You are on page 1of 11

Mobile : +62 81372914599

Curriculum Vitae Email : yonaraandi@yahoo.com or


andiyonara@gmail.com

ANDI YONARA
Personal Data Place/Date of Birth : Medan / March 11th 1973
Nationality : Indonesian
Status : Married
Religion : Moslem
Address : Kav-Flamboyan Blok. H-90
Kec.Sungai langkai, Batam – Indonesia

Qualification: QA/QC Welding Inspector and Production Supervisor


Profile
A highly motivated and dynamic individual, creative, fully of ideas and
intention toward improvements, capable to work independently and as at team either,
easily to communicate among all levels of people Good team player and Multitasking
capabilities. Proven initiative and ability to work with minimum supervision,
excellent organization. Experience with many customs and cultures has given the
ability to work with people of different background.

QUALIFICATION AND COURSE/TRAINING ATTENDANCE


1. Certificated Welding Inspector MIGAS by Ikbal M-Yos Batam - Indonesia
2. Certificated Liquid Penetrant Test by dB School Batam - Indonesia
3. Certificated Magnetic Particle Test by dB School Batam - Indonesia
4. Certificated Ultrasonic Test by dB School Batam - Indonesia
5. Certificated Radiographic Interpretation by dB School Batam - Indonesia
6. Certificated Quality Management System, Internal Audit Training Base on ISO 9001 - 2002
at PT.Bangun Adyabahan Perkasa by Surveyor Indonesia
7. Certificated Best HSE Performance Award From PT Meindo Elang Indah
8. Certificated Inplemention ISO 9000 – 2000, Certified by SGS ICS Batam - Indonesia

PROFESIONAL WORKING EXPERIENCE

A. Company : PT. SUCOFINDO, BRANCH JAKARTA


Period : Sept 2018 – Oct 2018
Position : QC INSPECTOR
Location : PT.SULFIDO ADIUSAHA(CILIGON)
Project : MAINTENANCE UNIT CHLOR ALKALI (SHUTDOWN)
Owner : PT.SULFIDO ADIUSAHA

Responsibilities :
 Check and monitor Replacement equipment before/ after install
 Check and monitor Leak Test as per request owner
 Check and monitor condition material or equipment still reasonable at utilizes or have at
procedures appropriate replacement
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

 To control all NDT request and ensure all request items (Joint Number)
 Suitable with weld Map, shop drawing and cutting plan.
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept and sent to Sulfindo Adiusaha for further review
 Updated WSMT (Welding Summary) and provide all completed report for release.

B. Company : PT. SUCOFINDO, BRANCH - CIRIBON


Period : Sept 2018 – August 2018
Position : QC INSPECTOR
Location : PERTAMINA BALONGAN
Project : PIT STOP 2018 (SHUTDOWN)
Owner : PERTAMINA RU-IV

Responsibilities :
 Check and monitor Replacement equipment before/ after install as per drawing
 Check and monitor Leak Test as per request owner
 Check and monitor condition material or equipment still reasonable at utilizes or have at
procedures appropriate replacement
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept and sent to Pertamina RU-IV for further review

C. Company : PT. BANDAR ABADI SHIPYARD


Period : August 2017 – April 2018
Position : SUPERVISOR COMMISSIONING
Location : BATAM - INDONESIA
Project : HARBOUR TAG 32M (TRANSCO NURI&WALET)
Owner : PERTAMINA CONTINENTAL.

Responsibilities :
 Supervise, monitor, check, control and report progress the Installation of Mechanical Equipment.
 Coordinate with site installation team and process team for installation, testing and commissioning.
 Knowledge of procedures required for preparation such as, Documentation, Pre-Commissioning
activities, Interaction with Vendors / Contractors, and commissioning activities.
 Pre-commissioning and Commissioning activities consist of Preparation system complete Punch-
list, P & ID check, Hydro & Pneumatic testing, Flushing, Blowing, Loop Examination, and
Functional Inspection
 Required also teach the system crew on board before sailing
 Supervising and maintaining the safety of the installation by implementing safety practices and
procedures established by the shipyard.

