You are on page 1of 3

Bill No.

4 - Sewerage Reticulation

Item Description Quantity Unit Rate Amount


RM RM

Trench Excavation
4.1 (i) Trench excavation of sewer pipe for depth exceeding
1.5 m but not exceeding 2.0 m including part backfill
on completion, compaction, removal of surplus,
shoring and/or sheet pile where necessary:-
(a) 225mm dia V.C. pipe 601 lin.m 20.00 12,026.00
(b) 300mm dia V.C. pipe R.O lin.m 20.00

(ii) -ditto- exceeding 2.0m but not exceeding 3.0m


(a) 225mm dia V.C. pipe 596 lin.m 26.00 15,485.60
(b) 300mm dia V.C. pipe 105 lin.m 20.00 2,104.00

(iii) -ditto- exceeding 3.0m but not exceeding 4.0m


(a) 225mm dia V.C. pipe 224 lin.m 55.00 12,325.50
(b) 300mm dia V.C. pipe 113 lin.m 20.00 2,256.00

(iv) -ditto- exceeding 3.0m but not exceeding 4.0m


(a) 225mm dia D.I.(Ductile Iron). Pipe R.O lin.m 80.00
(b) 300mm dia V.C. pipe 211 lin.m 20.00 4,220.00

4.2 Extra over item 4.1 for trench excavation in mettalled road. R.O lin.m 75.00
Rate to include cutting of mettalled pavement with diamond
cutter, reinstatement of mettalled road with 50mm thick sand
blanket, 300mm thick crusher run, 50mm thick binder
course and 60mm thick wearing coarse.

4.3 Ditto ~ for trench excavation under existing road side drains. R.O Lump Sum 2,000.00
Rate to include reinstatement of road side drain.

4.4 Ditto ~ for trench excavation under existing main drains. R.O Lump Sum 1,000.00
Rate to include reinstatement of pudu cut main drain.

Pipe Laying

Notes : -
All sewer with diameter less than 450mm shall be
vitrified clay pipe (VCP) with flexible joint and comply
with M.S 881 Part 1 1991, M.S. 1061;1986.
Foundation base of sewer must be compacted with
crushed run.

All sewer with diameter 450mm and above shall be


centrifugal spun reinforced concrete pipe (RCP) of
class Z. All RCP shall be internally line with 12mm
thick high alumina cement mortar. All pipe joints with
flexible rubble rings joints.

4.5 Supply and lay sewer pipes complete including


jointing, concrete/granular bedding, haunching all as
specified
(a) 225mm dia V.C. pipe (Class A bedding) 1,421 lin.m 105.00 149,205.00

(b) 300mm dia V.C. pipe (Class A bedding) 429 lin.m 100.00 42,900.00

4.6 Connection to Existing Mainhole


Allow for connection of VCP pipe to existing manhole. Lump Sum 1,000.00 1,000.00
Rate to include reinstatement and make good of
existing manhole.

Carried Forward 241,522.10

BQ 4 - 1
Bill No. 4 - Sewerage Reticulation

Item Description Quantity Unit Rate Amount


RM RM
Brought Forward : 241,522.10

Precast Concrete Manhole

4.7 Excavate, supply and construct precast concrete


manholes complete including lean concrete, Grade
20 cast in-situ concrete ring base, building in pipes,
benching, precast r.c. chamber, Grade 20 mass
concrete surround, formwork, stainless steel steps,
precast r.c. cover slab complete as detailed and
shoring and/or sheet pile where necessary
during construction.
(manhole cover and frames to be paid separately)

(i) Manhole type 1 with chamber diameter 1200mm


(for sewer pipe 225mm & 300mm)

(a) below ground level to invert level not exceeding 2.0m 14 no 2,000.00 28,000.00
(b) ditto exceeding 2.0m but not exceeding 3.0m 11 no 2,800.00 30,800.00
(c) ditto exceeding 3.0m but not exceeding 4.0m 5 no 3,300.00 16,500.00
(d) ditto exceeding 4.0m but not exceeding 5.0m 4 no 3,301.00 13,204.00

4.8 Supply and fix the following for manhole


backdrop including excavation:

(a) D.I. Tee 225mm x 225mm dia including N/A no 150.00


M.S. cover plate

(c) 90 degree medium D.I. Bend 225mm dia. N/A no 20.00

(e) D.I. Straights 225mm dia N/A lin.m 60.00

(g) concrete grade 15 mix including formwork N/A cu.m 70.00

4.9 Supply and fix Heavy Duty ductile iron manhole 34 no 440.00 14,960.00
covers and frames as specified

Carried Forward 344,986.10

BQ 4 - 2
Bill No. 4 - Sewerage Reticulation

Item Description Quantity Unit Rate Amount


RM RM
Brought Forward : 344,986.10

Testing of Sewer Line

4.6 (a) Carry out test for straightness and obstruction on all 1 Lump Sum 2,000.00 2,000.00
sewer lines as specified in Clause 4.3(a) of Section 5 of
Specification

(b) Carry out water testing on all sewer lines as specified in 1 Lump Sum 2,000.00 2,000.00
Clause 4.3(b) of Section 5 of Specification

(c) Carry out air testing on all sewer lines as specified in N/A
Clause 4.3(c) of Section 5 of Specification

(d) Carry out C.C.T.V. Test and submission of test report for
sewer lines as directed by S.O. representative or IWK/JPP

(i) 225mm dia. V.C. pipe 278 lin.m 25.00 6,937.50

4.7 Excavate beyond foundation level as directed by the


S.O. and backfill with selected material (Provisional) Rate only cu.m

Service Connection

4.8 (a) Excavate, supply and lay 150mm dia. V.C.


service pipe in class A bedding, 225mm dia. x
150mm dia. v.c. 'Y' junction including concrete
thrust block, 150mm dia. x 45 degree v.c. short
bend, end cap at location as directed by S.O. (Provisional)
complete as shown on the drawings 91 no 450.00 40,950.00

(b) Supply and install Marker complete as shown on the Rate Only no 50.00
drawings

(c) To excavate, supply and construct last manhole within Rate Only no
housing lot at the depth of 1.35m as shown on the
drawings

d) To supply and install end cap and install marker to D.I pipe 1 L.s 165.00
for future connection to last manhole of P.S.No.4

IWK Inspection

4.9 Allow for liasing with IWK/JPP for interim inspection 1 Lump Sum 4,000.00 4,000.00
during construction and final inspection for
handing over

Total Carried To Summary 400,873.60