Process owner : MS E4 Controlled documents are

CP-122 HSE Manual Process Author: MS E42


IS O ref: 8.1.2
online. 1/11/2017
Printed hard copies only valid if
Da te issued: 1/11/2017
Operational Planning & Control MSE4 Technical Safety Engineer ing(4.1a4) Process #: V 1.0
date of print is reflected.
E
E D5

HSE CFDH / SME Personnel PR-1418 Incident Hazard Identification & Planning to Take Action
(3.1.1 ) Notification, Reporting and Assessment of HSE Risk (ALARP) (2.1g)
Follow-up Procedure: HSE HEMP Tools 2.1b)
MSE4 Technical
Safety PR-1712 - AI PS Assurance Incident Investigation (6.1 )
Engineering Procedure (5.2.4.3) AIPS PR-2160 Pre Start-up Audit
(1.1.4 ) (4.1.4.3)
Technical Safety in Projects Operating Facilities Support Maintain Design integrity of Project Assurance Review
(4.1.4.1) (4.1.4) existing facility (5.2.4.2) for Safety (5.2.4.1)

How we How we How we How we


deliver deliver deliver deliver

Technical Safety in Projects Operating Facilities Support Maintain Design integrity Project Assurance Review
(4.1.4.1) (4.1.4) of existing facility (5.2.4.2) for Safety (5.2.4.1)
SP-2062 HSE Case Operation HSE Case support PR-1721 Statement of Project Assurance Review
requirement for Brownfield (4.1.4.6) Fitness – restart after for Safety (PR-1232)
development (2.1.4.2 ) Project Assurance Review turnaround (5.2.4.6) (5.2.4.1)
SP-2062 HSE Case for Safety (5.2.4.1) PR-1418 Statement of
requirement for Greenfield Hardware barrier Fitness – restart after
development (2.1.4.3 ) assessment (2.1.4.12 ) incident (5.2.4.7)
SP-1190 - 3 H2S & SO2 Tech Safety support for FSR Process Safety Letter of
Management - Engineering deviations (4.1.4.8) Assurance (5.2.4.5)
Design (2.1.4.14 ) SP-1190 - 4 H2S & SO2 Fire Eng review of Mtce
Statement of Fitness – Management – Operations Craft Procedure (5.3.4.2)
Project (4.1.4.5 ) (4.1.4.23)
DCAF: CP117 Project PR-1960 - Control of
engineering (2.1.4.15) Portable Temporary
SP-1131 - Handover and As- Equipment (4.1.4.9)
built documentation PR-2160 Pre Start-up Audit
(4.1.4.10) (4.1.4.3)
PR-1001c - Temporary
Override of Safeguarding
System Procedure (4.1.4.11)
PR-1073 – Gas Freeing,
Purging and Leak Testing of
Process Equipment and
Pipework (4.1.4.12)
PR-1079 – Gas Freeing and
Purging of Petroleum
Storage Tanks (4.1.4.13)
PR-1232 - Design Integrity
Review Procedure (4.1.4.14
SP-1127 - Layout of plant
equipment and facilities
(4.1.4.14 )
SP-2062 - Demonstrating
ALARP HSE Specification:
Specifications for HSE Cases
(4.1.4.15)