEFORE RE MO VING


E
S
N

S L
GE 0/0/1 GE 0/0/2
NIM 1 NIM 2 SM 1

Catalyst 3750 SERIES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

SYST 1X 15X 17X 31X 33X 47X 1 3


RPS
MASTR
STAT
DUPLX
SPEED
STACK 2 4

MODE 2X 16X 18X 32X 34X 48X

Catalyst 3750 SERIES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

SYST 1X 15X 17X 31X 33X 47X 1 3


RPS
MASTR
STAT
DUPLX
SPEED
STACK 2 4

MODE 2X 16X 18X 32X 34X 48X

7
iWAN Pilot – Site 1
Benefits:
iWAN •  Network circuit diversity and
Core redundancy
Switch
30mbps
30mpbs
•  Hardware redundancy
iWAN
•  Supports up to 100mbps encrypted
Core
•  Cost savings over MPLS (aaer pilot)
MPLS
Switch •  Local Internet Path
•  Site to site video (iWAN sites)
Internet
•  Shop Floor Isolated Network
MPLS Headquarters •  Upgrade to Voice Gateway
•  Replace the old router, end of
34mbps
support 10/31/16
MPLS •  Replace the Talari which supports
iWAN iWAN only 40mbps

IP IP
Switch Switch
Provider Bandwidth Monthly InstallaJon
Current Provider C 34mbps $11,917.00 n/a Current Monthly $12,772
Remote Site Current Provider A 6mbps $855.00 n/a New Monthly $6,961

New Provider A 30mbps $1,900.52 $0.00 Projected Savings $5,811


New Provider B 30mbps $1,397.79 $0.00

8
Case Study
Lessons Learned

1.  Trust the solution

2.  Do the research

3.  Keep it simple

4.  Pilot for success

5.  Training pays