You are on page 1of 36

FAIRVIEW END OF LINE

TAIL TRACK
(LAYOUT 1)

YALE

CONSTRUCT CURB
RAMPS
D
REV' D
M ADE CHK'

REMOVE STRIPING

RELOCATE CROSSWALK
ONS

5'
SI
NATURE

RELOCATE CURB BARRIER


REVI

DOOR DOOR
DOOR DOOR DOOR DOOR BP DOOR DOOR DOOR DOOR BP

DOOR DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL

BP BP BP BP
DOOR DOOR DOOR DOOR DOOR DOOR DOOR DOOR
M ARK

DOOR DOOR DOOR DOOR

TURNOUT BEGINS
DATE

16' PAST
AL NO.

TURNOUT 140' BETWEEN TURNOUT AND END OF LINE EXTEND TRACK 18'
VAULT SERI

CONSTRUCT CURB
RAMPS

LANDSCAPING DRIVEWAY LANDSCAPING YALE

SIDEWALK

NARROW DRIVEWAY WIDTH

NOTES:

1. OPTION TO SHIFT TURNOUT SOUTH-WEST TO EXTEND LENGTH


OF POCKET TRACK.

2. OPTION TO ADD A CROSSOVER FURTHER SOUTH ALONG VALLEY.

3. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
SIDEWALK CONSTRUCT CURB
YALE
FAIRVIEW END OF LINE RAMPS

TAIL TRACK
(LAYOUT 2) RELOCATE CROSSWALK AND
STOP BAR NORTH OF YALE
INTERSECTION

RELOCATE
CROSSWALK
SIGNAL
YALE
SIDEWALK

INSET A
D
REV' D
M ADE CHK'

REMOVE STRIPING
ONS

SEE INSET A
5' RELOCATE CURB BARRIER
SI
NATURE

REVI

DOOR DOOR
DOOR DOOR DOOR DOOR BP DOOR DOOR DOOR DOOR BP

DOOR DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL

BP BP BP BP
DOOR DOOR DOOR DOOR DOOR DOOR DOOR DOOR
M ARK

DOOR DOOR DOOR DOOR

TURNOUT BEGINS
DATE

16' PAST
AL NO.

TURNOUT 140' BETWEEN TURNOUT AND END OF LINE EXTEND TRACK 18'
VAULT SERI

LANDSCAPING DRIVEWAY LANDSCAPING YALE

SIDEWALK
SIGNALIZED CROSSWALK -
WILL NEED TO RELOCATE
SIGNAL DRIVEWAY MAY HAVE TO
BECOME RIGHT IN/ RIGHT OUT
ONLY

NOTES:

1. OPTION TO SHIFT TURNOUT SOUTH-WEST TO EXTEND LENGTH


OF POCKET TRACK.

2. OPTION TO ADD A CROSSOVER FURTHER SOUTH ALONG VALLEY.

3. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
LAKE UNION PARK CROSSOVER

LAKE UNION PLATFORMS


FAIRVIEW TAIL TRACK
APPROX. 180' WEST

CONSTRUCT 25M CROSSOVER


D
REV' D
M ADE CHK'

SIONS
NATURE

REVI
M ARK
DATE AL NO.
VAULT SERI

NOTES:

1. OPTION REPLACES THE NEED TO EXTEND


THE TAIL TRACK ON FAIRVIEW AVE.

2. GRADE DIFFERENCE BETWEEN THE TWO


TRACKS MAY CAUSE LIMITS OF TRACK RECONSTRUCTION TO
EXPAND. NEED SURVEY TO CONFIRM FULL LIMITS.

3. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
FAIRVIEW AND CAMPUS DRIVE STATION

DOOR DOOR
DOOR DOOR DOOR DOOR BP
BP

DIRECTION OF TRAVEL INEKON VEHICLE CAF VEHICLE

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR
D
REV'

10' 18' 62'

RAMP DOWN TO 0" AT 10"


D
M ADE CHK'

ADJUST RAILING TURNING LANE


SHELTER
TO AVOID DOORS
SIONS
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR RAILING
BP

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
M ARK

BP BP
DOOR DOOR DOOR DOOR
DATE

DOOR DOOR
AL NO.
VAULT SERI

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
LAKE UNION PARK STATION
SOUTHBOUND

REMOVE CROSSWALK STRIPING REMOVE CROSSWALK STRIPING


D
REV'

DOOR
D

DOOR DOOR DOOR DOOR


M ADE CHK'

BP

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL

BP
ONS

BP
DOOR DOOR DOOR DOOR
DOOR DOOR
SI
NATURE

REVI

10' 20' 26' AT 10" 20' 10'

RAMP DOWN TO 0" RAMP DOWN TO 0"


M ARK
DATE

SHELTER
AL NO.
VAULT SERI

NOTES:

1. OPTION TO BLOCK CROSSWALK TEMPORARILY WHILE STREETCAR


LOADS/UNLOADS.

2. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
WESTLAKE AND MERCER STATION
SOUTHBOUND
D
REV' D
M ADE CHK'

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
ONS

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR
SI
NATURE

REVI

TREE LANDSCAPE
LANDSCAPING BEFORE

5'
CROSSWALK

3.
LANDSCAPING
7'
M ARK

APPROXIMATELY 20'
DOWN TO SIDEWALK APPROXIMATELY 100' AT 10" APPROXIMATELY 26' DOWN TO SIDEWALK
DATE AL NO.
VAULT SERI

SIDEWALK EXTENDS TO BUILDING

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
WESTLAKE AND THOMAS STATION
SOUTHBOUND
D
REV' D
M ADE CHK'

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
ONS

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR
SI
NATURE

REVI

PARKING

STATION
M ARK

INFORMATION POLE
DATE

SHELTER
PLATFORM EXTENDS TO WESTLAKE AND HARRISON INTERSECTION FOR BUS STOPS APPROXIMATELY 20'
GREATER THAN 150' DOWN TO SIDEWALK
AL NO.
VAULT SERI

SIDEWALK EXTENDS TO BUILDING

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
WESTLAKE AND 9TH STATION
SOUTHBOUND

DOOR
DOOR DOOR DOOR DOOR BP
D
REV'

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
D
M ADE CHK'

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR
SIONS
NATURE

REVI

POLE

UTILITY BOX
(TC/SL)
SHELTER
BRUSH
M ARK

40' AT 10" 18' RAMP DOWN TO 6"


DATE AL NO.
VAULT SERI

SIDEWALK EXTENDS TO BUILDING

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
WESTLAKE AND VIRGINIA STATION
SOUTHBOUND

STOP BAR
D
REV'

DOOR
D
M ADE CHK'

DOOR DOOR DOOR DOOR BP

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
ONS

BP BP
DOOR DOOR DOOR DOOR
SI
NATURE

DOOR DOOR
REVI

SIDEWALK

13' RAMP DOWN TO 6"


M ARK
DATE

6' AT 6" 20' RAMP DOWN TO 6" 26' AT 10" 13' AT 6"
AL NO.

LANDSCAPING
VAULT SERI

BENCH

SIDEWALK EXTENDS TO BUILDING

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
JACKSON AND 5TH STATION
OUTBOUND
D
REV' D

RAILING
M ADE CHK'

SHELTER
EXTENDS TO INBOUND
ONS

CROSSWALK STATION
SI
NATURE

(SEE SHEET 14)


REVI

26' RAMP DOWN TO 6" 83' AT 9.5"

DOOR
DOOR DOOR DOOR DOOR BP
M ARK

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
DATE

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR
AL NO.
VAULT SERI

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
JACKSON AND 5TH STATION
INBOUND

DOOR
DOOR DOOR DOOR DOOR BP
D

DOOR
REV'

DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE


BP
DOOR
D
M ADE CHK'

BP
DOOR DOOR DOOR DOOR
DOOR
ONS

8' RAMP DOWN


SI
NATURE

30' BETWEEN INBOUND AND OUTBOUND STATION 54' AT 9.5" TO 0" 10' CROSSWALK
REVI

OUTBOUND STATION
(SEE SHEET 13)

SHELTER
M ARK
DATE AL NO.

