DESCRIPTION Y N NA

PLUMBING CHECKLIST
Collect the following Building Data
Arch. Plan, elevation & section (Furniture preferred)
Required No.Of people
Reflected ceiling plan
Infrastructure plan details

Check the following for Each Plumbing Unit (Equipment):-


Sump Pump
Drainage Lifting Station
Gray water system (WTP & ETP)
Sewerage treatment system (STP)
Transfer Pump
Booster Pump
Semi Booster pump
Recirculation pump
Electrical water heater
solar water heater
Central water heater
solar heat pump water heater
water cooling system (saniltary fixtures)
RO plant with cooling system
Process water equipments
Flushing water system
Water Leakage Detector system
Irrigation system
Swimming Pool drainage and water supply system
Pressure reducing valve
Acid waste and vent system
Vaccum drainage system
Storm water Drainage system
Rain water system

DESIGN DRAWING
General Before Starting (Verify the following)
Arch. Plans are comply with the latest edition
Mechanical shafts' size are suitable for Plumbing Riser
Take care from the maintenance door access
complete false ceiling drawing, this drawing consist of lighting position ,
fire alarm detectors , sprinklers and speakers ....... etc
Inside each space verify the following
Soil and waste water pipes flow rate as per BS 12056-2
Pipes slope to be follow as per standard.
Proper vent pipe connection
Proper Floor drain connection
Cleanout to be provided.
Soil and waste water pipes size to be mentioned
Pipes Length exceeds 15 meter provide rodding eye.
All pipe running above false ceiling shall be acoustically insulated

Soil and waste water pipes size to be mentioned


Exhaust system required ?
Value of supply & Return CFM achieving the pressure difference?

Duct works (Supply & Return), check the following

Duct height that connected to flex. Is more than flex. Dia. (2" minimum)

VAV installed for each individual zone


Main duct height that connected to branch duct has height more than
the branch height (2" more minimum)
VD is installed for all branches
Duct height is suitable to space plenum
Duct routing not conflicting with beams, columns, ….. ETC
Fire damper installed on duct paths through fire zone walls
Fire damper installed on opening of free return air paths through fire
zone walls
Duct text (Size & Flow) is written to each part
Duct riser Text data written (CFM, Connected AHU)
Fire damper installed at main duct connected to riser
Bell mouth is there for free return system
Duct distance (From AHU to the first fitting) at roof comply with min.
distance allowed by code
All dampers installed to duct
Bottom of duct height should be mentioned to compare it with the height
of the false-ceiling
availability of space between duct and flexible in order to make sure that
there is no any extreme bending in the flexible
* Continue verifying the summation of CFM after each branch to the
AHU
* Continue Verifying that duct Velocity for any duct portion comply with
the max. velocity restriction by code
Chilled water pipes works (Supply & Return), check the following

CHWP S&R connected to each AHU


Water flow rate (GPM) comply with load calculation result
Pipe Hookup shown at pipes connected to AHU, Pumps & chillers
Pipe text (size & Flow GPM) written to each pipe
Pipe network don’t blocking pathway at any area
Pipe Hookup shown at ETS is correct
Provision for future expansion is shown?

* Continue verifying the summation of GPM after each branch to the


chiller (CUP)
* Continue Verifying that pipe Velocity for any pipe portion comply with
the max. velocity restriction by code

HVAC Equipment, check the following


Chillers Qty. & capacity are enough for the required cooling load
calculated
Equipment furnisher at roof aren't blocking any pathway
before any check , please make sure from the HVAC equipment flow
access
Each equipment physical dimension comply true dimension as per
selection
Spacing between equipment, walls & roof comply with manfacturer
recommendation
Chilled water pumps' Qty. & Capacity are the same of chiller quantity &
Capacity
Exhaust fans are away from any FA duct intake and FAF
Exhaust fans' qty. & capacity comply with calculation
SRFs are installed in correct location
SRFs Capacity are comply with calculations
FAFs are installed in correct location
FAFs Capacity are comply with calculations
SCPFs are serving all escaping stair case
SCPFs Capacity are comply with calculations
Expansion Tank are installed in correct location
Expansion Tank Capacity are comply with calculations
Buffer Tank are installed in correct location
Buffer Tank Capacity are comply with calculations
Chemical Dosing Pot are serving all escaping stair case
Chemical Dosing Pot Capacity are comply with calculations
Makeup Source are serving all escaping stair case
Makeup Source Capacity are comply with calculations
HVAC Equipment Schedule, confirm the following
AHU
Cooling capacity comply with the load caculation
Tag No. comply with drawings
Location comply with drawings
Supply CFM comply with the load caculation
FA CFM comply with the load caculation
Type comply with the load caculation
Ambient Temp. comply with the load caculation
ESP comply with caculation
Chilled water Temp. comply with the load caculation
Chilled water Flow comply with the load caculation

Chiller
Cooling capacity comply with the load caculation
Qty. comply with drawings
Tag No. comply with drawings
Location comply with drawings
Type comply with selection
Chilled water Temp. comply with the load caculation
Chilled water Flow comply with the load caculation
Ambient Temp. comply with the selection
chiller control completely intergrated with BMS or Not, this point must
be clear.
Pump
Qty. comply with drawings
Tag No. comply with drawings
Location comply with drawings
Type comply with selection
Chilled water Flow comply with the load caculation
Pump Head comply with the caculation

VAV
Qty. comply with drawings
Tag No. comply with drawings
Flow CFM comply with the Tag. No.
NC comply with code

Fans
Tag No. comply with drawings
Qty. comply with drawings
Flow CFM comply drawings
Type comply with selection
Location comply with drawings
ESP comply with caculation

Riser Diagram, Verify the following


All Risers are shown
All equipment are shown in correctfloor as per plans
Size at riser comply with size on plan.
Size of each floor entrance comply with size on plan.
SRF & FAF are connected to main duct
Equipment data comply with equipment schdule

General, Verify the following

Title block comply with the project title project of other departments

Project name is comply with tender project name


Drawing Title is comply with drawing list template
Drawing No. is complying drawing list template
Drawing scale
General Details, Verify the following
Detail covers all project items
Item installation comply with project specs.
Item values shown in details comply with values in project
Detail No. refere to item in plans
Remarks
`