You are on page 1of 19

`

SUBMISSION OF FORM – I & IA


TOWARDS GETTING PRIOR
ENVIRONMENTAL CLEARANCE (EC)

For

M/s. UMA ESTATES AND PROJECTS Pvt. Ltd.


(Residential Apartment Construction Project)
Sy.No. 230 & 231 A
Chinakakani Village, Mangalagiri Mandal, Guntur District,
Andhra Pradesh

Submitted to

STATE ENVIRONMETNAL IMPACT ASSESSMENT AUTHORITY (SEIAA)


O/o. AP POLLUTION CONTROL BOARD, HYDERABAD.

Prepared & Submitted by

Enviro House, Block –B, B-1, IDA, Auto Nagar, Visakhapatnam – 530 012
Ph: 0891-2755528, Telex: 0891-275559, E-mail: svenviro_labs@yahoo.co.in
B.O:2-53, Mahipala St., Yanam-533464, Ph: 0884-2321528, Cell: 9440338628
QCI No – 157 & Recognized by MOE&F, New Delhi.
FORM 1

(I) Basic Information


Sl.No. Item Details
1. Name of the project(s) M/s. Uma estates & projects pvt. Ltd
Sy.No. 230 & 231A
Chinakakani Village, Mangalagiri Mandal,
Guntur District, Andhra Pradesh.
2. S.No. in the schedule 8 (a)
3. Proposed capacity/area/length/tonnage to be Construction of Residential project in an
handled/command area/lease area/number of
area of 12142 Sq. Mts (3.0 Ac.)
wells to be drilled.
Total Built-up area is 69,533.7 Sq. mts
4. New/Expansion/Modernization New
5. Existing Capacity/Area etc. NIL
6. Category of Project i.e. ‘A’ or ‘B’ Category – B
7. Does it attract the general condition? If yes, No
please specify.
8. Does it attract the specific condition? If yes, No
please specify.
9. Location
Plot/ Survey/ Khasra No. Sy.No. 230 & 231 A
Village Chinakakani village,

Tehsil Mangalagiri Mandal,

District Guntur District,

State Andhra Pradesh.

10. Nearest Railway Station/Airport along with distance Mangalariri Railway station at 3.06 km/
in kms. Ganavaram Airport at 28.6 kms

11. Nearest Town, City, District Headquarters along with Mangalagiri at 3.0 Km
distance in kms.
12. Village Panchayats, Zilla Parishad, Municipal Chinnakakani Village
Corporation, Local body (complete postal addresses
with telephone nos. to be given)
13. Name of the applicant GUNAPATI SRIDHAR REDDY,
PROJECT PROPONENT
SEELAPU SATYANARAYANA REDDY
Director- Technical
M/s. Uma Estates & Projects Pvt. Ltd
14. Registered Address 8-2-703/A/6/B, Road No-12, Banjara Hills,
Hyderabad- 500034
15. Address for correspondence:
Name Gunapati Sridhar Reddy (Project
Designation (Owner/Partner /CEO) Proponent)
Pin code Mr. S. Satya Narayana Reddy
E-mail Director -Technical
500034
Telephone No. Umaestatesandprojectspvtltd@gmail.com
Fax No. 7675854318
--
16. Details of Alternative Sites examined, if any. Village-District-State
Location of these sites should be shown on a topo Not Examined
sheet.
17. Interlinked Projects Nil
18. Whether separate application of interlinked NA
project has been submitted?
19. If yes, date of submission NA
20. If no, reason NA
21. Whether the proposal involves approval/clearance
under: if yes, details of the same and their status
to be given.
NA
i. The Forest (Conservation) Act, 1980?
NA
ii. The Wildlife (Protection) Act, 1972?
NA
iii. The C.R.Z. Notification, 1991?
22. Whether there is any Government Order/Policy Nil
relevant /relating to the site?
23. Forest land involved (hectares) Nil
24. Whether there is any litigation pending against
the project and/or land in which the project is
propose to be set up? Nil
a) Name of the Court
b) Case No.
c) Orders/directions of the Court, if any and
its relevance with the proposed project.
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which
will cause physical changes in the locality (topography, land use, changes in water
bodies, etc.)
S.No. Information/Checklist confirmation Details thereof (with approximate
quantities /rates, wherever possible)
Yes/No
with source of information data
1.1 Permanent or temporary change in Yes The land earmarked for Construction of
land use, land cover or topography Residential Building project with an site
including increase in intensity of land area of about 12142 Sq. Mts (3.0 Ac.)
use (with respect to local land use and the total built up area is 695337
plan) Sq.mts area. This land is sufficient for
construction of Residential and
associated other utilities.
Therefore no change in land use / land
cover / topography.
1.2 Clearance of existing land, vegetation No The land is barren and developed land.
and buildings? No vegetation or building existing in this
land for clearance.
1.3 Creation of new land uses? No No extra new land will be used. The
project is having 12142 Sq. Mtrs of land
and the total built up area is
130610.065Sq.mts. In this land only the
proposed project will be constructed.
1.4 Pre-Construction investigations e.g. No For the total area of 12142 Sq.Mtrs
bore houses, soil testing? already ground water and soil testing
carried.
1.5 Construction works? Yes Structures comprises of two, three & four
bed room flats, water storage tanks, DG
Set room, Sewage Treatment Plant, etc.
The main components of the civil works
for the proposed plant include the
construction of bed rooms, foundations
and structures, Sewage Treatment Plant,
etc.
1.6 Demolition works? No The site is leveled one and not contains
any temporary / permanent structures.
Therefore no demolition work will be
carried.
1.7 Temporary sites used for construction No Local manpower will be utilized for the
works Or housing of construction construction work. Therefore no
workers? temporary site used for construction
works.
1.8 Above ground buildings, structures or Yes BUILDINGS
earthworks including linear structures,
 Residential & Amenities Building
cut and fill or excavations  Sewage Treatment Plant
 Water Storage Tank
 DG Set Room
1.9 Underground works including mining No No mining or tunneling activity.
or tunneling?
1.10 Reclamation works? No No reclamation work

