Process groupe Knwoledge area Process

Initiation Integeration Develop Project Charter

Initiation Integeration Develop Project Charter

Initiation Integeration Develop Project Charter

Initiation Integeration Develop Project Charter


Initiation Integeration Develop Project Charter

Initiation stakeholders Identify Stakeholders

Initiation stakeholders Identify Stakeholders

Initiation stakeholders Identify Stakeholders

Initiation stakeholders Identify Stakeholders

Initiation stakeholders Identify Stakeholders

Initiation stakeholders Identify Stakeholders

Initiation stakeholders Identify Stakeholders

Initiation stakeholders Identify Stakeholders

Initiation stakeholders Identify Stakeholders

Initiation stakeholders Identify Stakeholders


Planning Integeration Develop Project Management Plan

Planning Integeration Develop Project Management Plan

Planning Integeration Develop Project Management Plan

Planning Integeration Develop Project Management Plan

Planning scope Plan Scope Management

Planning scope Plan Scope Management

Planning scope Plan Scope Management

Planning scope Plan Scope Management

Planning scope Plan Scope Management

Planning scope Plan Scope Management

Planning scope Collect Requirements

Planning scope Collect Requirements

Planning scope Collect Requirements

Planning scope Collect Requirements

Planning scope Collect Requirements

Planning scope Collect Requirements

Planning scope Collect Requirements


Planning scope Collect Requirements

Planning scope Collect Requirements

Planning scope Collect Requirements

Planning scope Collect Requirements

Planning scope Define Scope

Planning scope Define Scope

Planning scope Define Scope

Planning scope Define Scope

Planning scope Define Scope

Planning scope Define Scope

Planning scope Define Scope

Planning scope Create WBS

Planning scope Create WBS

Planning scope Create WBS

Planning scope Create WBS

Planning scope Create WBS

Planning Schedule Plan Schedule Management

Planning Schedule Plan Schedule Management

Planning Schedule Plan Schedule Management

Planning Schedule Plan Schedule Management

Planning Schedule Plan Schedule Management

Planning Schedule Define Activities

Planning Schedule Define Activities

Planning Schedule Define Activities

Planning Schedule Define Activities

Planning Schedule Define Activities


Planning Schedule Sequence Activities

Planning Schedule Sequence Activities

Planning Schedule Sequence Activities

Planning Schedule Sequence Activities

Planning Schedule Sequence Activities

Planning Schedule Sequence Activities

Planning Schedule Sequence Activities

Planning Schedule Sequence Activities

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Estimate Activity Durations

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule


Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning Schedule Develop Schedule

