You are on page 1of 3

RISK ASSESSMENT

Risk Assessment Area Risk Assessment DOC NO: RA-GE-SUEZ-072

Occupational Health &safety S Contract No.


&safety Safety
Environment E Replacement of Flowmeter in Bldg.510 Date: 04/01/2018
Quality Q

Sl. Description of Hazard Potential and P C Risk Precautionary Measures and Safeguards P C Risk
No Activity Consequences L/M/H to control the risk L/M/H

1. Shifting Manual handling, Lifting 3 4 Med ➢ Obtain PTW prior to start work 2 2 Low
Flowmeter and using forklift, vehicle ➢ Trained and competent forklift operator and
accessories maneuvering, collision of rigger to carry out all lifting activities
from storage vehicle and other moving ➢ Ensure valid certificates and other documents
area to work equipment with personnel / for all lifting equipment / tools and truck
location using other vehicles / fixed objects, ➢ Open body truck must be provided with
forklift and Fall of personnel and adequate fall prevention
pickup materials, property damage, ➢ Traffic rules must be observed and followed
Minor and major injuries ➢ Banksman shall be provided for maneuvering
heavy vehicles and equipment inside the site
➢ All materials shall be unloaded (stored) keeping
safe distance from traffic routes without
obstructing access and egress
➢ PPE shall be worn by all personnel

2 Dismantling of Crushing, minor injuries, 3 4 Med ➢ Follow instructions from supervisor 2 2 Low
faulty water spillage, slippage ➢ Cover and protect equipments prone to water
flowmeter spillage
➢ Use all required ppe
➢ Ensure that no active electrical supply is open at
the vicinity of work
➢ Use standard tools intended for the purpose
4 Fixing new Crushing, minor injuries, 3 4 Med ➢ Follow instructions from supervisor 2 2 Low
flowmeter material damage, slippage ➢ Use all required ppe
➢ Use standard tools intended for the purpose

Prepared by: ANISH DEV Signature: Date: 04-01-18

Reviewed by: ALICIA Signature: ___________________ Date: 04-01-18

Approved by: Signature: ___________________ Date:

LOW = GREEN P = Probability

MED = ORANGE C = Consequence

HIGH = RED R = Risk Level

You might also like