 Objective
To synchronize my professional knowledge, experience and skills with the client
requirements to ensure mutual gains. Enjoy accepting challenges and learning new
skills. I look forward to provide my services efficaciously for your esteemed
organization.

 Specialties
  Experience of planning, scheduling, monitoring of Mega Projects (including Power
Plants, Infrastructures, Transportation and Buildings) projects in development of
Talal Ahmed Khan  
project EPC schedule by sequence of project, in conjunction with, choosing the
appropriate techniques and sequence, Illustration up plans and presenting schedules
B.S Civil Engineer, MEM Transportation & of work, by expert planning computer software P6 of all disciplines civil, mechanical,
Infrastructure, MBA Management electrical & I&C.

Destiny is not a matter of chance; it’s the matter of Choice. It’s


not the thing to be waited for; it’s the thing to be achieved! Self-Employed (PM/Primavera Consultant)
Technocon Associates
B-26 Block 3a Gulistan-e-Johar Karachi,Pakistan
About Me http://www.technoconassociates.com/ 13|11|2015
Position Held: CEO Till Date
 

Project: Green line BRTS from Municipal Park, Saddar to


Experience: 7 Years KESC Power House Chowrangi,Surjani,Karachi
Client: KIDCL
April, 4th,1990 Consultant: Engineering Associates (Pvt.) Limited
Date of Birth:
Package: Contract package # KAR/BRTS/GL/07 |Green Line
Age: 27 /Location: BRTS Bus Depot
Project Cost: 155.68 million PKR
Nationality: Pakistani Contractor: Zahir Khan & Brothers
  Duration: June,2017 to Apr,2018
Marital Status: Single Package: Contract package # KAR/BRTS/GL/06 |Green Line
/Location: BRTS Bus Stations
Dependents: Mother & 2 Sisters Project Cost: 217.20million PKR
Contractor: M/S Usmani JV Reliable
  Duration: June,2017 to Apr,2018
Place of Birth: Karachi
  Package: Contract package # KAR/BRTS/GL/08 |Green Line
Religion: Islam /Location: BRTS Bus Depot
Project Cost: 522.47 million PKR
N.I.C No: 42101-2328788-1 Contractor: Shams& Zain Meo Rajput Construction Co.
Duration: Aug, 2016 to Apr, 2018
Pak Driving License
35818 Package: Contract package # KAR/BRTS/GL/01 | RCC
No: /Location: Elevated Section Nazimabad Chowrangi to Guru
KSA Driving License Mandir
2339488088
No: Project Cost: 1.84 billion PKR
Passport No: WV4117881 Contractor: CRFG JV Matracon Pvt Ltd
Issue: 17 Jan 2011 Duration: Jan, 2016 to Dec,2017
Expire: 16 Jan 2016 Package: Contract package # KAR/BRTS/GL/UT01 | Water
/Location: Trunk Main (Dia 1200mm) from Nagan Chowrangi
Pakistan Engineering to Sakhi Hasan & Relocation of Pumping Station
Council (PEC) Reg Civil/31157 near KDA Chowrangi
No: Project Cost: 145 million PKR
Saudi Engineering Contractor: Mohammad Hassani Builders
Council (SEC) Reg 113828 Duration: Dec, 2015 to Aug, 2016 
No:
 
Project: Construction for Infrastructure Works at
DHA City Karachi
Contact Info   Sector:
Packages:
13, 14
1,2,3
 
B-26 Block 3a Gulistan-e-Johar, Client: DHA
  Consultant: Osmani & Company Pvt Ltd
  Karachi, Pakistan Contractor: Qasim Khan & Company
+923432566103, +9233312060870,   Duration: Jan, 2016 to June, 2018
+922134028529
    Our Project Planning & Monitoring P6 Services:
  +966554030957  Development of Tender Bid & Construction Level III, V Schedule in Primavera
  P6 & its monitoring & control through the project with proper sequence & logic
to ensure correct design, engineering, procurement, construction &
+971529491164 commissioning.
   Update schedule and progress monitoring & recording through reports, site
photographs and correspondences in Primavera P6.
engr.talalkhan  Attend progress meetings with clients, discuss & suggest technical proposals.
   Monitor and Issue EPC daily, weekly, monthly, S curves & check list Progress
engr.talalkhan@gmail.com reports.
 Preparation the 3 Weeks, 3 Months look ahead.
  technoconassociates@gmail.com  Progress variance analysis & Critical path analysis.
www.linkedin.com/  Issue areas of concern reports on weekly, monthly basis.
 Development of EPC manpower histogram planned & actual resources.
  ?sessionid=4121905277698048  Review and evaluate contractor’s schedules to determine compliance with
contract requirements.
www.technoconassociates.com  Preparing and presenting all presentations for higher
  management. Page 1 of 4
www.facebook.com/engr.talalkhan
www.facebook.com/technoconassociates
 
