CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA

ENTIDAD GOBIERNO REGIONAL TACNA - TACNA


OBRA AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD CONO NORTE
FECHA MAYO DEL 2009
LUGAR TACNA - TACNA - REGION TACNA

MES 01 MES 02 MES 03 MES 04 MES 05 MES 06


Item Descripcion Monto
Monto (%) Monto (%) Monto (%) Monto (%) Monto (%) Monto (%)

01 OBRAS PROVICIONALES 83,381.42 83,381.42 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%

02 BLOQUE "A" (EMERG., FARMAC., ARCH., TOPIC 308,316.26


02.01 TRABAJOS PRELIMINARES 36,279.81 36,279.81 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
02.02 MOVIMIENTO DE TIERRAS 12,752.14 12,752.14 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
02.03 OBRAS DE CONCRETO SIMPLE 12,396.08 12,396.08 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
02.04 OBRAS DE CONCRETO ARMADO 108,563.32 43,425.33 40.0% 54,281.66 50.0% 10,856.33 10.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
02.05 MUROS Y TABIQUES DE ALBAÑILERIA 17,674.23 0.00 0.0% 10,604.54 60.0% 7,069.69 40.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
02.06 REVOQUES ENLUCIDOS Y MOLDURAS 16,908.62 0.00 0.0% 0.00 0.0% 16,908.62 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
02.07 CIELO RASOS 5,874.91 0.00 0.0% 0.00 0.0% 5,874.91 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
02.08 ZOCALOS Y CONTRAZOCALOS 8,014.06 0.00 0.0% 0.00 0.0% 0.00 0.0% 8,014.06 100.0% 0.00 0.0% 0.00 0.0%
02.09 PISOS Y PAVIMENTOS 5,264.09 0.00 0.0% 0.00 0.0% 0.00 0.0% 5,264.09 100.0% 0.00 0.0% 0.00 0.0%
02.10 REVESTIMIENTOS 8,772.15 0.00 0.0% 0.00 0.0% 0.00 0.0% 8,772.15 100.0% 0.00 0.0% 0.00 0.0%
02.11 CARPINTERIA DE MADERA 5,019.08 0.00 0.0% 0.00 0.0% 3,011.45 60.0% 2,007.63 40.0% 0.00 0.0% 0.00 0.0%
02.12 CARPINTERIA METALICA Y HERRERIA 24,689.37 0.00 0.0% 0.00 0.0% 19,751.50 80.0% 4,937.87 20.0% 0.00 0.0% 0.00 0.0%
02.13 CERRAJERIA 1,470.27 0.00 0.0% 0.00 0.0% 0.00 0.0% 1,470.27 100.0% 0.00 0.0% 0.00 0.0%
02.14 VIDRIOS, CRISTALES Y SIMILARES 11,042.94 0.00 0.0% 0.00 0.0% 0.00 0.0% 11,042.94 100.0% 0.00 0.0% 0.00 0.0%
02.15 PINTURA 9,878.79 0.00 0.0% 0.00 0.0% 0.00 0.0% 9,878.79 100.0% 0.00 0.0% 0.00 0.0%
02.16 APARATOS Y ACCESORIOS SANITARIOS 2,974.30 0.00 0.0% 0.00 0.0% 0.00 0.0% 2,974.30 100.0% 0.00 0.0% 0.00 0.0%
02.17 INSTALACIONES SANITARIAS 1,925.63 0.00 0.0% 770.25 40.0% 0.00 0.0% 1,155.38 60.0% 0.00 0.0% 0.00 0.0%
02.18 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 5,861.38 0.00 0.0% 0.00 0.0% 4,982.17 85.0% 879.21 15.0% 0.00 0.0% 0.00 0.0%
02.19 INSTALACIONES ELECTRICAS 10,797.12 0.00 0.0% 3,239.14 30.0% 0.00 0.0% 7,557.98 70.0% 0.00 0.0% 0.00 0.0%
02.20 VARIOS Y LIMPIEZA 2,157.97 0.00 0.0% 0.00 0.0% 863.19 40.0% 1,294.78 60.0% 0.00 0.0% 0.00 0.0%