1.11 Dredging? No Not applicable

1.12 Offshore structures? No Not applicable


1.13 Production and manufacturing No --
processes?
1.14 Facilities for storage of goods or Yes Cement storage
materials? Building materials storage
1.15 Facilities for treatment or disposal of Yes Liquid effluents
The waste water generated from the
solid waste or liquid effluents?
proposed project will be in the form of
sanitary waste water only and which will
be routed to sewage treatment plant and
thereby reuse and for firefighting if
surplus to local municipal sewerage
network.
Solid waste
 Municipal waste– 806 kg/day
DISPOSAL:
Disposed to local panchayat dumping site
1.16 Facilities for long term housing of No Majority of manpower will be recruited
operational workers? from local people only. Therefore no
housing scheme proposed.
1.17 New road, rail or sea traffic during No The site is well connected to roadway.
Construction or operation? No new road, rail or sea traffic required.
1.18 New road, rail, air waterborne or other No Not applicable.
transport infrastructure including new
or altered routes and stations, ports,
airports etc?
1.19 Closure or diversion of existing No No transport routes will be changed.
transport routes or infrastructure
leading to changes in traffic
movements?
1.20 New or diverted transmission lines or No Not required to divert transmission lines /
pipelines? pipelines.
1.21 Impoundment, damming, culverting, No Not applicable
realignment or other changes to the
hydrology of watercourses or
aquifers?
1.22 Stream crossings? No No stream crossings are required.
1.23 Abstraction or transfers of water form Yes Ground water from the existing bore well
ground or surface waters? will be used to meet the water
requirements and water of 213.0KLD for
drinking purpose.
1.24 Changes in water bodies or the land No No change in water bodies and no
surface affecting drainage or run-off?
changes occur in drainage pattern. As the
proposed unit is Construction of
Apartments it does not emit any process
effluent.
1.25 Transport of personnel or materials Yes During construction activity, private
for construction, operation or tippers will be used for supply of metal,
decommissioning? sand, cement and iron.
1.26 Long-term dismantling or No No dismantling work will be carried in
decommissioning or restoration the project.
works?
1.27 Ongoing activity during No No decommissioning activity proposed.
decommissioning which could have
an impact on the environment?
1.28 Influx of people to an area in either Yes There would be a marginal influx of
temporarily or permanently? people since the apartment consists of
residing flats.
1.29 Introduction of alien species? No --
1.30 Loss of native species or genetic No No native species will be destroyed. As
diversity? the proposed project will be constructed
in barren land. Therefore no chance of
loss of native species or generic diversity
occurs.
1.31 Any other actions? Yes The housing project proposed to develop
green belt all along the all sides of
boundary wall.

