Professional Documents
Culture Documents
Maintenance Manual
AK 200 S / AK 200 ULTRA S
05.2006
CM
MY
CY
CMY
GAMBRO
Maintenance Manual
General
To ensure proper operation of the AK 200 S / To fulfill the preventive maintenance procedures
AK 200 ULTRA S, a qualified service technician for AK 200 S / AK 200 ULTRA S some parts must
must perform a complete series of preventive be exchanged. The necessary parts to be ex-
maintenance procedures at regular intervals. changed are available in a Base-kit and two
The maintenance and calibration information complementary kits:
that you need to use is provided in this manual.
• Base-kit (K40165001)
The preventive maintenance procedures have
been devised to require a minimum of time while • A-kit (K40166001): Includes exterior parts
ensuring that the machine is maintained in
optimum operation condition. • B-kit (K40167001): Overhauling service-kit
Test equipment
* If installed
Parts
The Base-kit (K40165001) includes all parts
necessary to fulfill the mandatory preventive
maintenance procedures for AK 200 S /
AK 200 ULTRA S.
Note!
As a complement to the Base-kit, two additional
kits are available; A- and B-kit.
1. First perform a combined heat disinfection 4. Change air filters in the AC/DC unit.
program with CleanCart C or liquid citric
acid.
Then perform a heat disinfection program in
combination with CleanCart A or a Chemical
disinfection program with sodium hypochlo-
rite. Refer to the AK 200 S or
AK 200 ULTRA S Operator’s Manual.
2. Change air filters in the Blood Monitor. 5. Change the upper and lower O-rings in the
BiCart holder.
2
3
1
o-ring
3. Change air filter in the Fluid Monitor. 6. Change the upper and lower O-rings in the
SelectCart holder.
2
3
1
o-ring
7. Change the O-rings and square-rings in the 10. Change the particle filter after the SelectBag
ultrafilter holders. (Only for AK 200 S with holder (50 µm).
UFD-kit and AK 200 ULTRA S)
o-ring
o-ring
square-
ring
8. Change the upper and lower filters on the 11. Change the filter for the heating vessel
BiCart holder (50 µm). (250 µm).
9. Change the lower filter on the SelectCart 12. Change the V-rings in the heating vessel.
holder (50 µm).
A B
13. If ULTRA: Change the membrane for the 16. Change the sealing ring and the ring on the
internal pressure regulator. inlet unit inside the heating vessel.
15. Change the sample ports. 18. Mark month and year for the next scheduled
preventive maintenance. Attach the label to
the rear cover of the machine.
05 10
06 09
07 08
05 10
06 09
07 08
6. Check the protective earth resistance in BM. 8. Erase the error code buffers. Enter
Measure between TP 8 (Z0VL) on the BM- service menu > Diagnose > System >
CPU board and the earth point on the bottom Errors > Erase
plate. Measure in MΩ, should be > 1 MΩ.
The machine must be empty and switched off
during measurement.
Note! The BM must be connected to the FM.
TP4
TP5 TP9
TP7 TP10
TP11
TP17
TP14 TP18
TP12 TP22
TP13
TP6
TP8
TP15
TP16
TP21
TP3 E01342007
TP19
TP2 TP20
1074
TP1 TP4
TP2 TP3
TP7
TP8
TP5
TP6
E01345009
9.5 Check of pressure transducer calibration and 10. Calibrate the Priming detector (BM 6).
measured pressure
10.1 Enter Service/Calibr/BM and set the
By entering this test mode it will be possible to AK 200 S / AK 200 ULTRA S display to:
check the actual pressure value for the BPM
pressure on the AK 200 S / PRIMING DETECTOR
BM 6
AK 200 ULTRA S display.
Before entering the test mode, pressure trans- 10.2 Press to start calibration routine.
ducer calibration tube kit K13983002 to be
connected to the BPM connector on the rear of
the AK 200 S / AK 200 ULTRA S . No cuff and 10.3
cuff hose to be connected.
INSERT EMPTY REFERENCE TUBE
Press SET key when ready
11. Calibrate the Level detector 12. Measure the power on battery B1 on the
(Air detector) (BM 5). BM-CPU board, exchange if the value is
below 2,6 V (Note! The machine must be
11.1 Enter Service/Calibr/BM and set the switched on when measuring).
AK 200 S / AK 200 ULTRA S display to:
LEVEL DETECTOR
BM 5
13. Control of the blood pump occlusion The GO pin should barely pass within the cali-
brating area.
