No Performance Standard requirement Vessel Interim Measures Permanent Measures


Status(Y/N)
1. If vessel is pre 2007, an engineering Address in risk assessment, ensure that To be addressed in the next docking of
assessment of fitting must be lines are not stressed beyond WLL vessel
planned
2. All lines on board must be of 100- The ship design MBL is EN number for Lines to be retired in due course or
105% of ship design MBL existing vessels. If lines of higher MBL are landed as per discussion with
provided ensure they are deployed from superintendent if they cannot be
mooring winches where they are protected deployed with mooring winches
by the primary brake setting. Do not deploy
these lines from mooring bit
3. Fairleads used alternatively with Ensure fairleads are checked before Procure SS type insert chafe protection
wires and ropes must be provided deployment of mooring lines from fairleads.
with stainless steel type chafe Use available chafe protection measures on
protection board
4. Mooring bit must be placed 1.8 Ensure the area is identified as hazardous No Change
meters from fairlead for caught in between injury and addressed
in MSMP and familiarization record
5. Staples must be of 50% of ship Thorough check for any deformation and Consider to carry out engineering
design MBL damage. When required deploy the rope analysis in next docking.
stopper using the mooring bit
6. D-Shackles in use must be of 50% Change D- Shackles on board as per Procure new D-Shackles
ship design MBL requirement. Use rope stopper from the
mooring bit in the interim period
7. Winch working platform must extend Crew familiarization, cautions to be Extend platform to required height and
to full length of the winch , must be exercised during mooring operations width at the first available repair period
of same level and the width must be
sufficient for 2 persons to move side
by side and behind one another
8. Mooring winch pull load must be Consult with superintendent if design pull is Adjust of winch settings in the next
between 22-33% of ship design MBL less. For pull more than 33% winch must be planned repair period. Communication
operated with care. Winch can pull up to with manufacturers
50% ship design MBL and hence this is not
critical
9. The rendering load of the winch If the load is more the line can tensioned
must be 50% of ship design MBL beyond it WLL.
10. Line light speed of winch must be to Check vessel parameters and ensure any Possible changes in consultation with
be 45m/s differences are known manufacturer
11. Drum capacity must be sufficient to Ensure measures are in place for Possible changes in drum flange
have 1.5 times rope dia gap after preventing the rope from getting caught in diameter during next repair period
complete winding between drum and the gear
12. The drum size must be such that line Ensure lines are checked for crush damage No change / Consider systematic
is accommodated in 5 layers or in 8 during inspections and full length of line is replacement of lines of lower diameter
layers in case of high capacity checked
drums
13. Winches must be provided with Check mild steel bands frequently , de-rust Consider to install SS band lining in next
stainless steel bands and inspect as per PMS docking
14. Securing point of pull back tug must Inform tug when the securing point is not 4 No change
be 4 meters inboard of the fairlead meters inboard and the eye may lie in the
fairlead
15. The line lead from the fairlead to No interim measures and must be done NA
securing point to the mooing winch immediately. The lead must be as straight
must be painted in a distinctive as possible. The lead must be painted on
color for ready identification deck
16. Bow mooring arrangement Current certificate number must be marked Consult with superintendent for
certification on the Chain stopper certification of Chain stopper and
fairlead in next docking
17. Safe working loads on the Mooring No Change / Consider marking the load in Markings to be changed to T in next
fittings must be marked in T (Not in T using paint docking
KN)
18. Lighting in the mooring area must Address lack of lighting in additional Additional lighting where necessary to
be sufficient that no supplementary controls in vessel risk assessment be installed in identified locations during
lighting is necessary for example to next repair period
clutch/declutch or any other control
area
19. Mooring winch and motors must be Identify areas under pressure, moving Adequate shield plates to be installed ,
installed with shields to protect the machinery part, shaft or areas which can including hand rails or support rails
operator from injury cause an injury from flying projectiles in where necessary during the next
case of structural failure of motor during planned repair
operations. Such areas must be kept clear
of. Training of personal to be carried out
such that they are aware of the hazards.