BRINE TO HARBOUR PROJECT

SUB-CONTRACTOR
PETROL & GAS CONST.
CONTRACTOR

QCON
JOINT SUMMARY SHEET
CO.
Sub-Contractor Doc. No. Qcon Doc. No: Revision - Client Doc. No.:
Discipline: PIPING
Line No. Project Title
Location Client
Material Material Condition
Report No. Project Code Date

Surface Preparation Bonding Cement Fit Layer Main lamination Barcol


Lamination RFI No. Hardness
Joint No. NPS Date Laminato RFI No. Date Laminato Date Date Status
Initiated Laminator Laminator Test
Initiated r Initiated r Initiated

PGCC-JSS-000 Rev.00 Prepared by: JEC Perez


Additional remark(s)

PGCC REPRESENTATIVE QCON REPRESENTATIVE

SIGNATURE

NAME

DATE

PGCC-JSS-000 Rev.00 Prepared by: JEC Perez


NE TO HARBOUR PROJECT

UMMARY SHEET CLIENT


Worley Parsons / QPH

Client Doc. No.: Revision -

Contract No.
Date

Result RFI No. Laminati


on Size RFI No. Remark(s)

PGCC-JSS-000 Rev.00 Prepared by: JEC Perez


WPQ / QPH REPRESENTATIVE

PGCC-JSS-000 Rev.00 Prepared by: JEC Perez