You are on page 1of 1

ERBIL REFINERY

40,000 BPSD REFINERY COMPLEX


PLANT "B"
CABLE SCHEDULE COVER SHEET

Issue for Construction

March 15, 2011

Ventech Engineers Inc.

REVISION DESCRIPTION AREA CONFIDENTIAL SIGNATURE DATE

NO BY CHK APP DATE DESCRIPTION THIS DOCUMENT AND THE INFORMATION DRAWN LRS 07/27/09
ERBIL REFINERY PHASE II 40K BPSD CDU W/NAPHTHA TRAIN
CONTAINED HEREIN IS CONFIDENTIAL AND MAY NOT
0 LS TH MJ 3/17/11 APPROVED FOR CONSTRUCTION CHECKED TH 3/17/11
BE DISCLOSED TO ANY PERSONS OR COPIED OR
REPRODUCED EXCEPT AS PERMITTED IN WRITING APPROVED MJ 3/17/11 KAR GROUP PLANT B / UNIT GENERAL
BY VENTECH ENGINEERS INC. APPROVED COPYRIGHT 2010 VENTECH ENGINEERS INC.
ALL CONTENTS OF THIS DOCUMENT AND ALL APPROVED REVISION DESCRIPTION CABLE SCHEDULE COVER SHEET
COPIES OF IT ARE THE PROPERTY OF VENTECH SCALE
A = PRELIMINARY B = CLIENT APPROVAL JOB NUMBER DRAWING NUMBER REV.
ENGINEERS INC. AND IT'S CLIENT, AND ARE LENT
C = APPROVED FOR DESIGN
VENTECH ENGINEERS INC.
OUT ON THE EXPRESS CONDITION THAT THEY ARE
SUBJECT TO RETURN UPON DEMAND. 0 = APPROVED FOR CONSTRUCTION
NONE
PASADENA, TEXAS 77502 P.O. BOX 4261 4653-030 B000-EM-701 0

You might also like