You are on page 1of 54

Emergency Response Center

of
Ikata Power Station

October 2013

Naoki Yokota / Shikoku EPC

0
Copyright © 2013 Shikoku Electric Power Co., Inc.
Copyright © 2013 Shikoku Electric Power Co., Inc.
Contents

1. Shikoku EPC (YONDEN)

2. Emergency Response Center

3. Emergency Preparedness

-1- Copyright © 2013 Shikoku Electric Power Co., Inc.


1. Shikoku EPC (YONDEN)

2
Copyright © 2013 Shikoku Electric Power Co., Inc.
Copyright © 2013 Shikoku Electric Power Co., Inc.
Overview (as of March31,2013)

Established on May 1, 1951

1 of 10 Electric Utilities

Power Service in Shikoku Island (18,791km2)

Capital : 145 billion Yen (≒1,565mil USD)

2.87 Million Customers

Power Capacity : 6,963 MW

Electricity Sales: 28.4 million kWh

Shikoku Electric Power


=> 四国 電力
=> YON DEN
YONDEN
YONDEN

-3- Copyright © 2013 Shikoku Electric Power Co., Inc.


Major Facilities
Saijo TPP (Coal) Sakaide TPP
(Natural Gas, Oil & Cokes Oven Gas)
Unit 1 Unit 2
Unit 1 Unit 2 Unit 3 Unit 4*
156MW 250MW
296MW 350MW 450MW 350MW

Ikata
IkataPS
PS Anan TPP (Oil)
Unit 1 125MW
Unit 2 220MW
Unit 3 450MW
Unit 4 450MW

Hongawa HPP
2 Units 615MW

Tachibana-Wan
TPP (Coal)
Unit 700MW
Generating Facilities Total 6,963 MW
Transmission Lines Total 3,396 km
Substations Total 20,827 MVA
Distribution Lines Total 45,338 km
-4- Copyright © 2013 Shikoku Electric Power Co., Inc.
Ikata Power Station
2,022MW
(Pressurized Water Reactor)

Unit 1 556MW (COD – 30 September 1977)


Unit 2 556MW (COD – 19 March 1982)
Unit 3 890MW (COD – 15 December 1994)
-5- Copyright © 2013 Shikoku Electric Power Co., Inc.
Electricity Sales & Peak Load

Fiscal Year

Fiscal Year

-6- Copyright © 2013 Shikoku Electric Power Co., Inc.


Profit
Million USD

-7- Copyright © 2013 Shikoku Electric Power Co., Inc.


Credit Rating

Credit Rating for Credit Rating for


Long-Term Debts Short-Term Debts

A- A-2
Standard & Poor’s
(7th Grade) (3rd Grade)

Rating & AA- a-1+


Investment
Information (4th Grade) (Top Grade)

As of October 2013

-8- Copyright © 2013 Shikoku Electric Power Co., Inc.


2. Emergency Response Center
(ERC)

9
Copyright © 2013 Shikoku Electric Power Co., Inc.
Copyright © 2013 Shikoku Electric Power Co., Inc.
Location

1U

3U
2U

ERC Building

- 10 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Bird’s View

ERC Building in Ikata Power Station

- 11 - Copyright © 2013 Shikoku Electric Power Co., Inc.


ERC Building

Information

Structure : Reinforced concrete,


Seismically isolated
Floors : Above ground - 6
Under ground - 1
Area : 18m×51m
Height : GL+35m
Total floor area : 6,770㎡

- 12 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Floor Design

( in Emergency )

Office 6F

Office 5F Documents etc.

Office 4F Emergency
Response
Plant data Staff
Data server etc. 3F Data transmission

Canteen 2F Accommodation
Support

ERC 1F ERC

GF Entrance Control (Security border)


Guest room etc.

- 13 - Copyright © 2013 Shikoku Electric Power Co., Inc.


ERC (1st floor)

:Radiation shielding wall


(70cm thick)
:Radiation protected area

- 14 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement

„ 14* regulatory requirements


became effective on 8 July 2013.
* Content-wise
Not the number of the regulation chapters

„ Ikata Unit 3 meets all the requirements.


(Ikata Unit 1&2 – now studying)

- 15 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 1

Requirement
Requirement

„ ERC should be located separately from


Main Control Room (MCR).

Ikata
IkataUnit
Unit33

„ ERC is located on the 1st floor of ERC building,


which is away from the auxiliary building where
MCR is located.

- 16 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 1
0 300m

Unit 3 MCR

ERC Building

- 17 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 2

Requirement
Requirement

„ Persons who direct each emergency response activity


should be able to stay in ERC.

Ikata
IkataUnit
Unit33

„ The followings are achievable in ERC.

- Alternative AC power supplies are provided.


