You are on page 1of 5

B727 AMM - OUTFLOW VALVE -- REMOVAL/

INSTALLATION
Revision

FED ALL
OUTFLOW VALVE -- REMOVAL/INSTALLATION
1. General
A. The cabin pressurization outflow valve is removed and installed
from outside the airplane. It is located under right side of
the fuselage aft of the lower aft baggage.
2. Equipment and Materials
A. HI-Torque Apex Tool No. HTS-5
3. Remove Outflow Valve
A. Open seven PRESSURIZATION CONTROL circuit breakers on P6-2 and
install collars.
WARNING : ACTUATION OF OUTFLOW VALVE DURING REMOVAL/
INSTALLATION COULD CAUSE INJURY TO PERSONNEL.

B. Locate three screwheads forward of outflow valve and three


screwheads aft of outflow valve.
C. Insert bit in each screwhead and rotate counterclockwise until
stop point is reached.
D. Remove fillet seal from around valve.
E. Press upward and aft against aft end of outflow valve, rotating
it about 1/4-turn.
F. Reach through opening and disconnect electrical connectors on
forward side of each actuator.
G. Bring outflow valve down through opening and out of airplane.
H. Remove gasket and save for installation.
4. Install Outflow Valve
A. Clean fillet seal from valve and skin (Ref Chapter 51 , Seals
and Sealing).
B. Lift outflow valve through opening in airplane and position
valve with actuator electrical receptacles facing downward.

P.Blk EFFECTIVITY: ALL 21-31-011-4


Page 1 of 5
Printed - Date: 12/10/15 Time:
Copyright © 15 FedEx Express Corporation, Memphis TN, 38194, All rights reserved. NOV 10/1993
B727 AMM - OUTFLOW VALVE -- REMOVAL/
INSTALLATION
Revision

C. Connect electrical connectors to actuators.


D. Position gasket and slide forward end of outflow valve under
latches and lower aft end of valve into place.
E. Insert bit in each screwhead and rotate clockwise until stop
has been tightened.
F. Close circuit breaker s opened in 3.A.
G. Provide electrical power.
H. Move pressurization control system mode selector to MAN-DC.
I. Move FLT/GRD switch to GRD.
J. Position MANUAL toggle switch to CLOSE and observe that VALVE
position indicator shows valve closing.
K. Position mode selector switch to AUTO and observe that VALVE
position indicator shows valve full open.
L. Remove electrical power if no longer required.
M. Apply fillet seal all around valve. Fair between dimensions
shown on Fig. 401, A-A and B-B (Ref Chapter 51 , Seals and
Sealing).
NOTE : If aircraft schedule or weather conditions do not allow
proper curing of sealant, application of aerodynamic
fillet seal may be deferred. Enter instructions in the
Open Item List to apply fillet seal per MM 21-31-11
paragraph 4.M. within 14 days of date the outflow valve
was changed.

P.Blk EFFECTIVITY: ALL 21-31-011-4


Page 2 of 5
Printed - Date: 12/10/15 Time:
Copyright © 15 FedEx Express Corporation, Memphis TN, 38194, All rights reserved. NOV 10/1993
B727 AMM - OUTFLOW VALVE -- REMOVAL/
INSTALLATION
Revision

Cabin Pressurization Outflow Valve


Figure 401 (Sheet 1) (Sheet 1)

P.Blk EFFECTIVITY: ALL 21-31-011-4


Page 3 of 5
Printed - Date: 12/10/15 Time:
Copyright © 15 FedEx Express Corporation, Memphis TN, 38194, All rights reserved. NOV 10/1993
B727 AMM - OUTFLOW VALVE -- REMOVAL/
INSTALLATION
Revision

FED ALL

P.Blk EFFECTIVITY: ALL 21-31-011-4


Page 4 of 5
Printed - Date: 12/10/15 Time:
Copyright © 15 FedEx Express Corporation, Memphis TN, 38194, All rights reserved. NOV 10/1993
B727 AMM - OUTFLOW VALVE -- REMOVAL/
INSTALLATION
Revision

Cabin Pressurization Outflow Valve


Figure 401 (Sheet 2) (Sheet 2)
FED ALL

P.Blk EFFECTIVITY: ALL 21-31-011-4


Page 5 of 5
Printed - Date: 12/10/15 Time:
Copyright © 15 FedEx Express Corporation, Memphis TN, 38194, All rights reserved. NOV 10/1993

You might also like