By A S Gupta DGM(OPN) , NTPC SSTPS – 17.12.2018

SNo Aspect /Norm of the Present FY 2014-19 Proposed FY 2019-24


Regulation
1 New Emission Control --- Shall be added to Capital Cost – Shall be
Equipment - Capex Allowed Separately
2 Tariff Components A) RoE -15.5% , A) RoE Kept Same at 15.5%, But No
Additional ROE of 0.5% additional ROE for timely COD
for timely COD B) Availability during Peak / Off Peak
B) Annual Cap Hours of the Day Differentiated.
Charge(FC) -Monthly Normative Factors are for Quarter
+ Var Charge (EC), 1. Cap Charge – Peak Hrs in Month
C) Depreciation upto (25%More) &Cap Charge- Off Peak Hrs
90% ( i.e., Salvage + Incentive @65p/kwh(Peak) &
Value 10%) @50p/kwh(OffPeak) for SG energy > Ex-
D) Interest on WC on Bus energy corresponding to NQPLF
30daysCoal+30 days 2. Var Charges(EC)
CoalStock +60 days C) Depreciation Upto 95% (Salvage 5%)
Receivables D) 20 Days Coal Stock + Advance
E) Debt equity Ratio Payment of 30 Days Coal + 45 Days
70:30 Receivables
E) Debt equity Ratio 70:30 same as previous
3 O&M Expenses in ₹ 16.00 L in FY 14-15 20.38 L in FY 19-20
Lakhs/MW for 500MW 20.43 L in FY 18-19 23.12 L in FY 23-24
Series Units
4 Special Allowance inlieu 7.5L/MWescalated 9.5L/MW Fixed for 2019-24
of R&M at 6.35% yearly Compensation allowance discontinued
for old plants
5 Transit & Handling Pit Head – 0.2% Pit Head – 0.2%
Losses allowed in Coal Non Pit Head – 0.8% Non Pit Head (<1000 KM) – 0.8% Non
Pit Head (>1000 KM) – 1.2%
6 Norms of Operation
A Normative Availability NAPAF – 85% NQPAF –83%
B PLF forIncentive NAPLF – 85% NQPLF –85%
C Gross Station Heat Rate Existing Existing Old -Same as Present i.e.,
(2375–40) kcal/kwh (2375 – 40) kcal/kwh
(500MW with TDBFP) (500MW with TDBFP)
For 200/210/250 MW For 200/210/250 MW units , HR =2410
units , HR =2450 kcal/Kwh
kcal/Kwh Units COD after 01.04.2009
New Units CoD after 1.05xDesignHRwithMax Limitsof As
01.04.2014 Before
1.045 x Design HR
with Max Limits
D Sec fuel Oil Consumptn 0.5ml/kwh 0.5ml/kwh
E APC (>500MW Sets with 5.25% 5.75%
TDBFP &NDCT)
APC (200MW Sets &NDCT) 8.5% Same as previous 8.5%

7 Monthly Billing Hard Copy Bills Scanned Original of Bills Sent through
Official Mail ID of Authorized Person of
Gen Company is Valid mode of Billing
8 Recovery of Statutory Not Specified Clearly Specified that Gen Company can
Charges ,duties , water recover from beneficiaries including
those on APC
Cess etc by state /
central Govts
9 Rebate / Late payment 2% <2 days 1% Same Rebates, But
Surcharge 2-30 days Late > 45 Days @1.25% per month
Late >60 Days @1.5%
10 Sharing of Gains with CDM / Norm Gain In Addition to Savings on a/c of
Beneficiaries Benefits Shared SHR,Sp.Oil,APC & Loan Re-Financing, CDM
which are shared at 50:50,
AnyNonTariffIncomelike
Income from Rent of land or
buildings; sale of scrap; statutory
investments; advances to suppliers
or contractors; Rental from
staff quarters
or contractors;
from advertisements;
investments and bank
balances - ALSO to be Shared
11 Special Provision for Old ---- GenCo & Beneficiary may agree for Total
Plants (CoD > 25 years) FC+VC to bepaid on SG Energy Balance
Energy can be sold by Genco as
it deems fit.
12 Capex on Ash Handling, Not Specified Clearly Allowed for Existing Plants and
Transportation ,Ash New Plants
Utilization facilities
&Additional Capex on
Ash Dyke Raising
13 Initial spares of plant and 4% Same as previous 4%
machinery

14 Water and security Only water charges was Water and security charges allowed
expenses allowed additional to additional to O&M
O&M expenses expenses

15 Land used for renewable energy will not


be true up in capital cost of
thermal plant