MiIKTMV Hnutes o7TKMVGf meeting

Discussing abfdgdfb

(3) Calculation shefdggggggggggget an7KTMd drawings of weir were

discussed, and get the conclusion after discussing with that the stilling

basin should also be calculated and give desiglkjrhtn of reinforcement,

and after excavation, if rock SJNR4 is good, this cafdbbbbn be delete, it

ilius determined on site. Designers should moKTM Vdify drawings to get

apprhtedzhtdzfshbove.

(4) Calculfdfdfdfdfdfdfdation model of fhauxiliary powerhouse and

drawings of columnsV , walls and foun7JYNT Vdation were

dishbdffffffffffffffcussed. And designers should 7TJNmodify drawings to

get approve.

(5)Calculation of model of pow;ll.knerhouse was discussed.

D7YTJNesigner should modify thIUJNe model and the calculation sheet

to get approve.

The dra JNYGwings can be divided into.,JN m., 2 parts, but calculation

sheet should be only one for easy rebfdbfdbfdbfdbfdbfdbfdbfdbfdview.

And the agreoement > iul25MPa. ouiUJN l should also be mentioned in

drawings.iul

(6)Calculation sheet and drawings of sJNG urge tank, vertical shaft and

inclined shaft were discJN ussed, e/.,/.,mail. dhf should modify drawings

to get approve.
(7)Drawings of penstock, anchor block and bhfddgdvcfgnryn is discussed,

and designer should moUJHN dify drawings together UHJNwith