Check surface on the roller at the pump rotor, if
it is damaged exchange the unit. The roller unit The STOP pin is NOT allowed to pass in any
should easily go back to upper end position when point within the calibrating area.
it has been pressed down to end position, ex-
change unit if it gets stuck in any position. Note! Put grease on the GO and STOP pins
when not used and store gage in plastic bag to
Note! If the blood lines/infusion lines have a prevent it from corroding.
different wall thickness, the occlusion of the
blood pump must be adjusted to the right size. Note! The gauge pins can also be ordered sepa-
rately:
Use the gauge pins (stop/go) available in the kit T=1.1 (white) K40158002
K40158001. The kit includes following three T=1.6 mm (red) K40158003
different gauge pins: T=2.0 mm (blue) K40158004
= Measuring
14. Enter Service/Calibr/BM and set the 15. Enter Service/Calibr/BM and set the
AK 200 S / AK 200 ULTRA S display to: AK 200 S / AK 200 ULTRA S display to:
16. Enter Service/Calibr/BM and set the 17. Enter Diagnose/BM/Pumps and check that
AK 200 S / AK 200 ULTRA S display to: the blood pump(s) stops when the cover is
opened.
PRESSURE VENOUS
BM 3
1 2
19. Enter Service/Calibr/FM and set the 20. Enter Service/Calibr/FM and set the
AK 200 S / AK 200 ULTRA S display to: AK 200 S / AK 200 ULTRA S display to:
19.1 Press to start calibration routine. 20.1 Press to start calibration routine.
19.2 Disconnect a tube to achieve zero pressure 20.2 Disconnect a tube to achieve zero pressure
(see picture). (see picture).
19.3 Check zero level of the Degassing Pressure 20.3 Check zero level of the Flow Output Pres-
Transducer. sure Transducer.
Tolerance: ± 5 mmHg. Tolerance: ± 5 mmHg.
Calibrate if necessary (see chapter calibration Calibrate if necessary (see chapter calibration
for details). for details).
21. Enter Service/Calibr/FM and set the 22. Enter Service/Calibr/FM and set the
AK 200 S / AK 200 ULTRA S display to: AK 200 S / AK 200 ULTRA S display to:
23. Enter Service/Calibr/FM and set the 24. Enter Service/Calibr/FM and set the
AK 200 S / AK 200 ULTRA S display to: AK 200 S / AK 200 ULTRA S display to:
23.1 Press to start calibration routine. 24.1 Press to start calibration routine.
23.2 Disconnect a tube to achieve zero pressure 24.2 Disconnect a tube to achieve zero pressure
(see picture). (see picture).
23.3 Check zero level of the Dialysis Fluid Pres- 24.3 Check zero level of the Safety Guard Pres-
sure Transducer. sure Transducer.
Tolerance: ± 5 mmHg. Tolerance: ± 5 mmHg.
Calibrate if necessary (see chapter calibration Calibrate if necessary (see chapter calibration
for details). for details).
OR
25. If installed: Calibrate the pH-sensor 28. Check the conductivity indications, at ap-
(FM 13) with a buffer solution. proximately 14 mS/cm.
26. Remove the blood leak detector cover and Use GXL – fluid monitor screen and a refer-
clean the inside of the blood leak housing. ence instrument connected to the dialysis
fluid tubes.
Mount a blood leak calibration cover. Make
sure that the filter is in horisontal position, The indicated conductivity values in GXL
start the AK 200 S / AK 200 ULTRA S. should correspond to the indication on the
reference instrument. The maximum devia-
Enter the Service menu, select calibration, tion is ±0.1 mS/cm.
FM, intern and Blood Leak Detector
(FM24). 29. Check the temperature indications, at ap-
Place A-pickup tube in concentrate contai- proximately 37 °C.
ner and let it stabilise for 15 minutes. Use GXL – fluid monitor screen and a refer-
ence instrument connected to the dialysis
Note! Let the AK 200 S / AK 200 ULTRA S fluid tubes.
stabilize at 37° C The indicated temperature value (at the
conductivity cell 2, guard) should correspond
to the indication on the reference instru-
Press to enter the blood leak calibra- ment. The maximum deviation is ±1.5 °C.
tion routine.
If the deviation is more than the stated
tolerance; the affected temperature trans-
Check the blood leak detector limits 0 and
ducer must be exchanged.
100 ±10.
Calibrate if necessary (see chapter
30. Place the B-pickup tube in the concentrate
calibration for details).
container.
