.005 .01 .03 .05 .1 .3 .5 1 3 5 10 30 50 100


1K 1K
Normalized (shifted) TCC
3-Phase (Sym) fault: 60.056kA @ 0.48kV
Adj Bus: 0.48 kV TR-CP-01
500 500
Connector: CB1 - Mtr1
SQOP File: Untitled
300 Data Rev: Base 300
Configuration: Normal
Date: 05-25-2018

100 100
Relay IPT-SA02 - P - 50
OC1
50 Siemens 50
7UT85
CT Ratio 200:5
30 Inst = 30 (0.5 - 175 Sec - 5A) 30

Time Delay = 0.08 s


1.526 kA @ 13.8 kV
t1: 0.08 s

10
CB1 10
General Electric Entelliguard
Sensor = 4000 Plug = 4000 Amps
LT Pickup = 0.75 (3000 Amps)
5
LT Band = 1 Relay IPT-SA02 - P - 51 5

Seconds
Seconds

ST Pickup = 1.5 (4500 Amps) OC1


3 ST Band = 4 (I^x)t = OUT Siemens 3
Inst. Pickup = 6 (24000 Amps) 7UT85
43.876 kA @ 0.48 kV CT Ratio 200:5
t1: 0.01 s, t2: 0.05 s IEC - Very Inverse
Pickup = 4 (0.5 - 20 Sec - 5A)
1 Time Dial = 0.4 1
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
1.526 kA @ 13.8 kV
.5
t1: 0.632 s .5

.3 .3
R Relay IPT-SA02

.1 .1

.05 .05

.03 .03

4000 A
CB1
85 kA
.01 .01
.005 .01 .03 .05 .1 .3 .5 1 3 5 10 30 50 100

Per Unit ETAP Star 12.6.0H

FALLA EN TR-01 AL TR-04

Project: SN:
Location: Rev: Base
Contract: Fault: Phase(Normalized)
Engineer:
Filename: R:\2018\PROYECTOS 2018\SAHE\RASTROSAHE\RASTROSAHE.OTI