Planning cost Plan Cost Management

Planning cost Plan Cost Management

Planning cost Plan Cost Management

Planning cost Plan Cost Management

Planning cost Plan Cost Management

Planning cost Estimate Costs

Planning cost Estimate Costs

Planning cost Estimate Costs

Planning cost Estimate Costs

Planning cost Estimate Costs

Planning cost Estimate Costs

Planning cost Estimate Costs

Planning cost Estimate Costs

Planning cost Estimate Costs


Planning cost Determine Budget

Planning cost Determine Budget

Planning cost Determine Budget

Planning cost Determine Budget

Planning cost Determine Budget

Planning cost Determine Budget

Planning cost Determine Budget

Planning cost Determine Budget

Planning cost Determine Budget

Planning cost Determine Budget

Planning cost Determine Budget

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management

Planning Quality Plan Quality Management


Planning Resource Plan Resource Management

Planning Resource Plan Resource Management

Planning Resource Plan Resource Management

Planning Resource Plan Resource Management

Planning Resource Plan Resource Management

Planning Resource Plan Resource Management

Planning Resource Plan Resource Management

Planning Resource Plan Resource Management

Planning Resource Plan Resource Management

Planning Resource Estimate Activity Resources

Planning Resource Estimate Activity Resources

Planning Resource Estimate Activity Resources

Planning Resource Estimate Activity Resources

Planning Resource Estimate Activity Resources

Planning Resource Estimate Activity Resources

Planning Resource Estimate Activity Resources

Planning Resource Estimate Activity Resources

Planning Resource Estimate Activity Resources

Planning Resource Estimate Activity Resources

Planning Communication Plan Communications Management

Planning Communication Plan Communications Management

Planning Communication Plan Communications Management

Planning Communication Plan Communications Management

Planning Communication Plan Communications Management

Planning Communication Plan Communications Management


Planning Communication Plan Communications Management

Plan Communications Management

Planning Risk Plan Risk Management

Planning Risk Plan Risk Management

Planning Risk Plan Risk Management

Planning Risk Plan Risk Management

Planning Risk Plan Risk Management

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks


Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Identify Risks

Planning Risk Perform Qualitative Risk Analysis

Planning Risk Perform Qualitative Risk Analysis

Planning Risk Perform Qualitative Risk Analysis

Planning Risk Perform Qualitative Risk Analysis

Planning Risk Perform Qualitative Risk Analysis

Planning Risk Perform Qualitative Risk Analysis

Perform Qualitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis


Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Perform Quantitative Risk Analysis

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Risk Plan Risk Response

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management


Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Procurement Plan Procurement Management

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Planning Stakeholders Plan Stakeholder Engagement

Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work


Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work

Excution Integeration Direct and Manage Project Work

Excution Quality Manage Quality

Excution Quality Manage Quality

Excution Quality Manage Quality

Excution Quality Manage Quality

Excution Quality Manage Quality

Excution Quality Manage Quality

Manage Quality

Manage Quality

Excution Resource Acquire Resources

Excution Resource Acquire Resources

Excution Resource Acquire Resources

Excution Resource Acquire Resources

Excution Resource Acquire Resources

Excution Resource Acquire Resources

Excution Resource Acquire Resources

Excution Resource Acquire Resources

Excution Resource Acquire Resources

Excution Resource Develop Team


Excution Resource Develop Team

Excution Resource Develop Team

Excution Resource Develop Team

Excution Resource Develop Team

Excution Resource Develop Team

Excution Resource Develop Team

Excution Resource Develop Team

Excution Resource Manage Team

Excution Resource Manage Team

Excution Resource Manage Team

Excution Resource Manage Team

Excution Resource Manage Team

Excution Resource Manage Team

Excution Resource Manage Team

Excution Resource Manage Team

Excution Resource Manage Team

Excution Communication Manage Communications

Excution Communication Manage Communications

Excution Communication Manage Communications

Excution Communication Manage Communications

Excution Communication Manage Communications


Excution Communication Manage Communications

Excution Communication Manage Communications

Excution Communication Manage Communications

Excution Communication Manage Communications

Excution Communication Manage Communications

Excution Communication Manage Communications

Excution Communication Manage Communications

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Procurement Conduct Procurements

Excution Stakeholders Manage Stakeholder Engagement

Excution Stakeholders Manage Stakeholder Engagement


Excution Stakeholders Manage Stakeholder Engagement

Excution Stakeholders Manage Stakeholder Engagement

Excution Stakeholders Manage Stakeholder Engagement

Excution Stakeholders Manage Stakeholder Engagement

Excution Stakeholders Manage Stakeholder Engagement

Excution Stakeholders Manage Stakeholder Engagement

Excution Stakeholders Manage Stakeholder Engagement

Excution Risk Implement Risk Responses

Excution Risk Implement Risk Responses

Excution Risk Implement Risk Responses

Excution Risk Implement Risk Responses

Excution Risk Implement Risk Responses

Excution Integration Manage Project Knowledge

Excution Integration Manage Project Knowledge

Excution Integration Manage Project Knowledge

Excution Integration Manage Project Knowledge

Excution Integration Manage Project Knowledge

Excution Integration Manage Project Knowledge

Excution Integration Manage Project Knowledge

Excution Integration Manage Project Knowledge

Excution Integration Manage Project Knowledge

MC Integration Monitor and Control Project Work


MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Monitor and Control Project Work

MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control


MC Integration Perform Integrated Change Control

MC Integration Perform Integrated Change Control

MC Scope Validate Scope

MC Scope Validate Scope

MC Scope Validate Scope

MC Scope Validate Scope

MC Scope Validate Scope

MC Scope Validate Scope

MC Scope Validate Scope

MC Scope Validate Scope

MC Scope Validate Scope

MC Scope Control Scope

MC Scope Control Scope

MC Scope Control Scope

MC Scope Control Scope

MC Scope Control Scope

MC Scope Control Scope

MC Scope Control Scope

MC Scope Control Scope

MC Scope Control Scope

MC Scope Control Scope

MC Scope Control Scope

MC Schedule Control Schedule

MC Schedule Control Schedule


MC Schedule Control Schedule

MC Schedule Control Schedule

MC Schedule Control Schedule

MC Schedule Control Schedule

MC Schedule Control Schedule

MC Schedule Control Schedule

MC Schedule Control Schedule

MC Schedule Control Schedule

MC Schedule Control Schedule

MC Cost Control Costs

MC Cost Control Costs

MC Cost Control Costs

MC Cost Control Costs

MC Cost Control Costs

Cost Control Costs

MC Cost Control Costs

MC Quality Control Quality

MC Quality Control Quality

MC Quality Control Quality

MC Quality Control Quality

MC Quality Control Quality

MC Quality Control Quality


MC Quality Control Quality

MC Quality Control Quality

MC Quality Control Quality

MC Resource Control Resources

MC Resource Control Resources

MC Resource Control Resources

MC Resource Control Resources

MC Resource Control Resources

MC Resource Control Resources

MC Resource Control Resources

MC Resource Control Resources

MC Resource Control Resources

MC Resource Control Resources

MC Resource Control Resources

MC Communication Monitor Communications

MC Communication Monitor Communications

MC Communication Monitor Communications

MC Communication Monitor Communications

MC Communication Monitor Communications

MC Communication Monitor Communications

MC Communication Monitor Communications

MC Communication Monitor Communications

MC Communication Monitor Communications


MC Risk Monitor Risks

MC Risk Monitor Risks

MC Risk Monitor Risks

MC Risk Monitor Risks

MC Risk Monitor Risks

MC Risk Monitor Risks

MC Risk Monitor Risks

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements

MC Procurement Control Procurements


MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

MC Stakeholders Monitor Stakeholder Engagement

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase


closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase

closing Integration Close Project or Phase


I/P T&T

Business documents
• Business case Expert judgment
• Benefits management plan

Data gathering
• Brainstorming
Agreements
• Focus groups
• Interviews

Interpersonal and team skills


• Conflict management
EEF
• Facilitation
• Meeting management

OPA Meetings

Project charter Expert judgment

Business documents Data gathering


• Business case • Questionnaires and surveys
• Benefits management plan • Brainstorming
Data analysis
Communications management plan • Stakeholder analysis
• Document analysis
Data representation
Stakeholder engagement plan
• Stakeholder mapping/representation
Change log Meetings

Issue log

Requirements documentation

Agreements

EEF

OPA
Project Charter Expert judgment

Data gathering
• Brainstorming
Outputs from other processes • Checklists
• Focus groups
• Interviews

Interpersonal and team skills


• Conflict management
EEF
• Facilitation
• Meeting management

OPA Meetings

Project Charter Expert judgment


Data analysis
Quality Management Plan
• Alternatives analysis
Project life cycle description Meetings

Development approach

EEF

OPA

Project Charter Expert judgment

Data gathering
• Brainstorming
• Interviews
Scope Management Plan • Focus groups
• Questionnaires and
surveys
• Benchmarking

Data analysis
Requirements management plan
• Document analysis
Decision making
Stakeholder engagement plan • Voting
• Multicriteria decision analysis
Data representation
Assumption log • Affinity diagrams
• Mind mapping

Interpersonal and team skills


• Nominal group technique
Lessons learned register
• Observation/conversation
• Facilitation

Stakeholder register Context diagram


Business documents
Prototypes
• Business case
Agreements

EEF

OPA

Project Charter Expert judgment


Data analysis
Scope Management Plan
• Alternatives analysis
Decision making
Assumption Log
• Multicriteria decision analysis
Interpersonal and team skills
Requirements Documentation
• Facilitation
Risk Register Product analysis