Perform an FRN calibration. Enter service
27. Check the water level in the heating vessel,
menu/Calibr/FM/Other/UF/Restr.
should be approximately 1cm above the
centerline, adjust if necessary.
31. Let the machine pass Fch. Check the DC 38. If ULTRA: Calibration of internal pressure
leakage between TP 7 (Z0VL) on the Power regulator.
distribution board and the earth point on the
back plate. Measure in DC Voltage, should be
< 1 V. 38.1 Press and set the main flow to
35. Check the DC leakage between TP 7 (Z0VL) 38.6 Connect a tube between the infusion port
on the Power distribution board and the Flow and an external pressure reference instru-
Out pump head. Measure in DC Voltage, ment.
should be < 1 V.
36. Check the DC leakage between TP 7 (Z0VL) 38.7 Press to obtain main flow through the
on the Power distribution board and the
cover on the Flow In pump motor. Measure pressure regulator.
in DC Voltage, should be < 1 V.
38.8 Adjust the pressure regulator to
37. Check the DC leakage between TP 7 (Z0VL) +55 mmHg ±5 mmHg.
on the Power distribution board and the Flow
In pump head. Measure in DC Voltage,
should be < 1 V. 38.9 Press and remove the reference
instrument and tube.
39. Perform a simulated treatment according to · Check the residual volume at TIME=0:00
following instruction: · Approved residual volume:
100 ml ±50 ml.
· If the BVS is installed, switch it on. · Approved difference between actual
· The machine must be in volume control. UF volume and UF Supervision
· Insert a filled venous drip chamber in the volume is 120 ml.
level detector.
· When the priming button is flashing, simulate · The BVS test tool simulates a hemoglobin
a venous pressure of approximately 50 mmHg. value within the range 60 – 160 g/l.
· (Insert the BVS test tool, K22281001).
· Set the UF-volume to 0.9 and treatment TIME When inserted into the BVS unit it is possible
to 1:00h. to check the switch, that a reference value is
· Connect a T-piece to the dialysis tubings. Put taken and that a graph is shown on the infor-
the end of the tube in a measuring glass filled mation display when the BVS key is pressed.
with more than 1 liter of water, approx. 37 °C .
· Press fluid bypass. Check that the tube to the The value for relative blood volume will be
meassuring glass is filled with water and all approx. 0 % with some deviations. Do note
air bubbles are evacuated. that the blood flow must be more than 180 ml/
· Set the blood pump speed to 200 ml/min, press min for 5 minutes before a reference value is
the priming button and start the blood pump. taken.
· Press UF-rate and set priming UF rate and
minimum UF-rate to 0.0 l/h.
· Make sure the measuring glass is filled to 1.00
liter adjust if necessary.
C: Press .
Parts
The A-kit is designed to be used as a complemen-
tary addition to the Base-kit for the preventive
maintenance procedures of AK 200 S and
AK 200 ULTRA S.
Note!
All parts in the A-kit are possible to exchange
without opening the dialysis machine.
1. Change the pick-up tube A (red). 4. Change the dialyser connector set red,
locking ring, nipple, conical filter and O-ring.
5 mm
2. Change the pick-up tube B (blue-white). 5. Change the non-return valve on the water
inlet tube.
3. Change the dialyser connector set blue and 6. Add/change the washers for the blood pump
the locking ring. rotors.
5 mm
1. First perform a heat disinfection program. Use following formula to calculate which gage
Refer to the AK 200 S or AK 200 ULTRA S pin to use:
Operator’s Manual. 2 * wall thickness * 0,7 (mm)
2. After the heat disinfection; re-tighten the nuts Check the range between the blood pump rollers
of the dialyser connector set to the machine. and the path according to the picture below.
Nuts 5 mm
= Measuring
3. Let the machine pass FCH. Adjust range between the blood pump rollers and
A leakage test of the dialyser connector set is the path if it is necessary.
peformed in state 24.
The GO pin should barely pass within the cali-
brating area.
Parts
The B-kit is designed to be used as a complemen-
tary addition to the Base-kit for the preventive
maintenance procedures of AK 200 S and
AK 200 ULTRA S.
2. Change following complete valves: 5. Change all the Santoprene tubes in the fluid
FOVA, DIVA, TAVA, BYVA, DRVA, BCVA,TPVA monitor.
and PBVA.
3. Change complete Recirculation valve. 6. Change the (complete) venous pressure line.
Tel: +46 46 16 90 00
Fax: +46 46 16 96 96
www.gambro.com