- Exposure dose of the person who stays in ERC
for 7 days in emergency is under 100 mSv.
- Monitoring and wear-changing place can be set up
at the entrance of ERC.

- 18 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 3

Requirement
Requirement

„ Necessary information to respond the emergency


should be obtained.

Ikata
IkataUnit
Unit33

„ All the necessary plant data can be obtained and


checked in ERC.

- 19 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 3

ERC 総合事務所
Building Unit 3
伊方3号機

Emergency Plant Condition


緊急時安全状態表示システム

社内(所外)へ
(有線系回線
Outside
/多重無線系
回線)
Safety Parameter
安全パラメータ伝送システム
Plant Data
プラントデータ
Outside
ERSS等へ
(有線系回線/
衛星系回線)

ERC
緊急時対策所 異なる伝送経路で
Different
データ伝送
lines
多様性を確保した専用
Exclusive lines
通信回線でデータ伝送

CRT
データ表示端末

- 20 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 3

1 号機
タービン建家
タービン建屋
原子炉補助建家

Unit
3号機3

C桟橋

2 号機
原子炉建屋 原子炉補助建屋

ERC
総合事務所

     :Emergency Plant Condition


安全パラメータ伝送システム用データ伝送経路
     :Safety Parameter
緊急時安全状態表示システム用データ伝送経路

- 21 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 4

Requirement
Requirement

„ Necessary external / internal communication


should be established.

Ikata
IkataUnit
Unit33
„ Necessary external / internal communication can
be achieved by the following facilities.
[ external ]
- Yonden’s land line
- providers’ land line
- providers’ satellite line
[ internal ]
- plant communication line, and so forth

- 22 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 5

Requirement
Requirement

„ Emergency response staff should be able


to stay in ERC.

Ikata
IkataUnit
Unit33

„ 100 people can stay in ERC.


„ 3,720 meals are stocked in ERC.
(100 people x 3 meals x 7 days = 2,100 meals)
„ Sufficient amount of radiation protection goods
are stocked.

- 23 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 5
List of Radiation protection items
Item ERC Ikata PS*
Tungsten vest 10 -
Tyvek protective wear 770 25,000
Radiation Protection

Cap 770 8,000


Sox 770 16,000
Contamination Cotton glove 770 100,000
Shoe cover 770 4,000
Rubber glove 1,540 240,000
Full face 110 700
Mask Charcoal 1,540 460
Air-supplied 110 260
Alarm pocket dosimeter 100 1,780
Scintillation counter 2 28
Measuring instrument
Ionization chamber 2 54
for contamination density 2 203
* In the wear house or the RCA entrances
- 24 - Copyright © 2013 Shikoku Electric Power Co., Inc.
Regulatory Requirement 6

Requirement
Requirement

„ Functional failure of ERC should not be caused


by standard-level earthquake or tsunami .

Ikata
IkataUnit
Unit33

„ ERC is located in the seismically isolated building.


„ ERC building is built on the EL. 10m ground
while the height of the biggest tsunami is estimated
as 4.1 m above the sea level.

- 25 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 6

EPC Building
basement

Lead-core multiple-layer rubber Sliding Plate Oil Damper


900φ(Core 190~200φ) x 20 500~600φ x 6 1000kN type x 4

- 26 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 6
Lead-core multiple-layer rubber
900φ(Core 190~200φ)

Lead-core

Multiple-layer rubber
Covering rubber

Base plate

- 27 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 7

Requirement
Requirement

„ One event should not simultaneously cause


the failure of ERC and MCR.

Ikata
IkataUnit
Unit33

„ ERC is located separately from MCR.


„ The following facilities are independent and separate.
- radiation shielding
- emergency generator
- ventilation system

- 28 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 8

Requirement
Requirement
„ ERC should be supplied by alternative AC power
sources. Such power sources should be multiplied
or diversified.

Ikata
IkataUnit
Unit33

„ ERC has the following alternative AC power sources.


- installed gas turbine generator (exclusive use)
- plant emergency buses
- portable generator
- distribution line from the outside of the plant

- 29 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 8
Power Sources
① Unit 2 operation bus
② Distribution line from the outside
③ Installed gas-turbine generator (exclusive use)
④ Plant emergency buses
⑤ Portable generator (300kVA)
① ② ③ ⑤
2号機常用 一般
① ② ③
緊対所GT 300kVA
高圧母線 配電線
(1000kVA) ⑤
電源車
(2250kVA) (2250kVA) ④
2号機非常用 1号機非常用 1号機非常用 2号機非常用 3号機非常用
Unit 2
低圧電源 Unit
低圧電源 1 Unit
低圧電源 1 Unit
低圧電源 2 Unit
低圧電源 3
(75kVA) (75kVA) (150kVA) (150kVA) (150kVA)

総合事務所 総合事務所
常用負荷 非常用負荷
(1500kVA) (750kVA)

ERC
・常用コンセント
・常用電灯
・非常用コンセント
ERC Building
・非常用電灯
Building
・厨房機器 Emergency
・空調機器 など
・常用エレベータ
Operation
・事務別館 など
ERC
緊対所負荷 電灯
Lights
(267kVA) Plant data Ventilation
通信設備A 通信設備B
Plant data 換気空調 その他
others
コンセント

緊急時対策所 給電系統概要図

- 30 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 9

Requirement
Requirement

„ Radiation shielding and ventilation system should be


suitably designed for the staff habitability.