03 BLOQUE "B" (ADMIS., ODONTOL., TRIAJE, MED. 191,604.79


03.01 TRABAJOS PRELIMINARES 2,652.25 2,652.25 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.02 MOVIMIENTO DE TIERRAS 10,812.41 10,812.41 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.03 OBRAS DE CONCRETO SIMPLE 9,705.63 9,705.63 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.04 OBRAS DE CONCRETO ARMADO 92,350.04 36,940.02 40.0% 55,410.02 60.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.05 MUROS Y TABIQUES DE ALBAÑILERIA 8,552.82 0.00 0.0% 8,552.82 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.06 REVOQUES ENLUCIDOS Y MOLDURAS 10,487.10 0.00 0.0% 7,340.97 70.0% 3,146.13 30.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.07 CIELO RASOS 4,118.61 0.00 0.0% 4,118.61 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.08 ZOCALOS Y CONTRAZOCALOS 6,343.40 0.00 0.0% 0.00 0.0% 6,343.40 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.09 PISOS Y PAVIMENTOS 4,645.42 0.00 0.0% 0.00 0.0% 4,645.42 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.10 REVESTIMIENTOS 2,563.51 0.00 0.0% 0.00 0.0% 2,563.51 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.11 CARPINTERIA DE MADERA 5,544.06 0.00 0.0% 3,326.44 60.0% 2,217.62 40.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.12 CARPINTERIA METALICA Y HERRERIA 1,775.23 0.00 0.0% 0.00 0.0% 1,775.23 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.13 CERRAJERIA 1,135.23 0.00 0.0% 0.00 0.0% 1,135.23 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.14 VIDRIOS, CRISTALES Y SIMILARES 5,555.15 0.00 0.0% 0.00 0.0% 5,555.15 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.15 PINTURA 5,366.68 0.00 0.0% 0.00 0.0% 5,366.68 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.16 APARATOS Y ACCESORIOS SANITARIOS 2,300.53 0.00 0.0% 0.00 0.0% 2,300.53 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.17 INSTALACIONES SANITARIAS 2,003.68 0.00 0.0% 801.47 40.0% 1,202.21 60.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.18 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 3,268.06 0.00 0.0% 1,307.22 40.0% 1,960.84 60.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
03.19 INSTALACIONES ELECTRICAS 8,067.45 0.00 0.0% 2,420.24 30.0% 5,647.22 70.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
ENTIDAD GOBIERNO REGIONAL TACNA - TACNA
OBRA AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD CONO NORTE
FECHA MAYO DEL 2009
LUGAR TACNA - TACNA - REGION TACNA

MES 01 MES 02 MES 03 MES 04 MES 05 MES 06


Item Descripcion Monto
Monto (%) Monto (%) Monto (%) Monto (%) Monto (%) Monto (%)