2. Use of Natural resources for construction or operation of the Project (such as


land, water, materials or energy, especially any resources which are non-
renewable or in short supply):

Details thereof (with approximate


S.No. Information/Checklist confirmation Yes/No quantities / rates, wherever possible)
with source of information data
2.1 Land especially undeveloped or No The present status of land is barren and
agricultural land (ha) non-agricultural.
2.2 Water (expected source & competing Yes During construction
users) unit: KLD Domestic & construction - 100 m3/day

During operation
Domestic – 213.0 m3/day

2.3 Minerals (MT) No Not applicable


2.4 Construction material – stone, Yes Stone aggregates, Sand
aggregates, sand / soil (expected
source – MT)
2.5 Forests and timber (source – MT) Yes The timber that is required is procured
from the approved local contractors.
2.6 Energy including electricity and fuels Yes Electricity will be supplied by Southern
(source, competing users) Unit: fuel Power Distribution Company Limited.
(MT), energy (MW) Diesel for DG Sets – 100 Litres/Day
2.7 Any other natural resources (use No No other natural sources other than the
appropriate standard units) above mentioned will be used.
3. Use, storage, transport, handling or production of substances or materials,
which could be harmful to human health or the environment or raise concerns
about actual or perceived risks to human health.

Details thereof (with approximate


S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible)
with source of information data
3.1 Use of substances or materials, which No There are no materials that are being
are hazardous (as per MSIHC rules) to utilized in the construction programme
human health or the environment which endanger human health or water
(flora, fauna, and water supplies) supply.
3.2 Changes in occurrence of disease or No There is no possibility for occurrence of
affect disease vectors (e.g. insect or disease vectors as there are no water
water borne diseases) 3.3 Affect the bodies or stagnant water.
welfare of people e.g. by changing Note: as per the studies / literature
living conditions? available, no such diseases were occurred
from similar type of units.
3.3 Affect the welfare of people e.g., by Yes Living conditions will escalate therefore
changing living conditions? welfare of the people will be on positive
side.
3.4 Vulnerable groups of people who No --
could be affected by the project e.g.
hospital patients, children, the elderly
etc.,
3.5 Any other causes? -- --
4. Production of solid wastes during construction or operation or commissioning (MT/month)

S.No. Information/Checklist confirmation Yes/No Details thereof (with approximate


quantities /rates, wherever possible)
with source of information data
4.1 Spoil, overburden or mine wastes No --
4.2 Municipal waste (domestic and or Yes Municipal solid waste – 806 kg/day
commercial wastes)
STP Sludge – 8 Kgs/day
Used Batteries – 04Nos.
Used Oil – 100 LPA
Disposal: Garbage to the Local
municipal dumping yard
4.3 Hazardous wastes (as per Hazardous No There will not be any hazardous waste
Waste Management Rules) generation.
4.4 Other industrial process wastes No Since it is construction project, no
process/industrial activity involved.
4.5 Surplus product No Not applicable.
4.6 Sewage sludge or other sludge from Yes Sludge (8.0 kgs/day) generated from
effluent treatment
sewage treatment plant will be disposed
locally as manure.
4.7 Construction or demolition wastes No There is no demolition and as such the
construction debris does not arise.
4.8 Redundant machinery or equipment No No redundant machinery would be
available for disposal.
4.9 Contaminated soils or other materials No No soil / material will be contaminated.
4.10 Agricultural wastes No No agricultural waste will be generated.
4.11 Other solid wastes No Not applicable.
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S.No. Details thereof (with approximate
quantities /rates, wherever possible)
Information/Checklist confirmation Yes/No
with source of information data
5.1 Emissions from combustion of fossil No It is proposed to Construct Residential
fuels from stationary or mobile Apartments and does not involve any
sources manufacturing process.
5.2 Emissions from production processes No This is not manufacturing facility
5.3 Emissions from materials handling Yes The transportation of construction
including storage or transport materials will be taken with due care to
safeguard against dust emissions by
coverage as well as by sprinkling water
during construction phase.
5.4 Emissions from construction activities Yes The only emission from construction
including plant and equipment activities is of concrete miller. It will
run on HSD.
Remaining all the equipment like
vibrator, etc, will operates on power.
5.5 Dust or odours from handling of Yes Dust will arise from construction
materials including construction materials. Proper care will be taken
materials, sewage and waste during handling of material. During
unloading of metal, water will be
sprayed.
Hence, no fugitive emissions will be
released.
5.6 Emissions from incineration of waste No No incinerator proposed.