Ikata
IkataUnit
Unit33

„ ERC has sufficient shielding wall and multiple


ventilation lines, as well as boosting air cylinders.

- 31 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 9
Double filtered ventilation system
- Modification required by NRA -

ERC

- 32 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 9
液晶TV スクリーン 液晶TV

緊急時対策所

Pa1
Air cylinders
室内圧
(食料庫)
Pa2
防災資機材保管庫



B点 2 2

Pa2
防災資機材
保管庫
加 資機材保管庫

A点
装 室内圧

ボンベ

Item Contents
# of cylinders 150
ERC :20
Location
Roof of ERC building :130
Atmos.+ 8 Pa
17
(Flow : 50m3/h)
Boosting Atmos.+14 Pa
12
hours (Flow : 65m3/h)
Atmos.+ 17Pa
8
(Flow : 80m3/h)

- 33 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 10

Requirement
Requirement
„ Exposure dose for 7 days should be under 100 mSv
on the following assumptions.
- Radioactive material release is the same as
Fukushima accident.
- Staff wears no mask in ERC.

Ikata
IkataUnit
Unit33

„ On the assumptions above, exposure dose is


calculated as approximately 19 mSv.

- 34 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 10
ERC data
Area 600 m2
Elevation 14.6 m

Radiation Wall 70 cm
Shielding Ceiling 50 cm
(thickness) Floor 20 cm

Portable
filtered fan

Clean
Area

- 35 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 10
Exposure dose in ERC
Source mSv
To staff working in ERC Radioactive material
in the reactor building 0.0034
(gamma ray)
Radioactive material
0.089
released in the air
Radioactive material
4.8※
in-taken in ERC
Radioactive material
13
deposited in the ground
Total 19
* In case of single filter : 300 mSv
* In Clean Room : 0.14 mSv

- 36 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 11

Requirement
Requirement

„ Monitoring and wear-changing place should be


equipped in ERC.

Ikata
IkataUnit
Unit33

„ The ERC building is designed to set up the monitoring


and wear-changing places in case of emergency.

- 37 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 11
- In the beginning of the radioactive material release -

Ground floor

Contamination Check

OUT

See the See the


next page next page

Wear-change Entrance
Control

IN

- 38 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 11
- In case the ground floor is contaminated -

1st floor

Contamination Check
Wear-change
IN OUT

Entrance
Control

- 39 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 12

Requirement
Requirement

„ Without the help of the operators in MCR,


ERC staff should be able to grasp the plant condition.

Ikata
IkataUnit
Unit33

„ By the plant data transmission system, staff can


check the plant data in ERC.

- 40 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 13

Requirement
Requirement
„ Communication and data-transmission system
should be exclusive and comprised of diversified lines.

Ikata
IkataUnit
Unit33

„ Necessary external / internal communication can


be achieved. (Please see the Requirement 4.)
„ Data transmission is achieved by Yonden-owned,
exclusive transmission lines.

- 41 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 14

Requirement
Requirement
„ Oxygen level meter with appropriate accuracy
should be equipped in ERC.

Ikata
IkataUnit
Unit33

„ 2 qualified oxygen level meter are equipped in ERC.

- 42 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Regulatory Requirement 14

Oxygen level meter

Range 0~25vol%<~40vol%>

Accuracy ±0.7vol%

Alarm 19.5(L)/18(LL)/40vol%(OVER)

Alarm
±1vol%
accuracy

Power Ni-Cd battery

Size & 35(W)×104(H)×20(D)mm


weight 80g

- 43 - Copyright © 2013 Shikoku Electric Power Co., Inc.


3. Emergency Preparedness

44
Copyright © 2013 Shikoku Electric Power Co., Inc.
Copyright © 2013 Shikoku Electric Power Co., Inc.
New Regulation
< Previous > < New >
Terrorism
Airplane crash Management
Radioactive material (NEW)
release
Containment failure Sever Accident
Management
Core damage (NEW)
Internal flood (NEW)
Design Base Natural hazard
Protection NEW: Volcano,
Tornado, Forest fire
Natural hazard Enhanced
Fire
Fire
Loss of power
Loss of power
others
others
Earthquake & Tsunami Enhanced
Earthquake & Tsunami

- 45 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Earthquake & Tsunami

Requirement Ikata Unit 3

To be protective against the Standard-level earthquake acceleration of


standard-level earthquake 570 gal will not affect the safety.