EEF

OPA

Scope management plan Expert judgment

Project scope statement Decomposition

Requirements documentation

EEF

OPA

Project Charter Expert judgment

Scope Management Plan Data analysis

Development Approach Meetings

EEF

OPA

Schedule management plan Expert judgment

Scope baseline Decomposition

EEF Rolling wave planning

OPA Meetings
Schedule management plan Precedence diagramming method

Scope baseline Dependency determination and integration

Activity list Leads and lags

Activity attributes Project management information system

Data analysis
Milestone list • Alternatives analysis
• Reserve analysis

Assumption Log

EEF

OPA

Schedule management plan Expert judgment

Scope baseline Analogous estimating

Activity list Parametric estimating

Activity attributes Three-point estimating

Milestone list Bottom-up estimating

Data analysis
Assumption Log • Alternatives analysis
• Reserve analysis

Lessons learned register Decision making

Project team assignments Meetings

Resource breakdown structure

Resource calendars

Resource requirements

Risk register

EEF

OPA

Schedule management plan Schedule network analysis

Scope baseline Critical path method

Activity list Resource optimization

Data analysis
Activity attributes • What-if scenario analysis
• Simulation
Assumption Log Leads and lags

Duration estimates Schedule compression

Basis of estimates Project management information system

Milestone list Agile release planning

Lessons learned register

Project team assignments

Project schedule network diagrams

Resource calendars

Resource requirements

Risk register

Agreements

EEF

OPA

Project charter Expert judgment

Schedule management plan Data analysis

Risk management plan Meetings

EEF

OPA

Cost management plan Expert judgment

Quality management plan Analogous estimating

Scope baseline Parametric estimating

Lessons learned register Three-point estimating

Project schedule Bottom-up estimating

Data analysis
• Alternatives analysis
Resources requirements
• Reserve analysis
• Cost of quality

Risk register Project management information system


Decision making
EEF
• Voting
OPA
Cost management plan Expert judgment

Resource management plan Cost aggregation


Data analysis
Scope baseline
• Reserve analysis
Basis of estimates Historical information review

Cost estimates Funding limit reconciliation

Project schedule Financing

Risk register

Business documents
• Business case
• Benefits management plan

Agreements

EEF

OPA

Project charter Expert judgment

Data gathering
• Benchmarking
Requirements management plan
• Brainstorming
• Interviews

Data analysis
Risk management plan • Cost-benefit analysis
• Cost of quality
Decision making
Stakeholder engagement plan
• Multicriteria decision analysis

Data representation
• Flowcharts
Scope baseline • Logical data model
• Matrix diagrams
• Mind mapping

Assumption log Test and inspection planning

Requirements documentation Meetings

Requirements traceability matrix

Risk register

Stakeholder register

EEF

OPA
Project charter Expert judgment

Data representation
• Hierarchical charts
Quality management plan
• Responsibility assignment matrix
• Text-oriented formats

Scope baseline Organizational theory

Project schedule Meetings

Requirements documentation

Risk register

Stakeholder register

EEF

OPA

Resource management plan Expert judgment

Scope baseline Analogous estimating

Activity attributes Parametric estimating

Activity list Bottom-up estimating


Data analysis
Assumption log
• Alternatives analysis
Cost estimates Project management information system

Resource calendars Meetings

Risk register

EEF

OPA

Project charter Expert judgment

Resource management plan Communication requirements analysis

Stakeholder engagement plan Communication technology

Requirements documentation Communication models

Stakeholder register Communication methods

Interpersonal and team skills


• Communication styles assessment
EEF
• Political awareness
• Cultural awarenes
Data representation
OPA • Stakeholder engagement assessment
matrix
Meetings

Project charter Expert judgment


Data analysis
Project management plan
• Stakeholder analysis
Stakeholder register Meetings

EEF

OPA

Requirements management plan Expert judgment

Data gathering
• Brainstorming
Schedule management plan
• Checklists
• Interviews

Data analysis
• Root cause analysis
Cost management plan • Assumption and constraint analysis
• SWOT analysis
• Document analysis

Interpersonal and team skills


Quality management plan
• Facilitation
Resource management plan Prompt lists

Risk management plan Meetings

Scope baseline

Schedule baseline

Cost baseline

Assumption log

Cost estimates

Duration estimates

Issue log

Lessons learned register

Requirements documentation

Resource requirements

Stakeholder register
Agreements

Procurement documentation

EEF

OPA

Risk management plan Expert judgment


Data gathering
Assumption log
• Interviews

Data analysis
• Risk data quality assessment
Risk register
• Risk probability and impact assessment
• Assessment of other risk parameters

.4 Interpersonal and team skills


Stakeholder register
• Facilitation
EEF Risk categorization

Data representation
OPA • Probability and impact matrix
• Hierarchical charts

Meetings

Risk management plan Expert judgment


Data gathering
Scope baseline
• Interviews
Interpersonal and team skills
Schedule baseline
• Facilitation
Cost baseline Representations of uncertainty