03.20 VARIOS Y LIMPIEZA 4,357.53 0.00 0.0% 0.00 0.0% 4,357.53 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%

04 BLOQUE "C" (OBSTETRIC., I y II, PICOPROFI 381,512.92


04.01 TRABAJOS PRELIMINARES 4,569.86 0.00 0.0% 4,569.86 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
04.02 MOVIMIENTO DE TIERRAS 15,833.31 0.00 0.0% 15,833.31 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
04.03 OBRAS DE CONCRETO SIMPLE 14,477.67 0.00 0.0% 14,477.67 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
04.04 OBRAS DE CONCRETO ARMADO 178,244.21 0.00 0.0% 71,297.68 40.0% 89,122.11 50.0% 17,824.42 10.0% 0.00 0.0% 0.00 0.0%
04.05 MUROS Y TABIQUES DE ALBAÑILERIA 23,083.26 0.00 0.0% 0.00 0.0% 13,849.96 60.0% 9,233.30 40.0% 0.00 0.0% 0.00 0.0%
04.06 REVOQUES ENLUCIDOS Y MOLDURAS 18,451.86 0.00 0.0% 0.00 0.0% 0.00 0.0% 5,535.56 30.0% 12,916.30 70.0% 0.00 0.0%
04.07 CIELO RASOS 7,552.59 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 7,552.59 100.0% 0.00 0.0%
04.08 ZOCALOS Y CONTRAZOCALOS 14,617.92 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 14,617.92 100.0% 0.00 0.0%
04.09 PISOS Y PAVIMENTOS 7,393.11 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 7,393.11 100.0% 0.00 0.0%
04.10 REVESTIMIENTOS 10,279.46 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 10,279.46 100.0% 0.00 0.0%
04.11 CARPINTERIA DE MADERA 11,875.01 0.00 0.0% 0.00 0.0% 0.00 0.0% 8,312.51 70.0% 3,562.50 30.0% 0.00 0.0%
04.12 CARPINTERIA METALICA Y HERRERIA 22,553.79 0.00 0.0% 0.00 0.0% 0.00 0.0% 15,787.65 70.0% 6,766.14 30.0% 0.00 0.0%
04.13 CERRAJERIA 2,070.54 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 2,070.54 100.0% 0.00 0.0%
04.14 VIDRIOS, CRISTALES Y SIMILARES 7,883.05 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 7,883.05 100.0% 0.00 0.0%
04.15 PINTURA 10,596.89 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 10,596.89 100.0% 0.00 0.0%
04.16 APARATOS Y ACCESORIOS SANITARIOS 5,004.92 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 5,004.92 100.0% 0.00 0.0%
04.17 INSTALACIONES SANITARIAS 4,448.43 0.00 0.0% 0.00 0.0% 0.00 0.0% 1,779.37 40.0% 2,669.06 60.0% 0.00 0.0%
04.18 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 7,717.01 0.00 0.0% 0.00 0.0% 0.00 0.0% 3,086.80 40.0% 4,630.21 60.0% 0.00 0.0%
04.19 INSTALACIONES ELECTRICAS 11,302.59 0.00 0.0% 0.00 0.0% 0.00 0.0% 3,390.78 30.0% 7,911.81 70.0% 0.00 0.0%
04.20 VARIOS Y LIMPIEZA 3,557.44 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 3,557.44 100.0% 0.00 0.0%

05 BLOQUE "D" REFORZAMIENTO (INMUMIZAC., I 182,886.66


05.01 TRABAJOS PRELIMINARES 23,529.17 0.00 0.0% 0.00 0.0% 23,529.17 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
05.02 MOVIMIENTO DE TIERRAS 9,676.36 0.00 0.0% 0.00 0.0% 9,676.36 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
05.03 OBRAS DE CONCRETO SIMPLE 6,470.05 0.00 0.0% 0.00 0.0% 6,470.05 100.0% 0.00 0.0% 0.00 0.0% 0.00 0.0%
05.04 OBRAS DE CONCRETO ARMADO 78,379.88 0.00 0.0% 0.00 0.0% 23,513.96 30.0% 54,865.92 70.0% 0.00 0.0% 0.00 0.0%
05.05 MUROS Y TABIQUES DE ALBAÑILERIA 7,531.95 0.00 0.0% 0.00 0.0% 0.00 0.0% 7,531.95 100.0% 0.00 0.0% 0.00 0.0%
05.06 REVOQUES ENLUCIDOS Y MOLDURAS 8,890.53 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 8,890.53 100.0% 0.00 0.0%
05.07 CIELO RASOS 3,947.53 0.00 0.0% 0.00 0.0% 0.00 0.0% 1,184.26 30.0% 2,763.27 70.0% 0.00 0.0%
05.08 ZOCALOS Y CONTRAZOCALOS 4,680.03 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 4,680.03 100.0% 0.00 0.0%
05.09 PISOS Y PAVIMENTOS 4,986.36 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 4,986.36 100.0% 0.00 0.0%
05.10 REVESTIMIENTOS 2,509.83 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 2,509.83 100.0% 0.00 0.0%
05.11 CARPINTERIA DE MADERA 4,100.01 0.00 0.0% 0.00 0.0% 0.00 0.0% 2,870.01 70.0% 1,230.00 30.0% 0.00 0.0%
05.12 CARPINTERIA METALICA Y HERRERIA 2,335.26 0.00 0.0% 0.00 0.0% 0.00 0.0% 1,634.68 70.0% 700.58 30.0% 0.00 0.0%
05.13 CERRAJERIA 1,197.56 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1,197.56 100.0% 0.00 0.0%
05.14 VIDRIOS, CRISTALES Y SIMILARES 3,544.45 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 3,544.45 100.0% 0.00 0.0%
05.15 PINTURA 5,220.62 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 5,220.62 100.0% 0.00 0.0%
05.16 APARATOS Y ACCESORIOS SANITARIOS 406.69 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 406.69 100.0% 0.00 0.0%
05.17 INSTALACIONES SANITARIAS 504.68 0.00 0.0% 0.00 0.0% 0.00 0.0% 201.87 40.0% 302.81 60.0% 0.00 0.0%
05.18 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 956.82 0.00 0.0% 0.00 0.0% 0.00 0.0% 382.73 40.0% 574.09 60.0% 0.00 0.0%
05.19 INSTALACIONES ELECTRICAS 6,637.45 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 6,637.45 100.0% 0.00 0.0%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
ENTIDAD GOBIERNO REGIONAL TACNA - TACNA
OBRA AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD CONO NORTE
FECHA MAYO DEL 2009
LUGAR TACNA - TACNA - REGION TACNA

