Sr. PROJECT START TARGET Pressure Final DRAWING NUMBER EQUIPMENT Material Preparation M/C Fitup Welding Blast/ Others End Date REMARKS No. ID DATE DATE DP RT UT MT Test Inspection NO. Paint
2 2018-43 P410-411559-002/FAB 32 NOS. 12-Nov-18 30-Dec-18 NA NA 31-Jan-19
3 2018-43 P410-411559-001/FAB 54 NOS. 26-Nov-18 30-Dec-18 NA NA 31-Jan-19
4 2018-43 P410-411559-002/FAB 40 NOS. 26-Nov-18 30-Dec-18 NA NA 31-Jan-19
6 2018-58 STELLITE 6 VELAN P1 & P8 3 NOS. 25-Dec-18 6-Jan-19 NA NA Awaiting Result
8 2018-60 S103209-V 2 NOS. 25-Dec-18 25-Jan-19 NA 24-Dec-18
9 2018-62 NA 16 NOS. 21-Dec-18 25-Dec-19 NA NA NA 24-Dec-18 DELIVERED 10 2018-63 ### 2 NOS. 18-Dec-18 31-Dec-18 NA NA
12 2018-68 S103193-S1 NOA18-0454/1 21-Dec-18 31-Dec-18 NA NA 20-Dec-18 Final Welding WIP
14 2018-69 C-DV-F01-001 3 NOS. 28-Feb-19 Materials to be ordered