Data analysis
• Simulations
Assumption log • Sensitivity analysis
• Decision tree analysis
• Influence diagrams

Basis of estimates

Cost estimates

Cost forecasts

Duration estimates

Milestone list
Resource requirements
Risk register
Risk report

Schedule forecasts

EEF

OPA

Resource management plan Expert judgment


Data gathering
Risk management plan
• Interviews
Interpersonal and team skills
Cost baseline
• Facilitation
Lessons learned register Strategies for threats

Project schedule Strategies for opportunities

Project team assignments Contingent response strategies

Resource calendars Strategies for overall project risk

Data analysis
Risk register • Alternatives analysis
• Cost-benefit analysis
Decision making
Risk report
• Multicriteria decision analysis
Stakeholder register

EEF

OPA

Project charter Expert judgment

Business documents
Data gathering
• Business case
• Market research
• Benefits management plan
Data analysis
Scope management plan
• Make-or-buy analysis
Quality management plan Source selection analysis

Resource management plan Meetings

Scope baseline

Milestone list

Project team assignments

Requirements documentation

Requirements traceability matrix


Resource requirements

Risk register

Stakeholder register

EEF

OPA

Project charter Expert judgment


Data gathering
Resource management plan
• Benchmarking
Data analysis
Communications management plan • Assumption and constraint analysis
• Root cause analysis
Decision making
Risk management plan
• Prioritization/ranking
Data representation
• Mind mapping
Assumption log
• Stakeholder engagement assessment
matrix

Change log Meetings

Issue log

Project schedule

Risk register

Stakeholder register

Agreements

EEF

OPA

Project management plan Expert judgment

Change log Project management information system

Lessons learned register Meetings

Milestone list

Project communications

Project schedule

Requirements traceability matrix

Risk register
Risk report

Approved change requests

EEF

OPA

Data gathering
Quality management plan
• Checklists

Data analysis
• Alternatives analysis
Lessons learned register • Document analysis
• Process analysis
• Root cause analysis

Decision making
Quality control measurements
• Multicriteria decision analysis

Data representation
• Affinity diagrams
• Cause-and-effect diagrams
Quality metrics • Flowcharts
• Histograms
• Matrix diagrams
• Scatter diagrams

Risk report Audits

OPA Design for X

Problem solving

Quality improvement methods

Decision making
Resource management plan
• Multicriteria decision analysis
Interpersonal and team skills
Procurement management plan
• Negotiation
Cost baseline Pre-assignment

Project schedule Virtual teams

Resource calendars

Resource requirements

Stakeholder register

EEF

OPA

Resource management plan Colocation


Lessons learned register Virtual teams

Project schedule Communication technology

Interpersonal and team skills


• Conflict management
• Influencing
Project team assignments
• Motivation
• Negotiation
• Team building

Resource calendars Recognition and rewards

Team charter Training

EEF Individual and team assessments

OPA Meetings

Interpersonal and team skills


• Conflict management
• Decision making
Resource management plan
• Emotional intelligence
• Influencing
• Leadership

Issue log Project management information system

Lessons learned register

Project team assignments

Team charter

Work performance reports

Team performance assessments

EEF

OPA

Resource management plan Communication technology


Communications management plan Communication methods
Communication skills
• Communication competence
Stakeholder engagement plan • Feedback
• Nonverbal
• Presentations

Change log Project management information system

Issue log Project reporting


Interpersonal and team skills
• Active listening
• Conflict management
Lessons learned register • Cultural awareness
• Meeting management
• Networking
• Political awareness

Quality report Meetings

Risk report

Stakeholder register

Work performance reports

EEF

OPA

Scope management plan Expert judgment

Requirements management plan Advertising

Communications management plan Bidder conferences


Data analysis
Risk management plan
• Proposal evaluation
Interpersonal and team skills
Procurement management plan
• Negotiation
Configuration management plan

Cost baseline

Lessons learned register

Project schedule

Requirements documentation

Risk register

Stakeholder register

Procurement documentation

Seller proposals

EEF

OPA

Communications management plan Expert judgment


Communication skills
Risk management plan
• Feedback
Interpersonal and team skills
• Conflict management
• Cultural awareness
Stakeholder engagement plan
• Negotiation
• Observation/conversation
• Political awareness

