Customer : ABU QIR PETROLEUM

Job Number : 2017 /XE/171/01

Rotating Equipment Inspection Report Page 1 of 3

1 - Reference Section

Inspector Name Hazem Mohamed Azzam Report n° R.S.E/FR/003


Date of inspection: 20/11/2017 Next planned visit

Owner ABU QIR Petroleum Sub-vendor: NA

Place of inspection West AQ .Platform / Offshore


Equipment
Description
Offshore Rotating Equipment
Result of activities: S satisfactory – P – pending – N non conform Type of inspection PIM :pre-inspection meeting, A: audit, I: intermediate: FA final account, FB final balance

Item Tested materials, components or activities description activities Results


equipment code
1 See Below
Visual inspection W S

code: W: witness, R review, M monitoring Results S= Satisfactory P= Pending N = Non-Conforms

2 - Documents Section

Applicable codes, standards, drawings, specs


Document number Rev.number Title

3 - Content Section

3.1 Activities carried out

 Visual inspection.

RI/F/15 R1 17.10.2011
Customer : ABU QIR PETROLEUM

Job Number : 2017 /XE/171/01

Rotating Equipment Inspection Report Page 2 of 3

3.2 Result of activities - Observations & reservations -

Visual inspection carried out for the following critical rotating equipment and the status as general is
in accepted condition as following:

1. Equipment X-703-P3A /X-703-P3B

- Visual inspection has been and found in accepted condition with some rust
and painting flakes .
- Skid found rusted.

RI/F/15 R1 17.10.2011
Customer : ABU QIR PETROLEUM

Job Number : 2017 /XE/171/01

Rotating Equipment Inspection Report Page 3 of 3

2. Equipment X-701-K1B /X-701-K1A

- Visual inspection has been done for this equipment and found in accepted
condition with some rust and painting flakes.
- Skid found rusted.

 Recommendation
- Painting by suitable painting system is required for rusted areas .

Inspected by Reviewed by RINA Egypt Energy


Hazem Mohamed Azzam Moemen Nour El dien
Energy Hub Manager

RI/F/15 R1 17.10.2011