 
 
Consultancy Experience
Osmani & Company (Pvt.) Ltd.
Osmani House,245/2-K Block 6 PECHS,Karachi
http://www.osmani.com/ 13|11|2014
 
  Position Held: Project 14|12|2015
Scheduling/Monitoring Professional &
Assistant Project Manager
Teaching Experience Project: World Class Halal Slaughter House &
Meat Complex
Location: Near FFBL Plant ,Port Qasim Dhabeji
District Thatta
24|05|2014 Project Cost: 60 million USD
18|12|2017 Client: Fauji Fertilizer Bin Qasim Limited
End User: Fauji Meat Limited
Int Consultant: Beer & Associates
 Technocon |Corporate Trainings Duration: June, 2014 to June, 2016 
Project: Greater Karachi Bulk Water Supply
Primavera P6, MS Project, MS Office Scheme k-IV,Phase-1
B26 Block 3a Gulistan-e- Johar Karachi Location: keenjhar Lake to Karachi
www.technoconassociates.com Project Cost: PKR 22 billion ($273 million)
Client: Karachi Water & Sewerage Board
End User: Karachi Water & Sewerage Board
Duration: Feb, 2015 to Dec, 2020 
Responsibilities:
 PIMSAT | Institute of Higher  Prepare and update Master Programs (Detailed Project
Component Schedules – Level III) with a proper sequence & logic
Education, Karachi to ensure correct design, engineering, procurement, construction &
Main Shahra-e-Faisal opposite Regent commissioning.
Plaza Hotel, 177/2, IEP Building Karachi  Update schedule and progress monitoring & recording through
http://pimsat-khi.edu.pk/ reports, site photographs and correspondences in Primavera P6.
 Attend progress meetings with clients and Contractors discuss &
suggest technical proposals.
 Issue EPC daily, weekly, monthly, S curves & check list Progress
reports.
 Preparation the 3 Weeks, 3 Months, 2 Years look ahead.
 Progress variance analysis & Critical path analysis.
 Issue areas of concern reports on weekly basis.
 Indus University  Development of EPC manpower histogram planned & actual
resources.
Gulshan-e-iqbal Campus: ST-2D,  Review and evaluate contractor’s schedules to determine
Block-17,Adjacent to National compliance with contract requirements.
Stadium Gulshan-e-iqbal, Karachi.  Preparing and presenting all presentations for higher management.
www.indus.edu.pk/  Assist Project Manager and Management team using p6 and
Project management skills.
 KIV Project Design Schedule Preparation.

Kingdom of Saudi Arabia Experience


 Position Held: Visiting Faculty Arabian BEMCO Contracting CO.LTD
Courses: Riyadh, Kingdom of Saudi Arabia
 Irrigation Engineering www.arabianbemco.com 23|12|2012
 Transportation Engineering Position Held: Planning Engineer 03|05|2014
 Construction Management  

 Architecture & Town Planning Project: Conversion of Simple Cycle Gas Turbine
Units to Combined Cycle Gas Turbine
  Units at Power Plant 10, Riyadh, KSA
Location: PP10 Al Kharj , Riyadh
Project Cost: SR. 5,381,274,520/-
Client: Saudi Electricity Company (SEC)
  End User: Saudi Electricity Company (SEC)
Consultant: Worley Parsons Resource & Energy
Duration: Jan, 2013 to Dec, 2015 
Responsibilities:
 Development of WBS and its monitoring & control through the project.
 Prepare and update Master Programs (Detailed Project Component Schedules –
Level III) with a proper sequence & logic to ensure correct design, engineering,
procurement, construction & commissioning.
 Update schedule and progress monitoring & recording through reports, site
photographs and correspondences in Primavera P6.
 Attend progress meetings with clients, discuss & suggest technical proposals.
 Monitor and Issue EPC daily, weekly, monthly, S curves & check list Progress reports.
 Preparation the 3 Weeks, 3 Months look ahead.
 Progress variance analysis & Critical path analysis.
 Issue areas of concern reports on weekly, monthly basis.
 Development of EPC manpower histogram planned & actual resources.
 Review and evaluate contractor’s schedules to determine compliance with contract
requirements.
 Preparing and presenting all presentations for higher
management. Page 2of 4
 

