You are on page 1of 1

EHS RISK ASSESSMENT

Ref : HMRP - 08 B Rev 00


Project : Hyderabad Metro Rail
Client : Hyderabad Metro Rail limited
Independent Engineer : Louis Berger Consulting Pvt. ltd
Concessionaire : L&T Metro Rail Hyderabad Limited
Contractor : L&T Construction PT&D IC (POWER SUPPLY & SCADA PROJECT)
Activity considered : Grinding Date: 20.06.13

Severity rating
Hazard / Environment Aspect

Probability
Risk / Residual

rating
Sl.no Activity Existing control measures Imapct Additional Control measures Risk / Action by
Source /
Possible outcome People at risk level Impact
Situation / Act

1) Check for the expiry date of the


grinding wheel
2) Check the RPM levels of machine
1) Prior to issue / taking ensure
& grinding wheel (machine RPM
Flew & damage of Grinding fellow to have fitness for the machine Stores
Taking machinery Damaged should not be more than Wheel
1 wheel & cut & surrounding 4 5 High from P&M dept / EHS Dept Low incharge /
from stores machine RPM)
injuries workmen 2) Do not stack the wheels in Supervsor
3) Check for casing against rotary
wet conditions
parts.
4) Check for physical damages of
machine & cables

1) Get the electrical connections


only from the electrician
Power
Giving supply Workmen using 2) All Electrical connections to be 1) Do not place cables on the
2 distribution Electrocution 4 5 High Low Supervisor
connections machine routed through ELCB of 30mA ground & in wet conditions
board, cable
sensitivity
3) Do not use damaged cables

1) The wheel should be fitted


correctly without any play / jerk
Cut injury, Eye
1) Not using damaged wheels 2) Do not take cables from the
damge, Workmen using Site Engineer
3 Grinding works Machine, cables 2) Using cables with good 4 5 High ground Low
Electorcution, fire machine / Supervisor
insulation & no cut / joints 3) Use Eye & hand protections
etc
4) Remove all flammables near
to the grinidng area

FOR LTC