MES 01 MES 02 MES 03 MES 04 MES 05 MES 06


Item Descripcion Monto
Monto (%) Monto (%) Monto (%) Monto (%) Monto (%) Monto (%)

05.20 VARIOS Y LIMPIEZA 7,381.43 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 7,381.43 100.0% 0.00 0.0%

06 BLOQUE SEGUNDO NIVEL (S.U.M., GERENC., S. 260,626.34


06.01 OBRAS DE CONCRETO ARMADO 93,850.64 0.00 0.0% 0.00 0.0% 0.00 0.0% 65,695.45 70.0% 28,155.19 30.0% 0.00 0.0%
06.02 MUROS Y TABIQUES DE ALBAÑILERIA 28,300.45 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 28,300.45 100.0% 0.00 0.0%
06.03 REVOQUES ENLUCIDOS Y MOLDURAS 18,001.79 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 12,601.25 70.0% 5,400.54 30.0%
06.04 CIELO RASOS 8,220.95 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 8,220.95 100.0% 0.00 0.0%
06.05 ZOCALOS Y CONTRAZOCALOS 10,402.20 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 10,402.20 100.0%
06.06 PISOS Y PAVIMENTOS 15,048.94 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 15,048.94 100.0%
06.07 REVESTIMIENTOS 7,382.78 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 7,382.78 100.0%
06.08 CARPINTERIA DE MADERA 10,661.01 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 7,462.71 70.0% 3,198.30 30.0%
06.09 CARPINTERIA METALICA Y HERRERIA 18,000.33 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 12,600.23 70.0% 5,400.10 30.0%
06.10 CERRAJERIA 2,091.36 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 2,091.36 100.0%
06.11 VIDRIOS, CRISTALES Y SIMILARES 13,148.98 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 13,148.98 100.0%
06.12 PINTURA 12,167.52 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 12,167.52 100.0%
06.13 APARATOS Y ACCESORIOS SANITARIOS 974.70 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 974.70 100.0%
06.14 INSTALACIONES SANITARIAS 2,131.29 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 852.52 40.0% 1,278.77 60.0%
06.15 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 3,332.38 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1,332.95 40.0% 1,999.43 60.0%
06.16 INSTALACIONES ELECTRICAS 11,743.54 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 11,743.54 100.0%
06.17 VARIOS Y LIMPIEZA 5,167.48 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 5,167.48 100.0%

07 PISOS, PLAZA, COBERTURA Y INSTALACIONE 163,356.64


07.01 PISOS Y VEREDAS 75,524.43
07.01.01 TRABAJOS PRELIMINARES 8,796.68 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 8,796.68 100.0% 0.00 0.0%
07.01.02 MOVIMIENTO DE TIERRAS 4,463.06 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 4,463.06 100.0% 0.00 0.0%
07.01.03 CONCRETO SIMPLE 7,556.05 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 7,556.05 100.0% 0.00 0.0%
07.01.04 CONCRETO ARMADO 13,530.96 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 13,530.96 100.0% 0.00 0.0%
07.01.05 REVOQUES ENLUCIDOS Y MOLDURAS 258.80 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 258.80 100.0% 0.00 0.0%
07.01.06 PISOS Y PAVIMENTOS 21,624.08 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 8,649.63 40.0% 12,974.45 60.0%
07.01.07 REVESTIMIENTOS 6,130.44 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 6,130.44 100.0%
07.01.08 CARPINTERIA METALICA 9,264.80 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 9,264.80 100.0%
07.01.09 PINTURA 806.60 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 806.60 100.0%
07.01.10 VARIOS, LIMPIEZA Y JARDINERIA 3,092.96 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 3,092.96 100.0%
07.02 INSTALACIONES SANITARIAS - DESAGUE 6,030.94 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 6,030.94 100.0%
07.03 INSTALACIONES SANITARIAS - AGUA 11,302.41 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 11,302.41 100.0%
07.04 INSTALACIONES ELECTRICAS 10,617.22 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 10,617.22 100.0%
07.05 ESTRUCTURAS METALICAS Y COBERTURAS 59,881.64 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 59,881.64 100.0%