      
 

   
 

 
United Arab Emirates Experience
Interest
Al Bawadi Building Contracting L.L.C
Ajman, United Arab Emirates
www.simranseed.tradeindia.com 16|02|2012
 Passion of Teaching Position Held: Project Engineer
20|11|2012
 

 Career Counseling Project: Construction & Maintenance of Several


Villas in Al Jurf ,Al Hamidiya , Ajman UAE
 Team Work, Public Speaking & Socializing  
,Internet Surfing, Reading, traveling & Location: Al jurf, Al Hamidiya Block 21 Ajman, UAE
Badminton Project Dh1.28 billion /-
  Cost: Sheikh Zayed Housing Programme
 Artistic Designing Client: Citizens of Ajman
End User: Municipality & Planning Department -Ajman
Consultant: Jan, 2011 to Nov, 2012 
 Interaction with Professionals. Duration:

 Table Tennis, Cricket, Chess, Gym, Responsibilities:


Internet surfing etc.  Part of planning, monitoring project budget and schedule planning.
 Attend progress meetings, discuss & suggest technical proposals.
 Maintaining organized and detailed project records.
 Video Conferencing ,Reading Novels
 Managing the cost analysis and cost control of project activities.
 Planning, scheduling and monitoring the projects in Primavera.
 Supervise and take all the technical & managerial decision during the
construction Phases of projects.
   Supervise construction of each facilities & maintain administration
   Resolve technical Issues while construction of Villas
 Submit invoices of Company to client each month and prepare claims.
Submit daily, weekly, monthly and check list reports, & generate two week
Communication Skills 
look ahead for each week.
 Coordinate and Joint visit with Municipality of Ajman Engineers for approval
I am a good negotiator & communicator before each concreting.
also I am fluent in:

 English language Pakistan Experience (Contractor)


 Urdu language LGC Global | Lakeshore Engineering Services
 Arabic language Detroit, Michigan, USA | Karachi, Pakistan
www.lgccorp.com
Position Held: Site Engineer / Project 01|01|2011
Engineer 31|12|2011
 

Project: USAID Funded Defense project includes


the planning, design and construction of 6
design/build projects:
1. Joint Maritimes Information Operation
  Center (JMIOC) & Temporary Facilities.
2.Navy Special Operation Training Center
(NSOTC), Gharo
600 (m) Firing Range with Building 1&2,Jump Tower,
 
  Breach Facility, Assault Course, Tube well 1&2
Location:
Manora lsland & Gharo Creek, Karachi
Project
$ 3,037,596/-
Cost:
US Air Force Center for Engineering and the
  Client:
Analytical Skills Environment (AFCEE)
Pakistan Navy SSGN
End User:
AECOM
Consultant:
 Data Analytics Skills in following Programs Jan, 2011 to Dec, 2011 
Duration:
 IBM Watson Responsibilities:
 Google Data Studio  Part of design, construction and engineering team for works in various
 MS Excel Dashboards designs activates in the projects. Attend progress meetings with clients.
 MS Power BI  Supervise and conduct the design review & weekly meetings from kick off till
  project hand over with Consultants (AECOM).
 Part of planning, monitoring project budget and schedule planning.
 Coordinate between the design Teams and construction teams ensuring that
the projects requirements are understand by both teams and that the project
deliverables satisfy the client requirements.
 Managing the cost analysis and cost control of project activities.
 Planning, scheduling and monitoring the projects in Primavera.
 Supervise and take all the technical & managerial decision during the design
& construction Phases of projects.
 Manage, maintain and upload submittal on organization LES web portal.
 Supervise construction of facilities & resolve technical Issues.
 Submit invoices of Company to client each month and prepare claims.
 Verify all sub-contractors, and petty contractors’ bills.
 Submit daily, weekly, monthly and check list reports, & generate 2,3 week
look ahead for each week.
 Prepare preliminary punch list, correct preliminary punch
list, prepare & submit As-built/CAD drawings. Page 3 of 4
 

 
 

   
 
 

 
Education (Academics)
Special Skills  
 

Institute of Business Management, Karachi


www.iobm.edu.pk | www.hec.gov.pk
Recognized: Higher Education Commission, Pakistan
 Excellent knowledge in field of civil
MBA (Management)
Engineering, Computer as well.  