D. Company : PT. WASCO ENGINEERING


Period : 04 Dec 2014 Until to 03 Oct 2016
Position : QA/QC- WELDING INSPECTOR
Location : BATAM - INDONESIA
Project : POWER GENERATOR MODULE-KRAKEN FPSO
Client/Owner : WARTSILA/BUMI ARMAD BTD.

Responsibilities :
 Received and review all NDT report (UT, MPI, RT) before submit to Wartsila and BAB for
further review
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

 To control all NDT request and ensure all request items (Joint Number, Piece Mark and etc)
 Suitable with weld Map, shop drawing and cutting plan.
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept and sent to Wartsila and BAB for further review
 To control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder.
 To follow-up Open Action list if any customer audit findings or NCR by Client.
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 To perform and support Visual inspection if any production request.
 Check dimensional check inspection report (before and after welding) and marking cutting report
before sent to Wartsila
 Review Welder, Fitter, and Equipment list.
 Ensure all ITP is working Well.

C. Company : PT.MENCAST
Period : 24 Dec 2013 Until to 28 Nov 2014.
Position : QA/QC- WELDING INSPECTOR
Location : BATAM- INDONESIA
Project : MUD TANK PROJECT
Owner/ Client : PERTAMINA DRYLING

Responsibilities :
 Running fit-up inspection for pipe, hull and structure before welding.
 Received and review all NDT report (UT, MPI, RT) before submit to Pertamina Dryling.
 To control all NDT request and ensure all request items (Joint Number, Piece Mark and etc)
 Suitable with weld Map, shop drawing and cutting plan.
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept and sent to Pertamina Dryling for further review
 To control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder.
 To follow-up Open Action list if any customer audit findings or NCR by Client.
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 To perform and support Visual inspection if any production request.
 Check dimensional check inspection report (before and after welding) and marking cutting report
before sent to Pertamina Dryling Review Welder, Fitter, and Equipment list.
ensure all ITP is working Well.

D. Company : PT.Mc CONNEL DOWELL


Period : 24 April 2013 Until 23 August 2013.
Position : QC- WELDING INSPECTOR
Location : BATAM- INDONESIA
Project : APACHE JULIMAR DEVELOPMENT PROJECT
- Displacement Initiator Type 1 (40 Units)
- Displacement Initiator Type 2 (4 Units)
Owner/ Client : ALLSEA.
.
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

Responsibilities :
 check dimensional check inspection report (before and after welding) and marking cutting report
before sent to All sea
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept and sent to All sea
 is suitable with weld Map, shop drawing and cutting plan.
 To control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder.
 To follow-up Open Action list if any customer audit findings or NCR by Client.
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 To perform and support Visual inspection if any production request.

E. Company : PT.WORLD WIDE EQUIPMENT


Period : 26 Feb 2013 Until 26 March 2013
Position : QA/QC-WELDING INSPECTOR
Location : BATAM- INDONESIA
Project : ICHTHYS JETTY
Owner/ Client : BAM INTERNATIONAL/CLOUGH J.V

Responsibilities :
 check dimensional check inspection report (before and after welding) and marking cutting report
before sent to BAMCLOUGH
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept and sent to BAMCLOUGH for further review.
 To control all NDT request and ensure all request items (Joint Number, Piece Mark and etc) is
suitable with weld Map, shop drawing and cutting plan.
 control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder.
 Received and review all NDT report (UT, MPI, RT) before submit to BAMCLOUGH for further
review
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 Perform and support Visual inspection if any production request.
 Perform Welding machine calibration if any new welding machine coming and provide internal
machine calibration certification for approval by BAMCLOUGH
 Ensure all ITP is working Well.
 Review Welder, Fitter, and Equipment list.
 Review any new WPS before release to production
 Follow-up Open Action list if any customer audit findings or NCR by Client.

