PhPC Control of Overrides STP PhPC-ZZZZZZ-IN-STP-0002_C3

Override Register No: Associated PTW No:

MOC No: ……………….. (for long term override only)

Safety Override Risk Assessment

Tag number of IPL device: (with SRS reference if applicable) Process/Utility System: (and/or equipment)
0850-LT-023 Water disposal tank
Description: inhibit all alarms from 0850-LT-023

System: BPCS SIS F&G Other (specify):

Type: Input Override Output Override Integrity Level: (if applicable)

Integrity Basis (select highest overall integrity ranking) Safety Environment Commercial

Reasons for applying override/bypass: (Operational, PM, CM, etc.)


Defected transmitter module , waiting material

Hazard from applying override: (What are the consequences if this IPL fails to act on demand?)
- High level in water disposal tank-B causing liquid carry over to cold vent
- High level in water disposal tank-B causing liquid carry over from tank
-

Mitigations & Protection Layers: (List down all protection layers) (Does any protection layer has a deferral?)
- Field operator to monitor level from 0850-LG-021 and report in case of hi level ( take reading each 4 hr )
- Confirm all time that both tanks-A/B in service and 0850-HV-042/041 open
- In case of hihi level in tank-B LT-011 will close HV-041 and as sequence DCS operator should close HV-042
- Not allowed to isolate Tank-B for maintenance activities
-
-

Are Related Overrides Implemented? Yes (list) No

This document is the property of PhPC It must not be stored, reproduced or disclosed to others without written authorization from the
Company
PhPC Control of Overrides STP PhPC-ZZZZZZ-IN-STP-0002_C3

Observations: (additional precautions and monitoring requirements?)


 .

Override Register No: Associated PTW No:

Maximum duration of override

Override Duration Less than 12 hours (1 Shift) ……………… Hours


More than 12 hours and less than 96 hours (SIF limit)
More than 12 hours and less than 7 days (IPL limit)

Shift Checks

Day Day Shift …………………… Night Shift …………………...


1 Day Shift …………………… Night Shift …………………...
Day Day Shift …………………… Night Shift …………………...
2
Day Shift …………………… Night Shift …………………… (SIF Limit)
Day …………...
3
Day Shift …………………… Night Shift …………………...
Day
Day Shift …………………… Night Shift …………………...
4
Day Shift …………………… Night Shift ……………………
Day
5
Day
6
Day
7

Override Authorization

PhPC Maintenance Engineer Date:

This document is the property of PhPC It must not be stored, reproduced or disclosed to others without written authorization from the
Company
PhPC Control of Overrides STP PhPC-ZZZZZZ-IN-STP-0002_C3

Performing Authority Acknowledgment Date:

Ops Team Leader Endorsement Date:

Maintenance Manager Endorsement Date:

Production Manager Endorsement Date:

Deputy/District Manager Endorsement Date:


…Authorization ends here for IPL overrides…

Technical Authority Approval Date:


(Required for SIFs only)

Confirmation of Override Application

Override Authority Date: Time:

Area Authority Date: Time:

Confirmation of Override Removal

Override Authority Date: Time:

Area Authority Date: Time:

XC: a) Control Room Override Register b) Technical Authority (if involved)

This document is the property of PhPC It must not be stored, reproduced or disclosed to others without written authorization from the