You are on page 1of 20

SEAHORSE 35

Designtiltag for reducering af brændstofsforbrug og


EEDI for en moderne 35,000 DWT Bulk Carrier

ved Michael H Schmidt

Miljøkrav til Skibsfarten - Skibsteknisk Selskab – Oktober 2012

Oct. 2012 Schmidt Maritime 1


Agenda

• Introduction
• SEAHORSE 35 – 35,000 DWT Handysize Bulk Carrier
• Hullform Optimization
• Main Engine Development
• Propeller Optimization
• Becker Mewis Duct ®
• Sea Trial Results
• Summary of Fuel Savings
• Summary of EEDI Development
• Future Work

Oct 2012 Schmidt Maritime 2


35k DWT Handysize Bulk Carrier

• SEAHORSE 35 Building Status


45 firm contracts at 9 Chinese yards are building SEAHORSE 35
14 SEAHORSE 35 delivered per October 2012

• SEAHORSE 35 – 35,000 DWT Handysize Bulk Carrier


Length (OA) = 180.0 m
Breadth = 30.0 m
Depth = 14.7 m
Scantling Draft = 10.1 m
C/H Capacity = 47,600 m3
DWT = 35,000 t
Design Speed = 14.0 knots

Oct 2012 Schmidt Maritime 3


35k DWT Handysize Bulk Carrier

Oct 2012 Schmidt Maritime 4


Performance Optimization Process

• Hullform
- Low resistance at whole draft range
- Equal wake field
- Space for large diameter propeller

• Main Engine
- Low SFOC
- Low RPM to enable a large diameter propeller

• Propeller
- Large diameter -> low load -> high efficiency
- High efficient propeller design

• Fuel Saving Devices


Becker Mewis Duct ®

Oct 2012 Schmidt Maritime 5


Hullform Optimization

Oct. 2012 Schmidt Maritime 6


Hullform Optimization

• Hullform development with FORCE 2006

• CFD analysis by FORCE

• Tanktest by FORCE, DK

• Slow vessel

• Wide draft range

• “High” Block Coefficient

• No Bulbous Bow

• Barge type stern

Oct. 2012 Schmidt Maritime 7


Hullform Optimization

• Performance Assessment by MARIN 2012


Conclusion :
Max 1,5% optimization potential

Oct. 2012 Schmidt Maritime 8


Propeller

• NPT Propeller (New Profile Type)

• Stone Marine, UK / Sumitomo Patent

• High propeller efficiency (+2%)

• Smaller optimal diameter (-4%)

Oct. 2012 Schmidt Maritime 9


Main Engine Development

1. Main Engine : MAN 5S50MC-C7.1 TI 4. Main Engine : MAN 5S50ME-B9.2 TII


- SMCR = 7.500 kW @ 121 RPM - SMCR = 6.050 kW @ 99 RPM
- NCR = 6.082 kW (81% SMCR) - NCR = 5.440 kW (86% SMCR)
- 5,54 m NPT Propeller - 5,9 m NPT Propeller + MEWIS Duct

2. Main Engine : MAN 5S50ME-B8.1 TII 5. Main Engine : MAN 5S50ME-B9.2 TII
- SMCR = 6.900 kW @ 110 RPM - SMCR = 6,050 kW @ 99 RPM
- NCR = 5.913 kW (85% SMCR) - SMCR = 4,700 kW (max output allowed)
- 5,8 m LIPS / 5,6 m NPT Propeller - NCR = 4.230 kW (90% SMCR)
- 5,9 m NPT Propeller + MEWIS Duct

3. Main Engine : MAN 5S50ME-B9.2 TII


- SMCR = 6.350 kW @ 99 RPM
- NCR = 5.670 kW (89% SMCR)
- 5,9 m NPT Propeller

Oct 2012 Schmidt Maritime 10


Main Engine Development

Main Engine Layouts


9.000

8.000

5S50MC-C7.1 TI
7.000
5S50ME-B8.1 TII
Main Engine Power [kW]

6.000 5S50ME-B9.2 TII

Version 1
5.000
Version 2

Version 3
4.000
Version 4/5

3.000

2.000
60 70 80 90 100 110 120 130
Main Engine Revolutions [RPM]

Oct 2012 Schmidt Maritime 11


Main Engine Development

Main Engine Efficiency - SFOC


176

174

172

170 Version 1
SFOC [g/kWh]

168 Version 2

166 Version 3

164 Version 4

162 Version 5

160

158

156
2.000 3.000 4.000 5.000 6.000 7.000
Main Engine Power [kW]

Oct 2012 Schmidt Maritime 12


Becker Mewis Duct ®

• Wave Equalizing Pre-Swirvel Duct

• Tanktests with duct at FORCE, DK and


SVA, Potsdam, Germany

• Becker Mewis Duct:

Tanktest results at 14,0 knots

- 4,1% Scantling Draft (T=10,1m)


- 3,3% Light Cargo Draft (T=9,0m)
- 5,2% Ballast Draft (T=5,5m)

Oct. 2012 Schmidt Maritime 13


Becker Mewis Duct ®

SEAHORSE 35 TANKTEST - 5,9 m NPT Propeller and Becker Mewis Duct ®


incl. 15% Seamargin and 1% shaftloss
8.000 32,0%
Scantling Draft (T=10,1m) w/o MD 30,0%
7.000 Scantling Draft (T=10,1m) w MD 28,0%
Design Draft (T=9,0m) w/o MD 26,0%
6.000 Design Draft (T=9,0m) w MD 24,0%
22,0%