F. Company : SYNCO SYNERGY


Period : July 2011 Until to Jan 2013
Position : QA/QC- WELDING INSPECTOR
Location : BATAM - INDONESIA
Project : MUBADALA OIL COMPANY
- Wellhead Platform Jacket (WHP) - 3 Legs
- Process Quarter Platform Jacket (PQP) – 4 Legs
Owner/ Client : Pearl Oil Company with PT. Maindo Engineering as Main Contractor.
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

Responsibilities :
 Received and review all NDT report (UT, MPI, RT) from BKI as third Party before submit to PT
Meindo Elang Indah and Pearl Oil for further review
 Control all NDT request and ensure all request items (Joint Number, Piece Mark and etc)
 Provide Weekly Welder and Welding performance and Repair rate and coordinate to welder
supervisor as to remove and sent welder who create repair above 5 % to welding school.
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept and sent to PT Meindo Elang Indah and Pearl Oil for
further review.
 Control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder.
 Follow-up Open Action list if any customer audit findings or NCR by Client.
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 Review Daily welding Monitoring and recorded by production before submit to PT Meindo Elang
Indah
 Check dimensional check inspection report (before and after welding) and marking cutting report
before sent to Meindo
 To ensure all ITP is working Well.
 Perform Welding machine calibration if any new welding machine coming and provide internal
machine calibration certification for approval by PT Meindo Elang Indah and Pearl Oil.
 To perform and support Visual inspection if any production request.
 Review any new WPS before release to production
 Review Welder, Fitter, and Equipment list.
 Support Welder test and running new WPS if any.

G. Company : PT.BUNA TAMA INDAH PRIMS


Period : Dec 2010 Until July 2011
Position : QA/QC- WELDING INSPECTOR
Location : BATAM - INDONESIA
Project : RIG MUD TANK SYSTEM PROJECT
Owner/ Client : NATIONAL OILWELL VARCO

Responsibilities :
 Running fit-up inspection for pipe and structure before welding.
 Received and review all NDT report (UT, MPI, RT) before submit to NATIONAL OILWELL
VARCO
 To control all NDT request and ensure all request items (Joint Number, Piece Mark and etc)
 is suitable with weld Map, shop drawing and cutting plan.
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept and sent to NATIONAL OILWELL VARCO
 for further review
 To control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder.
 To follow-up Open Action list if any customer audit findings or NCR by Client.
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 To perform and support Visual inspection if any production request.
 check dimensional check inspection report (before and after welding) and marking cutting report
before sent to NATIONAL OILWELL VARCO
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

 Review Welder, Fitter, and Equipment list.


ensure all ITP is working Well.

H. Company : PT.SWIFT RESOURCES INTERNATIONAL


Period : Feb 2010 Until Dec 2010
Position : QC- WELDING INSPECTOR (PIPING)
Location : BATAM - INDONESIA
Project : GAJAH BARU PROJECT
Owner/ Client : PRIMIER OIL NATUNA SEA B.V, undertaken PT.SMOE

Responsibilities :
 Prepare Fit-up and Visual Inspection request after getting production request then provide final
report after result Accept and sent to Some QC for further review.
 control all NDT request and ensure all request items (Joint Number, Piece Mark and etc) is
suitable with weld Map, shop drawing and cutting plan.
 Provide Weekly Welder and Welding performance and Repair rate and coordinate to welder
supervisor as to remove and sent welder who create repair above 5 % to welding school.
 control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder.
 follow-up Open Action list if any customer audit findings or NCR by Client.
 Review Daily welding Monitoring that recorded by production before submit to Some
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 perform and support Visual inspection if any production request
 Review Welder, Fitter, and Equipment list.
 Support Welder test and running new WPS if any.

I. Company : PT BANGUN ADYABAHAN PERKASA


Period : Oct,2008 Until Jan,2010
Position : QA/QC-COORDINATOR
Location : BATAM - INDONESIA
Project : a. FPSO JUBILEE FIELD Project – MODULE for ~ GAS PROCESSING
MODULE(1S)
• INLET SEPARATION MODULE(2P)
• CRUDE SEPARATION MODULE(3P)
b. TUPI - FPSO Cidade de Angra Dos Reis MV22- MODULE for ~CO2 (4S)
c. WARSILA BRAZILE Project
EsvoirIvoirien FPSO undertaken from Oak well Engineering International /
PROSAFE Project – Module for LP Gas system Upgrade
d. KG GAS DEVELOPMENT PROJECT( KAKAP FIELD )
Project – Pipe Line for ~GAS.
Owner/ Client : MODEC and STAR ENERGY, undertaken PT.VME