To be protective against the


Earthquake & Tsunami

standard-level tsunami The largest tsunami height is 4.1m.


Tsunami protection to be The ground level is EL.10m.
seismically robust
To look back 400 thousand
years for active false Already taken into consideration.
evaluation

To understand the ground Uniform structure was confirmed by 4000m-


structure 3D-wise boring survey.

Safety-related facilities NOT


to be build on the active- (ditto)
false-relevant ground

- 46 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Design Base Protection
Requirement Ikata Unit 3
The plant safety is confirmed with regard to;
To be protective against
- Mass increase by volcano ash
volcano, tornado, forest fire,
- Wind pressure and blown objects
etc.
- Surface temperature increase by forest fire
Design base protection

To be protective against Pipe break or SFP sloshing does not affect


internal flood. the plant safety.
To be protective against Fire detectors are installed.
internal fire. Important cables are separately located.
To maintain the reliability of The reliability of not only dynamic but also
safety-related function. static facilities is confirmed.
Several alternative power sources are
To maintain the reliability of
provided.
power supply.
Feasibility of refueling is also confirmed.
Ultimate heat sink to be Access to the ultimate heat sink is not
secured damaged by tsunami.

- 47 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Sever Accident Management 1
Required Function Ikata Unit 3
To make the plant Boron injection can make the plant
subcritical at the plant trip subcritical.
To maintain core cooling
TDAFWS is made available in SBO.
when RCS pressure is high
Sever Accident Management

N2 cylinders to open release valve are


To depressurize RCS
available.
To maintain core cooling Charging pumps or portable pumps can
when RCS pressure is low achieve the core cooling.
To maintain UHS Several portable pumps are available.
To cool down, depressurize,
and restrain the radioactive Alternative CV spray pump is installed.
material release in CV
To prevent containment Sea water is made available for CV cooling
failure unit.
To cool melted core CV spray system can be used.
To prevent hydrogen
Hydrogen re-combiner in CV are installed.
explosion in CV

- 48 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Sever Accident Management 2
Required Function Ikata Unit 3
To prevent hydrogen Annulus exhausting function is
explosion in RE/B strengthened.
To cool down, shield radiation, Portable pumps are available.
and keep sub-criticality in SFP SFP instrument is strengthened.
Sever Accident Management

To supply cooling water New piping system is installed.


Newly installed and portable generators
To supply alternative power
are available.
To keep MCR function Sufficient habitability of MCR is confirmed.
To keep ERC function Sufficient habitability of ERC is confirmed.
To keep instrument function Instrument for CV is strengthened.
To keep monitoring function Monitoring function in ERC is strengthened.
Sufficient communication function is
To communicate
confirmed.
To restrain radioactive
Water cannon is available.
material release
To inject cooling water Several portable pumps are available.

- 49 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Core Cooling Management
Added function not relevant to regulatory requirement
① Self-cooling
② Cooling line
③ Cooling line
④ battery
⑤ Opening function
⑥ Pressurizing
⑦ Cooling line
⑧ Injection line
⑨ Starting function
⑩ Injection line
⑪ Injection line
⑫ Injection line
⑬ Injection line

- 50 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Containment Function Management
Added function not relevant to regulatory requirement
① Opening function
② Pressurizing
③ Cooling line
④ Injection line
⑤ Instrument
⑥ Self-cooling
⑦ Instrument
Explosion

prevention
Explosion

prevention
⑩ Injection line
Explosion

prevention
⑫ Injection line

- 51 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Radioactive Material Release Mgt.

Added function

① Release restraint

② Release restraint

③ Release restraint

Reactor Containment Vessel

② Mitigation of Radioactive Material Release


in the case of Fuel Failure in SFP

Mitigation of Radioactive Material Release in
the case of C/V Failure
Steam
Fire Foam Generator Fire Foam
Chemical Agent Chemical Agent
Pressurizer

Large-sized Water Water Large-sized


Pump Car Foam Mixer Cannon Cannon Foam Mixer Pump Car
Control Rod Driving
Spent Fuel Pit Mechanism

Sea
Water
③ Sea
Water
Middle-sized
Pump Car
Reactor
Vessel

Sea
Water Spent Fuel Reactor
Coolant Pump

③ SFP Spray System (Small-


sized Water Cannon, Pipe)

- 52 - Copyright © 2013 Shikoku Electric Power Co., Inc.


Thank you !

53
Copyright © 2013 Shikoku Electric Power Co., Inc.
Copyright © 2013 Shikoku Electric Power Co., Inc.

You might also like