08 CERCO PERIMETRICO 45,152.55


08.01 TRABAJOS PRELIMINARES 16,039.74 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 16,039.74 100.0%
08.02 MOVIMIENTO DE TIERRAS 1,332.68 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1,332.68 100.0%
08.03 OBRAS DE CONCRETO SIMPLE 568.43 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 568.43 100.0%
08.04 OBRAS DE CONCRETO ARMADO 14,761.15 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 14,761.15 100.0%
08.05 MUROS Y TABIQUES DE ALBAÑILERIA 3,584.53 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 3,584.53 100.0%
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA
ENTIDAD GOBIERNO REGIONAL TACNA - TACNA
OBRA AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD CONO NORTE
FECHA MAYO DEL 2009
LUGAR TACNA - TACNA - REGION TACNA

MES 01 MES 02 MES 03 MES 04 MES 05 MES 06


Item Descripcion Monto
Monto (%) Monto (%) Monto (%) Monto (%) Monto (%) Monto (%)

08.06 REVOQUES ENLUCIDOS Y MOLDURAS 3,668.46 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 3,668.46 100.0%
08.07 CARPINTERIA METALICA Y HERRERIA 3,643.61 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 3,643.61 100.0%
08.08 CERRAJERIA 160.78 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 160.78 100.0%
08.09 PINTURA 1,355.37 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 1,355.37 100.0%
08.10 VARIOS Y LIMPIEZA 37.80 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 0.00 0.0% 37.80 100.0%

09 VARIOS 9,894.75 1,484.21 15.0% 1,484.21 15.0% 1,484.21 15.0% 1,484.21 15.0% 1,484.21 15.0% 2,473.69 25.0%

10 MITIGACION DE IMPACTO AMBIENTAL 17,436.41 2,615.46 15.0% 2,615.46 15.0% 2,615.46 15.0% 2,615.46 15.0% 2,615.46 15.0% 4,359.10 25.0%

COSTO DIRECTO 1,644,168.74 252,444.76 262,451.58 287,795.83 268,666.39 305,318.75 267,491.44


GASTOS GENERALES (10.0 %) 164,416.87 25,244.48 26,245.16 28,779.58 26,866.64 30,531.87 26,749.14
UTILIDADES (5.0 %) 82,208.44 12,622.24 13,122.58 14,389.79 13,433.32 15,265.94 13,374.57
15.4% 16.0% 17.5% 16.3% 18.6% 16.3%
IGV (19 %) 359,250.87 55,159.18 57,345.67 62,883.39 58,703.61 66,712.15 58,446.88
COSTO TOTAL OBRAS CIVILES 2,250,044.92 345,470.65 359,164.98 393,848.59 367,669.95 417,828.71 366,062.03
1 2 3 4 5 6
01 OBRAS PROVICIONALES 83,381.42
02 BLOQUE "A" (EMERG., FARMAC., A 308,316.26
03 BLOQUE "B" (ADMIS., ODONTOL., TR191,604.79
04 BLOQUE "C" (OBSTETRIC., I y II, 381,512.92
05 BLOQUE "D" REFORZAMIENTO (INM 182,886.66
06 BLOQUE SEGUNDO NIVEL (S.U.M., G 260,626.34
07 PISOS, PLAZA, COBERTURA Y IN 163,356.64
08 CERCO PERIMETRICO 45,152.55
09 VARIOS 9,894.75
10 MITIGACION DE IMPACTO AMBIENT 17,436.41

793,520.29
850,648.45
1,644,168.74

0.16666667