You are on page 1of 9

P OW E R PAC K

COMMERCIAL AND UTILITY STORAGE


S E RVI CES

We understand how critical it is to maximize

your Powerpack system’s performance and

uptime. As a Tesla customer, you have access to

our in house service experts, who will help

safeguard your Powerpack system and ensure it

performs to expected output.

We can tailor a solution to meet your needs from a comprehensive design,

installation and O&M offering to a more targeted service or guarantee.

PRODUCT DESIGN AND ENGINEERING CAPACITY GUARANTEE

INSTALLATION AND COMMISSIONING RECYCLING

OPERATIONS AND MAINTENANCE

TESLA .COM/EN ERGY


EX PERIENCE

10 + 300 + 18 +
YEARS OF BATTERY MWh OF STORAGE COUNTRIES WITH STORAGE

EXPERIENCE PRODUCTS IN SERVICE PROJECTS IN OPERATION

TESLA.COM/EN ERGY
275’-5” [83.94m]
P R OJ EC T D ES I G N
A N D EN G IN E E R I N G

61’-1” [18.62m]
170’-10: [52.08m]

Our expert team of engineers will determine the

precise system specifications and applications

for your site. We design and engineer Powerpack

systems for seamless integration, long-term

reliability and maximum value.


5MW AC BLOCK

The team offers:

TECHNICAL INTEGRATION SUPPORT TECHNICAL DOCUMENTATION

AND TRAINING
Interconnection design to determine how
Powerpack will connect to your existing Design manuals, installation manuals, and
infrastructure application notes
Interconnection requirements outlined by Installation training through an interactive
your utility online course and/or in-person training
SCADA/controls integration

Site design and civil implications

Design reviews

POWER SYSTEMS ANALYSIS TURNKEY EPC PACKAGE

Load flow and transient analysis Full engineering design package for permit
System protection consultation and construction

Construction support (RFIs, equipment


submittal reviews)

TESLA .COM/EN ERGY


INSTALLATION
AND COMMISSIONIN G

Tesla is committed to providing an unparalleled purchase

experience by ensuring Powerpack systems stay on

schedule and budget, are easily installed and have reliable

operations. After installing nearly 300MWh of energy storage

systems, Tesla has a proven track record of installing

Powerpack systems in varied location and climates.

OPERATIONS VERIFICATION ON-SITE COMMISSIONING SYSTEM VALIDATION

We verify that Powerpack Our experts apply industry The level of rigor behind our
equipment complies with best practices while adhering system audits and inspections is
purchase specifications and to all applicable safety unparalleled. Our team validates
design intent, and that all standards when software, communication and site
components work together commissioning Powerpack. integration.
properly. This critical process Our team ensures
helps ensure project installation accuracy and
requirements are met for your optimal performance.
complete satisfaction. We will
verify standard charge and
discharge, emergency power
off, and monitoring.

TESLA.COM/EN ERGY
O PERATI ON S A N D M A IN T EN A N C E

Powerpack’s sophisticated hardware and software

platform delivers the information and insights needed to

keep your system running smoothly all day, every day.

Our systems are designed for ease of ownership and are

backed by a 10-year warranty. Our O&M team offers the

below services:

OPERATION MONITORING MAINTENANCE

Our Opticaster software Access to our web-based Our team performs annual
control systems connects monitoring portal that onsite inspections,
Powerpack to the grid, delivers real-time data and diagnostics and preventive
automatically res ponding to alerts on the performance of maintenance to address any
service requests. The system your Powerpack system. The potential issues and ensure
can perform unique system monitors and reports your system continues to
applications like load on uptime availability, perform as designed. We
shifting, demand response savings and revenue over also offer uptime and
and peak shaving. Or time. availability support.
customers have the option to
integrate their own control
systems with our Powerpack
units.

TESLA .COM/EN ERGY


GLOB AL FIELD SERVICE A N D SPA R ES

TECHNICAL SUPPORT

With global service centers, staffed by our rapidly expanding network of field
service technicians, we offer 24/7 support for troubleshooting, failure analysis
and part replacement. We ensure high availability of factory certified spare
parts and access to our team who can di scover, locate, and resolve issues to
lower mean time to repair maximize system uptime and performance.

TESL A .COM/EN ERGY


C APACI TY GUA RA N T EE

Our Capacity Maintenance Agreement (CMA) CMA terms are offered for 10, 15 or 20 years
is a service offering in which Tesla guarantees and can either be paid upfront or on an annual
an agreed upon energy rating from the basis. A CMA system is still covered by
Powerpack system for the term of the project Tesla’s standard Limited Warranty, but the
contract. The CMA assures energy capacity CMA replaces the energy retention curve
for the lifetime of the project. (which shows capacity degradation over time)
section of the warranty. The CMA provides
owner confidence that the system and
investment will maintain the agreed upon
energy rating.

TESL A .COM/EN ERGY


RECYCLI N G

Tesla’s Lithium-ion batteries contain valuable materials that can be recovered and recycled for
further use in batteries and other applications. Tesla has developed, and is working to further
improve, a method for recycling our products.

Currently, Tesla’s recycling process involves the following steps:

At the batteries’ end of life, the customer will take care of


decommissioning and transporting the system to the nearest Tesla
certified facility for disassembly.

Valuable components will be removed from modules for scrap metal


recycling by Tesla certified personnel.

Modules will be packaged for shipment to the nearest processing facility


capable of recycling Tesla battery modules.

Constituent metals recovered from modules will be further refined and


used in new applications.

TESL A .COM/EN ERGY

You might also like