‘TransCanada
700 Louisiana. Sute 700
aaa Team @) transcanada
RECEIVED
October 12,2018 OCT 15 2018 PAID
Water Management Board a ates
Department of Environment and Natural Resour “saSgwalt OCT 15 2018
Water Rights Program
523 East Capit. Ave Ck#52(00021a
Pierre, SD 57501-3182
‘Subject: Keystone XL Pipeline, Application For Permit To Appropriate Water Within The State Of South Dakota [Form
‘No. 1585LD V5}, Cheyenne River.
Dear Water Management Board,
‘TransCanada Keystone Pipeline, LP. (Keystone) is planning to construct and operate a crude cil pipeline and related facilities
from Hardisty, Alberta, Canada, to Stoole City, Nobraska. The langth ofthe Project is approximately 881.8 mills from the
Canada/U.S. border to Stoole City in Jefferson County, Nebraska. In addition to the pipeline, Keystone will construct permanent
‘aboveground facilities, including pump stations and their associated permanent access roads, and mainline valves.
Keystone respectively submits the attached application for water permit for non-irigation uses for the Keystone XL Pipeline
Project. This permit application is requesting to appropriate water from the Cheyenne River in Meade County, South Dakota and.
includes the following:
‘+ Application for Permit to Appropriate Water Within the State Of South Dakota
‘+ Project Description and map
Typical Drawing-Typical Water Diversion Drawing Pipeline
‘Typical Drawing-Typical Water Diversion Drawing Truck
Pump Curve Drawings
‘Wap Book:
Keystone appreciates your review ofthis application package. Please do not hesitate to contact me at 713-231-2376 or
gayle_konik@transcanada.com or John Auriemma at 713-439-3642 or john. auriemma@exp.com If there are any questions or
you would ike additional information on the proposed application for permit to appropriate water within the state of South
Dakota.
Sincerely,
Manager, Environmental U.S.
TransCanada Keystone Pipeline, LP
KXL1999-EXP-RE-PE-0004SDEForm- 1585LD V5
FORM 2: Application for uses other than irrigation
tracer
Mae omaray
ae No. Hydrologic Unit RECEIVED
DENR- Water RGM | pyin oct 15 208
SBE Copia ve HaHa tHE EOE
Pierre, SD 57501-3182 ‘Newspaper WATER RIGHTS:
ph. (605) 773-3352 BEE SE eee ee eee ee eee ee eee eee eee ee
Application For Permit To Appropriate Water Within The State Of South Dakota
Check use(s) of water:
Municipal Water Distribution System Recreational Institutional
[Rural Water System Commercial Fish & Wildlife |Geothermal
|Domestic (over 18 gpm) Industrial BX] Other Pipeline Construction
‘Type of Application: X]New Vested Right (se predsies Mar2. 1955) Future Use Reservation
(cheek one) Place to Beneficial Use Water Reserved by Future Use Permit No.
/Amendment/Correction to Permit No. _
Description of amendmenticorrection: «ic. change diversion point(s). sdl diversion points, change use ete.)
L. Name to Appear on Water Permit TransCanada Keystone Pipeline, L.P. (Keystone)
Mailing Address 700 Louisiana Street, Suite 700 Houston. 1x__77002
Aes) Cm Sm apc
Phone 713-091-2376 Mobile Email gayle konik@uanscarada com
2. Amount of water claimed *CFS or 3000 **GPMand 238.21 ***AF or Gallons
Flow mte and volume are both equiced” Pai Fet per Soon)” ("lions per Minute) (7 *°AGS TR - storage capaci ST EARTout or annul ws}
3. Source of water supply Cheyenne River
4. Location of point of diversion SW1/4 section 001-TOO6N-RO17E_ ___County Meade
‘exanple- 5 well SWI NET secon I-TIBIRSIW
If not a public water supply (e.g. municipal), will water be used outside of the area described above? Jes CJNo
If "Yes," where will water be used? see attachment
aie NWT TTBS)
5. County or counties where water will be used see attachment
‘6. Annual period during which water is to be used _January-December
7. Give a description of the project. When available include any preliminary engineering report or other reports or
information that will help explain the project. (Attach sheet if more space is needed)
See attachment
1, Gayle Konik Environmental Manager, US, the applicant, certify under
‘ae of eon Ti iappliabey
penalty of perjury that I have read this application, examined the attached map, and thatthe matters stated are true. I further certify, if
acting on behalf of an entity oF individual other than myself, that I am authorized to submit this application
2os-10 (Attachments: Attach Form 2A if diversion is from a well or dugout, or if storage of water is proposed. Also, attach
|map and any other echnical information. (see instructions)TransCanada Keystone Pipeline, L?.
Keystone XL Pipeline Project
Cheyenne River - South Dakota
South Dakota Department of Environmental & Natural Resources
Application For Permit To Appropriate Water Within The State Of South Dakota - Form 1585LD VS
4. Yes, water will be used outside of the area described in section 4; line 1.
Water will be used for dust control (DC) along the project right-of-way [ROW]; (ROW is composed of
permanent easement and additional temporary workspace) from approximate MP 286 to approximate
MP 601 (see map book sheet numbers 1-158)
Water will be used for Horizontal
tional Drilling (HDD) operations at the following locations:
SE1/4 $001-TOOGN-RO17E, S012-TOO6N-RO27E (see map book sheet number 73)
NE1/4 S012-TODEN-RO17E, 007-TOOSN-RO18E (see map book sheet number 74)
NW1/4 5016-TOOGN-RO18E, $017-T006-RO18E, $015-TOOBN-RO18E (see map book sheet number 75)
Water will be used for pump station (PS) construction at the following locations:
NW1/4 5025-T017N-ROO6E (see map book sheet number 27)
‘SW1/4 $022-TO11N-RO13E (see map book sheet number 54)
SE1/4 $022-TOOSN-RO1SE (see map book sheet number 80}
Water will be used for Hydrotest at the following location:
NE1/4 S024-TO15N-ROOBE (see map book sheet number 35)
NE1/4 S017-TOOGN-RO18E (see map book sheet number 74)