Status: Currently Pursuing 01|11|2015


 
C.G.P.A: 3.38 20|11|2017
 Ability to prepare, analyze and  

read/interpret Structures.  

NED University of Engineering &Technology, Karachi


www.neduet.edu.pk | www.hec.gov.pk | www.pec.org.pk
 Excellent written and interpersonal skills.
Recognized: Higher Education Commission, Pakistan
Accredited :Pakistan Engineering Council,
 Strong Analytical Skills.  

Pakistan
MEM (Transportation & Infrastructure) 20|06|2014
 Driving, Typing C.G.P.A: 3.68 20|06|2016
Duration: 2.5 Years
 English & Urdu Debates & (RWS) Sir Syed University of Engineering &Technology,
Karachi
 Understand Arabic, Sindhi & Punjabi www.ssuet.edu.pk | www.hec.gov.pk | www.pec.org.pk
Recognized: Higher Education Commission, Pakistan
Accredited : Pakistan Engineering Council, Pakistan
B.S (Civil Engineering)
C.G.P.A: 3.16 01|01|2007
Duration: 4 Years
(Scholarships Awarded in each Semester)
31|12|2010
  Govt. Dehli College ,Karachi
Board: Board of Intermediate Education ,Karachi
IT Skills www.govtdehlicollegepk.com | www.biek.edu.pk
F.Sc (Pre-Engineering),
Grade: B 01|01|2005
Duration: 2 Years 31|12|2006
I have a good understanding of the
following software(s) Gulshan-e-Iqbal Secondary School, Karachi
Board: Board of Secondary Education ,Karachi
 Microsoft Word www.giss-khi.triopod.com | www.bsek.edu.pk
 Microsoft Excel Matriculation
 Microsoft PowerPoint 01|01|2003
Grade: A-one
 Microsoft Visio Duration: 2 Years 31|12|2004
 AutoCAD 2005


ETABS V 9.5
SAFE
Certifications
 

 Macromedia Dreamweaver Project Management Institute Inc., USA


 Macromedia Flash www.pmi.org | www.3deducators.com
 3dmax Training Institute (PDU): 3D Educators, Karachi
08|06|2016
 

Certification in Project Management


 Adobe Photoshop Professional Till Date
 Arif Kasim Software for Designing Status: Currently pursuing
 Primavera P6 IPECC Consultants, Karachi
 MS Project 2010 www.ipeccconsultants.com | www.sdckarachi.org.pk
Accredited : Skill Development Council Karachi
Advanced project management by using 03|05|2010
Primavera Enterprise 6.0 & MS Project 28|07|2010
Computer Collegiate
www.computercollegiate.com.pk
Certification in Microsoft Office 15|06|2006
MS Word, MS Excel, MS PowerPoint. 15|08|2006
MS Access, MS Visio, MS Project.

Research & Projects


 

Sir Syed University of Engineering &Technology, Karachi


www.ssuet.edu.pk
Mini Projects (Undergraduate Projects)
 
 Cost analysis in subject of Quantity surveying.
 
 Design model of Beijing Airport (China).
 
 Designing Of Highway Drainage System in MS Excel
 
 Design of retaining wall
 
 Design of water tank
   Design of Beam
   Design of Two way Slabs
 
 Design a model of Shanghai airport china
 
Final Year Project (Undergraduate Research)
 
 Construction & Project Management of 01|01|2007
Regent Plaza Flyover Intersection Main
Sharah-e-Faisal Karachi.
31|12|2010
 
TK-CV version: 1.4
References
Will be furnished upon request.
Last Modified: 18|12|2017

 
 
Page 4 of 4
 