I. EARTHWORKS:
Excavation of Column Footing, WF and
40.81 cu.m 500 20405
SW Footing
16.59 cu.m Backfilling of Excavated Materials 550 9124.5
Sub-total 6,250.00
V. ELECTRICAL WORKS:
VIII. FORMWORKS:
SUMMARY