Change management plan Ground rules

Change log Meetings

Issue log

Lessons learned register

Stakeholder register

EEF

Risk management plan Expert judgment


Interpersonal and team skills
Lessons learned register
• Influencing
Risk register Project management information system

Risk report

OPA

Project management plan Expert judgment

Lessons learned register Knowledge management

Project team assignments Information management

Interpersonal and team skills


• Active listening
• Facilitation
Resource breakdown structure
• Leadership
• Networking
• Political awareness

Source selection criteria

Stakeholder register

Deliverables

EEF

OPA

Project management plan Expert judgment


Data analysis
• Alternatives analysis
• Cost-benefit analysis
Assumption log • Earned value analysis
• Root cause analysis
• Trend analysis
• Variance analysis

Basis of estimates Decision making

Cost forecasts Meetings

Issue log

Lessons learned register

Milestone list

Quality reports

Risk register

Risk report

Schedule forecasts

Work performance information

Agreements

EEF

OPA

Change management plan Expert judgment

Configuration management plan Change control tools

Data analysis
Scope baseline • Alternatives analysis
• Cost-benefit analysis

Decision making
• Voting
Schedule baseline
• Autocratic decision making
• Multicriteria decision analysis

Cost baseline Meetings

Basis of estimates

Requirements traceability matrix

Risk report

Work performance reports

Change requests
EEF

OPA

Scope management plan Inspection


Decision making
Requirements management plan
• Voting
Scope baseline

Lessons learned register

Quality reports

Requirements documentation

Requirements traceability matrix

Verified deliverables

Work performance data

Data analysis
Scope management plan • Variance analysis
• Trend analysis

Requirements management plan

Change management plan

Configuration management plan

Scope baseline

Performance measurement baseline

Lessons learned register

Requirements documentation

Requirements traceability matrix

Work performance data

OPA

Data analysis
• Earned value analysis
• Iteration burndown chart
Schedule management plan • Performance reviews
• Trend analysis
• Variance analysis
• What-if scenario analysis

Schedule baseline Critical path method


Scope baseline Project management information system

Performance measurement baseline Resource optimization

Lessons learned register Leads and lags

Project calendars Schedule compression

Project schedule

Resource calendars

Schedule data

Work performance data

OPA

Cost management plan Expert judgment

Data analysis
• Earned value analysis
Cost baseline • Variance analysis
• Trend analysis
• Reserve analysis

Performance measurement baseline To-complete performance index

Lessons learned register Project management information system

Project funding requirements

Work performance data

OPA

Data gathering
• Checklists
Quality management plan • Check sheets
• Statistical sampling
• Questionnaires and surveys

Data analysis
Lessons learned register • Performance reviews
• Root cause analysis

Quality metrics Inspection

Test and evaluation documents Testing/product evaluations

Data representation
• Cause-and-effect diagrams
Approved change requests • Control charts
• Histogram
• Scatter diagrams

Deliverables Meetings
Work performance data

EEF

OPA

Data analysis
• Alternatives analysis
Resource management plan • Cost-benefit analysis
• Performance reviews
• Trend analysis

Issue log Problem solving

Interpersonal and team skills


Lessons learned register • Negotiation
• Influencing

Physical resource assignments Project management information system

Project schedule

Resource breakdown structure

Resource requirements

Risk register

Work performance data

Agreements

OPA

Resource management plan Expert judgment

Communications management plan Project management information system

Data analysis
Stakeholder engagement plan • Stakeholder engagement assessment
matrix
Interpersonal and team skills
Issue log
• Observation/conversation
Lessons learned register Meetings

Project communications

Work performance data

EEF

OPA
Data analysis
Risk management plan • Technical performance analysis
• Reserve analysis

Issue log Audits

Lessons learned register Meetings

Risk register

Risk report

Work performance data

Work performance reports

Requirements management plan Expert judgment

Risk management plan Claims administration

Data analysis
• Performance reviews
Procurement management plan
• Earned value analysis
• Trend analysis

Change management plan Inspection

Schedule baseline Audits

Assumption log

Lessons learned register

Milestone list

Quality reports

Requirements documentation

Requirements traceability matrix

Risk register

Stakeholder register

Agreements

Procurement documentation

Approved change requests

Work performance data

EEF

OPA
Data analysis
• Alternatives analysis
Resource management plan
• Root cause analysis
• Stakeholder analysis