Responsibilities :
 Making welding Map for at review goes to VME and at signature, To control all NDT request and
ensure all request items (Joint Number, Piece Mark and etc) is suitable with weld Map, shop
drawing and cutting plan
 Received and review all NDT report (UT, MPI, RT) from NDT as third Party before submit to
Client for further review.
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

 Provide Weekly Welder and Welding performance and Repair rate and coordinate to welder
supervisor as to remove and sent welder who create repair above 5 % to welding school.
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accepted.
 Control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder.
 Follow-up Open Action list if any customer audit findings or NCR by Client.
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 Perform and support Visual inspection if any production request.
 Perform Welding machine calibration if any new welding machine coming and provide internal
machine calibration certification for approval
 Review any new WPS before release to production
 Review Welder, Fitter, and Equipment list.
 Support Welder test and running new WPS if any

J. Company : PT. NINDA PRATAMA VREISINDO


Period : June 2008 Until Sept 2008
Position : QA/QC-WELDING INSPECTOR
Location : BATAM - INDONESIA
Project : BLACKTIP PROJECT
Owner/ Client : SAIPEM

Responsibilities :
 Received and review all NDT report (UT, MPI, RT) from NDT as third Party before submit to
Client Oil for further review.
 To control all NDT request and ensure all request items (Joint Number, Piece Mark and etc) is
suitable with weld Map, shop drawing and cutting plan
 Provide Weekly Welder and Welding performance and Repair rate and coordinate to welder
supervisor as to remove and sent welder who create repair above 5 % to welding school
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept
 To control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder
 To follow-up Open Action list if any customer audit findings or NCR by Client.
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 To perform and support Visual inspection if any production request.
 Perform Welding machine calibration if any new welding machine coming and provide internal
machine calibration certification for approval
 Review any new WPS before release to production
 Review Welder, Fitter, and Equipment list.
 Support Welder test and running new WPS if any
 To check dimensional check inspection report (before and after welding) and marking cutting
report before sent to Saipem.
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

K. Company : PT. UTRACO MARINE & OILFIELD


Period : January 2008 until July2008
Position : QA/QC- WELDING INSPECTOR
Location : BATAM - INDONESIA
Project : MONTARA FIELD DEVOLOPMENT PROJECT - FPSO
Owner/ Client : TANGKER PASIFIC undertaken PT GPS.

Responsibilities :
 Received and review all NDT report (UT, MPI, RT) from NDT as third Party before submit to
Client Oil for further review.
 To control all NDT request and ensure all request items (Joint Number, Piece Mark and etc) is
suitable with weld Map, shop drawing and cutting plan.
 Provide Weekly Welder and Welding performance and Repair rate and coordinate to welder
supervisor as to remove and sent welder who create repair above 5 % to welding school
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept
 To control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder
 To follow-up Open Action list if any customer audit findings or NCR by Client.
 To perform and support Visual inspection if any production request
 Perform Welding machine calibration if any new welding machine coming and provide internal
machine calibration certification for approval
 Review any new WPS before release to production
 Review Welder, Fitter, and Equipment list
 Support Welder test and running new WPS if any
 dimensional check inspection report (before and after welding) and marking cutting report before
sent to GPS.

L. Company : PT. SEMPEC INDONESIA


Period : August 2006 until to September 2007
Position : QA/QC- WELDING INSPECTOR
Location : BATAM - INDONESIA
Project : POLENG PROCESS PLATFORM
Owner/ Client : CODECO

Responsibilities :
 Received and review all NDT report (UT, MPI, RT) from NDT as third Party before submit to
Client Oil for further review.
 To control all NDT request and ensure all request items (Joint Number, Piece Mark and etc) is
suitable with weld Map, shop drawing and cutting plan.
 Provide Weekly Welder and Welding performance and Repair rate and coordinate to welder
supervisor as to remove and sent welder who create repair above 5 % to welding school
 Prepare Fit-up Inspection and Visual Inspection request after getting production request then
provide final report after result Accept
 To control and monitor Electrode baking oven and flux/Electrode holding baking temperature and
certificate before using by welder
 To follow-up Open Action list if any customer audit findings or NCR by Client
 Updated WSMT (Welding Summary and Material Traceability) and provide all completed report
for release note before Erection or Roll Up.
 To perform and support Visual inspection if any production request.
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