5.7 Emissions from burning of waste in No No open air burning.


open air (e.g. slash materials,
construction debris)
5.8 Emissions from any other sources No Nil
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
Details thereof (with approximate
S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible)
with source of information data
6.1 From operation of equipment e.g. Yes The DG sets will be established with
engines, ventilation plant, crushers silencers and the buildings are also
being constructed with noise absorbing
materials. DG set will be operated only
during power interruption and as a stand
by unit in emergency. No crushers or
ventilators are proposed.
6.2 From industrial or similar processes No It is proposed to Construct Residential
Apartments and does not involve any
manufacturing process.
6.3 From construction or demolition No There is no demolition is proposed in
the complex and is no possibility of
noise development.
6.4 From blasting or piling No No blasting or piling operation required.
6.5 From construction or operational No --
traffic
6.6 From lighting or cooling systems Yes The lighting and cooling systems are
designed as per the notification of the
National Building code.
6.7 From any other sources No Not applicable.
7. Risks of contamination of land or water from releases of pollutants into the ground or
into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate


S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible)
with source of information data
7.1 From handling, storage, use or No No hazardous materials will be stored.
spillage of hazardous materials
7.2 From discharge of sewage or other Yes The domestic wastewater will be routed
effluents to water or the land to sewage treatment plant.
(expected mode and place of
discharge)
7.3 By deposition of pollutants emitted to No No deposition of pollutant emitted to air
air into the land or into water into the land or into water is envisaged.
7.4 From any other sources? No Nil
7.5 Is there a risk of long term build up of No No pollutants will be built up in the
pollutants in the environment from environment. Therefore no risk from any
these sources? source.
8. Risk of accidents during construction or operation of the Project, which could
affect human health or the environment
Details thereof (with approximate
S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible)
with source of information data
8.1 From explosions, spillages, fires etc No No hazardous substance will be stored.
from storage, handling, use or Small quantity of HSD will be stored in
production of hazardous substances the site for running the DG/concrete
mixer during construction. The HSD
will be stored in a secured place.
8.2 From any other causes No ----
8.3 Could the project be affected by Yes The project designed under earthquake
natural disasters causing resistance and other NBC design
environmental damage (e.g. floods, practices followed for construction
earthquakes, landslides, cloudburst activity.
etc)
9. Factors which should be considered (such as consequential development)
which could lead to environmental effects or the potential for cumulative impacts
with other existing or planned activities in the locality
Details thereof (with approximate
S.No. Information/Checklist confirmation Yes/No quantities /rates, wherever possible)
with source of information data
9.1 Lead to development of supporting No No supply or ancillary units required for
utilities, ancillary development or this project. The required material will
development stimulated by the project be purchased directly from vendors.
which could have impact on the
environment e.g.:
• Supporting infrastructure (roads,
power supply, Waste or waste water
treatment, etc.)
• Housing development
• Extractive industries
• Supply industries
• Other
9.2 Lead to after-use of the site, which No No impact will occur.
could have an impact on the (Based on literature / standby of existing
environment plants)
9.3 Set a precedent for later developments No No such cases.
9.4 Have cumulative effects due to No No cumulative effects will occur.
proximity to other existing or planned
projects with similar effects
(III) Environmental Sensitivity
Name/ Aerial distance (within 15 km.)
S.No. Area Identity Proposed project location boundary
1 Areas protected under international No None within 15 km Aerial distance from
conventions, national or local proposed plant site.
legislation for their ecological,
landscape, cultural or other related
value
2 Areas which are important or sensitive Yes Krishna River at 11.4 Kms
for ecological reasons - Wetlands,
watercourses or other water bodies,
coastal zone, biospheres, mountains,
forests
3 Areas used by protected, important or No None within 15 km Aerial distance from
sensitive species of flora or fauna for proposed plant site.
breeding, nesting, foraging, resting,
over wintering, migration
4 Inland, coastal, marine or underground No None with in 15 km Radius
waters
5 State, National boundaries No None within 10kms radius
6 Routes or facilities used by the public No None with in 15 km radius
for access to recreation or other
tourist, pilgrim areas
7 Defense installations Yes None within 15 km Aerial distance from
proposed plant site.
8 Densely populated or built-up area Yes Mangaligiri town at 3.0 km
9 Areas occupied by sensitive man- Yes NRI Medical College & Hospital at 0.l
made land uses km
(Hospitals, schools, places of worship,
community facilities)
10 Areas containing important, high No None within 15 km aerial distance from
quality or scarce resources proposed plant site.
(Ground water resources, surface
resources, forestry, agriculture,
fisheries, tourism, minerals)
11 Areas already subjected to pollution or No None within 15 km aerial distance from
environmental damage. proposed plant site.
(Those where existing legal
environmental standards are
exceeded)
12 Areas susceptible to natural hazard No The areas are not susceptible to natural
which could cause the project to hazards (data available from past
present environmental problems records)
(Earthquakes, subsidence, landslides,
erosion, flooding for extreme or
adverse climatic conditions)