Professional Documents
Culture Documents
INSTALLATION
Revision
FED ALL
HEAT EXCHANGERS - REMOVAL/INSTALLATION
1. General
A. Four heat exchangers are used in the air conditioning packs;
one primary and one secondary heat exchanger in each pack. The
following instructions are for either of the heat exchangers
with any difference noted in the applicable step.
2. Equipment and Materials
A. Offset box end wrench (fabricate per Ref. Fig. 401 )
3. Remove Heat Exchanger (Fig. 402)
A. Remove applicable exhaust door.
(1) Remove screws attaching applicable center fairing panel
to exhaust door frame and screws attaching fairing panel
to airplane structure and remove center fairing panel.
(2) Remove modulating door actuator access panel.
(3) Remove bolt holding actuator drive rod to crank arm and
free drive rod from crank arm.
(4) Support exhaust door and remove bolts securing flexible
duct to bottom of heat exchanger. Remove exhaust door.
B. Disconnect ducts from heat exchanger.
(1) Secondary (Fwd) Heat Exchanger
(a) Renove V-band couplings from forward and aft end of
forward hot air bypass duct.
(b) Remove duct support rod from forward hot air bypass
duct and remove duct.
(c) Remove V-band coupling from aft end of center hot
air bypass duct.
(d) Remove duct support clamp from center hot air
bypass duct and remove duct.
(e) Lower cooling fan duct for access inside ram air
duct.
NOTE : The cooling fan cone prevents removal of
cooling fan duct.
FED ALL