Decision making
Communications management plan • Multicriteria decision analysis
• Voting
Data representation
Stakeholder engagement plan • Stakeholder engagement assessment
matrix
Communication skills
Issue log • Feedback
• Presentations

Interpersonal and team skills


• Active listening
• Cultural awareness
Lessons learned register
• Leadership
• Networking
• Political awareness

Project communications Meetings

Risk register

Stakeholder register

Work performance data

EEF

OPA

Project charter Expert judgment

Data analysis
• Document analysis
Project management plan • Regression analysis
• Trend analysis
• Variance analysis

Assumption log Meetings

Basis of estimates

Change log

Issue log

Lessons learned register

Milestone list

Project communications

Quality control measurements


Quality reports

Requirements documentation

Risk register

Risk report

Accepted deliverables

Business documents
• Business case
• Benefits management plan

Agreements

Procurement documentation

OPA
O/P

Project Charter

Assumption Log

Stakeholder Register

Change Request

Project management plan updates

Project documents updates


Project management plan

Scope management plan

Requirements Management Plan

Requirements documentation

Requirements traceability matrix


Project scope statement

Project documents updates

Scope baseline

Project documents updates

Schedule management plan

Activity list

Activity attributes

Milestone list

Change requests

Project management plan updates


Project schedule network diagrams

Project documents updates

Duration estimates

Basis of estimates

Project documents updates

Schedule baseline

Project schedule

Schedule data

Project calendars
Change requests

Project management plan updates

Project documents updates

Cost management plan

Cost estimates

Basis of estimates

Project documents updates


Cost baseline

Project funding requirements

Project documents updates

Quality management plan

Quality metrics

Project management plan updates

Project documents updates


Resource management plan

Team charter

Project documents updates

Resource requirements

Basis of estimates

Resource breakdown structure

Project documents updates

Communications management plan

Project management plan updates

Project documents updates


Risk management plan

Risk register

Risk report

Project documents updates


Project documents updates

Project documents updates


Change requests

Project management plan updates

Project documents updates

Procurement management plan

Procurement strategy

Bid documents

Procurement statement of work

Source selection criteria

Make-or-buy decisions

Independent cost estimates

Change requests

Project documents updates

Organizational process assets updates


Stakeholder engagement plan

Deliverables

Work performance data

Change requests

Project management plan updates

Project documents updates

Organizational process assets updates


Quality reports

Test and evaluation documents

Change requests

Project management plan updates

Project documents updates

Physical resource assignments

Project team assignments

Resource calendars

Change requests

Project management plan updates

Project documents updates

Enterprise environmental factors updates

Organizational process assets updates

Team performance assessments


Change requests

Project management plan updates

Project documents updates

Enterprise environmental factors updates

Organizational process assets updates

Change requests

Project management plan updates

Project documents updates

Enterprise environmental factors updates

Project communications
Project management plan updates

Project documents updates

Organizational process assets updates


Selected sellers

Agreements

Change requests

Project management plan updates

Project documents updates

Organizational process assets updates

Change requests

Project management plan updates


Project documents updates

Change requests

Project documents updates

Lessons learned register

Project management plan updates

Organizational process assets updates

Work performance reports


Change requests

Project management plan updates

Project documents updates

Approved change requests

Project management plan updates

Project documents updates


Accepted deliverables

Work performance information

Change requests

Project document updates

Work performance information

Change requests

Project management plan updates

Project documents updates

Work performance information

Schedule forecasts
Change requests

Project management plan updates

Project documents updates

Work performance information

Cost forecasts

Change requests

Project management plan updates

Project documents updates

Quality control measurements

Verified deliverables

Work performance information

Change requests

Project management plan updates

Project documents updates


Work performance information

Change requests

Project management plan updates

Project documents updates

Work performance information

Change requests

Project management plan updates

Project documents updates


Work performance information

Change requests

Project management plan updates

Project documents updates

Organizational process assets updates

Closed procurements

Work performance information

Procurement documentation updates

Change requests

Project management plan updates

Project documents updates

Organizational process assets updates


Work performance information

Change requests

Project management plan updates

Project documents updates

Project documents updates

Final product, service, or result transition

Final report

Organizational process assets updates