JOB HAZARD ANALYSIS (JHA) ANALYSIS WORK SHEET
JHA Serial
Number
Job Title : VERIFICATION DIG UP AT RGT LATERAL FOR SEREMBAN RO – FIBER OPTIC ALIGNMENT
Working Area : RGT LATERAL KP 3 / BEHIND SOIL DUMPING AREA
Description:
FIBER OPTIC ALIGNMENT VERIFICATION WORKS
Who or What
Initial Final
Step Potential Hazards & might be Control and/or Recovery Action/Responsible
Description of Step/Task Risk Risk
No. Consequences harmed Measures (Person (s)
Rating Rating
(PEAR)
1.0 Mobilization and demobilization 1.1.1 To follow speed limit of
(L) (L)
of manpower and equipment 1.1 Road Accident MRCSB at all area Ingress Authorized
People B3 B1
such as shovel, probe, hoe and (Process) 40km/hr Personnel
etc. (Jetty) 25km/hr/
1.1.2 Identify the specific
(L) route to be used during (L)
People Ingress supervisor
B2 loading of materials. B1
AA’s initial
Who or What
Initial Final
Step Potential Hazards & might be Control and/or Recovery Action/Responsible
Description of Step/Task Risk Risk
No. Consequences harmed Measures (Person (s)
Rating Rating
(PEAR)
1.2.4 No usage of defective
(L)
(L) equipment. Tools must
Asset B1 Ingress supervisor
B2 be inspected prior to
start work.
(L) 1.2.5 Secure equipment with (L)
Asset sling Ingress supervisor
B2 B1
1.2.6 Do not overload
(L) materials while (L)
Asset Ingress supervisor
B2 transporting B1
AA’s initial
Who or What
Initial Final
Step Potential Hazards & might be Control and/or Recovery Action/Responsible
Description of Step/Task Risk Risk
No. Consequences harmed Measures (Person (s)
Rating Rating
(PEAR)
5.0 Excavation using JCB/Backhoe 5.1 Struck by falling 5.1.1 Operator maintains
(L) (L)
and Manual object and rod People clear view of working Ingress Supervisor
C2 A2
area.
5.1.2 Daily inspection on
(L) lifting hook and latch. (L)
People Ingress Supervisor
C2 Safety latch must in A2
good condition.
5.2 Excavation hit 5.2.1 Obtain valid excavation
(M) (L)
underground Asset certificate Ingress Supervisor
facility C3 B2
5.2.2 Prior to Excavation,
(M) ensure pilot hole are (L)
Asset Ingress supervisor
C3 done first by manual B2
digging
5.3 Injury to worker 5.3.1 Mandatory PPE to be
by rotating (L) worn at all times during (L)
People B2
Ingress Supervisor
C2
equipment work
5.3.2 Keep hands and foot
(L) away from running parts (L)
People B2
Ingress Supervisor
C2
5.3.3 Install protective cover
(L) (L)
People over running parts Ingress Supervisor
C2 B2
AA’s initial
Who or What
Initial Final
Step Potential Hazards & might be Control and/or Recovery Action/Responsible
Description of Step/Task Risk Risk
No. Consequences harmed Measures (Person (s)
Rating Rating
(PEAR)
5.6.2 Ask for assist (buddy (L)
(L)
People system) when lifting B1
B2 Ingress Supervisor
heavy tools / casing
5.7.1 Stop work during rain
(L) (L)
People and lightning strike. Ingress Supervisor
B3 B2
5.7.2 Get worker moved to
5.7 Bad weather (L) building during rain and (L)
People Ingress Supervisor
condition B3 B2
lightning strike.
5.7.3 Use whistle for
(L) emergency calling. (L)
People Ingress Supervisor
B3 B2
5.8 Biological hazard 5.7.4 Check surrounding pior
(M) (L)
People start work Ingress Supervisor
C3 B2
5.7.5 No night work allowed
M) (L)
People Ingress Supervisor
C3 B2
5.7.6 Call FSRO for any
M) (L)
People abnormalities Ingress Supervisor
C3 B2
4.0 Backfilling using 4.1 Sharp object 4.1.1 Mind the sharp object
(L) (L)
excavator/backhoe People and wear proper PPE Work leader
B3 B2
4.1.2 Do backfill once the
(L) (L)
People work is completely Work Leader
B3 B2
completed.
4.1.3 Backfilling done with
(L) supervision from WL. (L)
Asset Work leader
B3 B2
AA’s initial
Who or What
Initial Final
Step Potential Hazards & might be Control and/or Recovery Action/Responsible
Description of Step/Task Risk Risk
No. Consequences harmed Measures (Person (s)
Rating Rating
(PEAR)
4.4 Soil Engulfment 4.1.4 Keep good visual on the
(M) surrounding soil during (L)
People backfill Work leader
C3 B2
5.0 Housekeeping 5.1 Trip slip and fall . (L) 5.1.3 Do housekeeping daily. (L)
People Work leader
B2 B1
5.1.4 Do not leave any
(L) unused material at work (L)
People Work leader
C2 area. B2
AA’s initial
Date 31 JAN 2019
JOB HAZARD ANALYSIS (JHA) Briefing Form
JHA Serial
Number
Job Title : VERIFICATION DIG UP AT RGT LATERAL FOR SEREMBAN RO – FIBER OPTIC ALIGNMENT
Working Area : RGT LATERAL KP 3
Following subject matter of JHA has been briefed by Site Supervisor/Work Leader to all members/workers of the job execution team
AA’s initial
AA’s initial