M/E Power Saving [%]


Light Ballast (T=5,5m) w/o MD
Engine Power [kW]

5.000 20,0%
Light Ballast (T=5,5m) w MD
18,0%
4.000 16,0%
14,0%
3.000 12,0%
10,0%
2.000 8,0%
6,0%
1.000 4,0%
2,0%
0 0,0%
10,0 11,0 12,0 13,0 14,0 15,0 16,0
Speed [knots]

Oct. 2012 Schmidt Maritime 14


Tanktest vs Sea Trial

SEAHORSE 35 - FORCE Tanktest vs DDHI DD017 Sea Trial


8.000

Tanktest - Light Ballast

7.000
Tanktest - Light Cargo
Engine Power [kW]

6.000 Tanktest - Heavy Cargo

Sea Trial - Light Ballast


Corrected by MARIN
5.000
Sea Trial - Light Cargo
Corrected by MARIN

Sea Trial - Heavy Cargo


4.000
Corrected by MARIN

3.000
13,0 13,5 14,0 14,5 15,0 15,5 16,0

Speed [knots]

Oct. 2012 Schmidt Maritime 15


Tanktest vs Sea Trial

SEAHORSE 35 - Tanktest vs Sea Trials


6.500

6.000 Tanktest - Sea Trial Draft


5,54 m NPT Propeller

5.500
Tanktest - Sea Trial Draft
Engine Power [kW]

5,8 m LIPS Propeller


5.000
Sea Trial - 5,54 m NPT
Corrected by MARIN
4.500

Sea Trial - 5,80 m LIPS


4.000 Corrected by MARIN (+1,22%)

Sea Trial - 5,80 m LIPS/BMD


3.500
Corrected by MARIN (-2,59%)

3.000
13,0 13,5 14,0 14,5 15,0 15,5

Speed [knots]

Oct. 2012 Schmidt Maritime 16


Summary of Fuel Oil Savings

SEAHORSE 35 Version 1 2 3 4 5
1. Main Engine Maker [-] MAN B&W MAN B&W MAN B&W MAN B&W MAN B&W
2. Main Egine Type [-] 5S50 5S50 5S50 5S50 5S50
3. Main Engine Mark [-] MC-C7.1 TI ME-B8.1 TII ME-B9.2 TII ME-B9.2 TII ME-B9.2 TII
4. Main Engine Tuning [-] High Load High Load High Load High Load Part Load
5. Propeller [-] 5,54 m NPT 5,80 m Wärts. 5,90 m NPT 5,90 m NPT 5,90 m NPT
6. Becker MEWIS Duct® [-] No No No Yes Yes
7. Design Speed 1) [knots] 14,0 14,0 14,0 14,0 13,0
8. SMCR2) [kW] 7.500 6.900 6.350 6.050 4.700
9. NCR3) [kW] 6.082 5.913 5.670 5.440 4.230
10. NCR verified by: [-] Sea trial Sea trial Tanktest Tanktest Tanktest
11. % of SMCR [%] 81% 86% 89% 90% 90%
12. NCR Index [-] 100% 97% 93% 89% 70%
13. SFOCNCR [g/kWh] 166,8 167,2 161,0 159,9 158,6
14. SFOC Index [%] 100% 100% 97% 96% 95%
15. M/E FOCMDO4) [mt/day] 24,3 23,7 21,9 20,9 16,1
16. FOC Index [%] 100% 97% 90% 86% 66%
1)
Design speed at scantling draft of 10,1 m
2)
NCR : Main engine power to reach design speed at scantling draft including 15% sea margin and 1% shaft loss
3)
M/E fuel oil consumption at NCR based on MDO (LCV 42,700 kJ/kg). M/E makers SFOC tolerance of 5% is not incl.

Oct. 2012 Schmidt Maritime 17


Summary of EEDI

SEAHORSE 35 Version 1 2 3 4 5
17. EEDI1) [g/DWTxnm] 6,53 6,23 5,60 5,32 4,50
18. EEDI Index [%] 100% 95% 86% 81% 69%
19. EEDI Base Line [g/DWTxnm] 6,54 6,54 6,54 6,54 6,54
20. EEDI blw. Base Line [%] 0% 5% 14% 19% 31%
1)
Main engine makers SFOC tolerance of 5% is included.

IMO Energy Efficiency Design Index (EEDI) - BULK CARRIERS


(EEDI Base Line = 961,79 x Capacity-0,477)
7,0
Phase 0 (-0%) from 1/1 2013
6,5 Phase 1 (-10%) from 1/1 2015
EEDI [g-CO2/DWTxnm]

Phase 2 (-20%) from 1/1 2020


6,0
Phase 3 (-30%) from 1/1 2025

5,5 Version 1
Version 2
5,0
Version 3

4,5 Version 4
Version 5
4,0
30.000 32.500 35.000 37.500 40.000
Capacity [DWT]

Oct. 2012 Schmidt Maritime 18


Future Work

• Full Spade Rudder vs Semi-spade Rudder Tanktests

• Optimal distance between propeller and rudder

• Trim Optimization Tanktests

• Sea Trial Results with Becker Mewis Duct ®

Oct. 2012 Schmidt Maritime 19


Thank you

Questions and comments are welcome.

Michael H Schmidt

T: +45 25 61 45 44

E: mhs@schmidtmaritime.dk

Oct. 2012 Schmidt Maritime 20

You might also like