 Perform Welding machine calibration if any new welding machine coming and provide internal
machine calibration certification for approval.
 Review any new WPS before release to production
 Review Welder, Fitter, and Equipment list.
 Support Welder test and running new WPS if any
 To ensure all ITP .
 To check dimensional check inspection report (before and after welding)
and marking cutting report before sent to Codeco.

M. Company : PT. NIPPON STEEL


Period : Sept 2004 until Dec 2006
Position : WELDER FCAW(SS)
Location : BATAM - INDONESIA
Project : SISI NUBI FILD PROJECT (Phase I Fabrication Top Side - MWPN2
(Manifold Wellhead Platform Sisi Nubi 2 ) – Total I & P.
Owner/ Client : TOTAL

Responsibilities :
 Before Welding ensure material clear and dry.
 Utilizing Procedure bases WPS that at advises
 Ensure instillation before welding and Welding wiring accords WPS
 Utilize shielding before weld
 avoid high repaired

N. Company : PT. Mc DERMOTT


Period : May 2001 until April 2004
Position : WELDER FCAW(SS)
Location : BATAM - INDONESIA
Project : DOMINION PROJECT “ Tower Devil “ Sparkhul.
BAYU UNDAN PROJECT, FPSO wellhead A & B Project, Modules
Owner/ Client : CONOCO BELANAK

Responsibilities :
 Before Welding ensure material clear and dry.
 Utilizing Procedure bases WPS that at advises
 Ensure instillation before welding and Welding wiring accords WPS
 Utilize shielding before weld
 avoid high repaired

O. Company : PT. CANANG INDAH


Period : August 1992 until February 2001
Position : SUPERVISOR MAINTENANCE
Location : MEDAN - INDONESIA
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

Responsibilities :
An affiliate company of Canang Indah, produce board particle.
Responsibility to ensure fabrication activity is carried out as per approved construction Perform
inspection on fabrication activities before, during and after complete Repair monitoring and reporting
on the quality of document.
 Trouble shooting of production machine, e.g. Boiler
 hot pres machine, forming line machine, chipper
 machine, blender & water cooling machine, glue
 Glue kitchen, cooling & sizing machine, dryer & burning machin
 Period checking and maintain of production machine
 Make sure good willing machine

SUMMARY OF SKILLS
Since 1993 up to 2001 has been involving in Industry Particle board as Supervisor Maintenance &
fours year as Welder Craftsman to Mc Dermott and Nippon Steel batam. More than Ten years as
QA/QC has been involving in Oil & Gas Company, Pipe Line inspection, fabrication and Construction
of Piping. Have an experienced interpretation standard (ASME, ASTM, AWS, API, and ANSI),
specification, procedure and drawing. Understand of work sequence for both fabrication and
installation including pre-commissioning prior to start up at onshore project. Work under pressure
flexible on duties to perform accept responsibility, work long hour committed to going extra mile to
completed job correctly on time, work well as team player or have worked on own or prepared to work
in busy and isolated area. Have strong skill level of supervision, inspection, technical problem solving.
Interpersonal skills, particular the ability to listen and understand co-worker, client problem and point
of view committed to being professional in work displaying in integrity at all time. Sept 2017 as
Supervisor Commissioning at Bandar Abadi Shipyard.

COMPUTER AND OTHERS SKILL


1. To be able to operate Microsoft Office Windows (Excel, Word)
2. Having capability and speed to type by using 10 fingers..

I declare that this curriculum vitae written based on the true. And I will be fully responsible for any
false information given.

Batam, Dec 24th 2018

Signed
Andi Yonara
Mobile : +62 81372914599
Curriculum Vitae Email : yonaraandi@yahoo.com or
andiyonara@gmail.com

You might also like