RAILING
VAULT SERI

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
JACKSON AND 7TH STATION

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
D
REV'

DOOR
D
M ADE CHK'

BP
DOOR DOOR DOOR DOOR
DOOR
ONS

5'
RAMP 15' RAMP DOWN TO 7.5" 48' AT 9.5"
SI
NATURE

REVI

CROSSWALK RAMP DOWN TO 0" LANDSCAPING

SHELTER
M ARK

DOOR
RAILING
DATE

DOOR DOOR DOOR DOOR BP


AL NO.

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
VAULT SERI

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
JACKSON AND 13TH STATION

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
DOOR

BP
DOOR DOOR DOOR DOOR
DOOR
D
REV' D
M ADE CHK'

11' 14' RAMP DOWN TO 0" 62' AT 9.5" FOR INBOUND

LANDSCAPING CROSSWALK LANDSCAPING

55' AT 9.5" FOR OUTBOUND SHELTER


SIONS
NATURE

REVI

DOOR
RAILING DOOR DOOR DOOR DOOR BP
M ARK

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
DATE

BP BP
DOOR DOOR DOOR
AL NO.

DOOR
DOOR DOOR
VAULT SERI

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
WASHINGTON AND 14TH STATION

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
DOOR

BP
DOOR DOOR DOOR DOOR
DOOR
D
REV' D
M ADE CHK'

54' AT 9.5" INBOUND

10' AT 0"
SHELTER 21' RAMP DOWN TO 0" CROSSWALK
LANDSCAPING
ONS

62' AT 9.5" OUTBOUND


OPENING FOR DRIVEWAY
SI
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR BP RAILING
M ARK

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
DATE

BP BP
AL NO.

DOOR DOOR DOOR DOOR


DOOR DOOR
VAULT SERI

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
YESSLER AND BROADWAY STATION
OUTBOUND

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL

BP BP
D

DOOR DOOR DOOR DOOR


REV'

DOOR DOOR
D
M ADE CHK'

14' RAMP DOWN TO 6" 10' AT 9.5" 20' RAMP DOWN TO 6" 16' AT 6"

LANDSCAPING

LANDSCAPING
ONS

SHELTER
SI
NATURE

REVI

BIKE PATH
M ARK
DATE

LANDSCAPING
AL NO.
VAULT SERI

SIDEWALK

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
BROADWAY AND TERRACE STATION
OUTBOUND

DOOR
DOOR DOOR DOOR DOOR BP
D
REV'

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
D
M ADE CHK'

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR
SIONS
NATURE

8' RAMP DOWN


REVI

10' 14' RAMP DOWN TO 6" 22' AT 9.5" TO 6" 14' AT 6"
PARKING
LANDSCAPING LANDSCAPING
FLAGPOST

SHELTER
M ARK
DATE

RAILING
AL NO.
VAULT SERI

BIKE PATH

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
BROADWAY AND MARION STATION
OUTBOUND

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
D
REV' D
M ADE CHK'

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR

10' RAMP
28' AT 9.5" 20' RAMP DOWN TO 6" 12' AT 6" DOWN TO 0" 10' CROSSWALK
ONS

PARKING LANDSCAPING
SI
NATURE

REVI

LANDSCAPING

SHELTER
M ARK

RAILING
DATE AL NO.

BIKE PATH
VAULT SERI

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
BROADWAY AND PINE STATION
OUTBOUND

DOOR
DOOR DOOR DOOR DOOR BP
D
REV'

DOOR
D
M ADE CHK'

INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR
SIONS
NATURE

REVI

16' AT 9.5" 20' RAMP DOWN TO 6" 16' AT 6"

LANDSCAPING

POLE
SHELTER
M ARK
DATE

RAILING
AL NO.

BIKE LANE
VAULT SERI

DRIVEWAY

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD CHANGE


ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
BROADWAY AND DENNY STATION
END OF LINE TAIL TRACK
D
REV' D
M ADE CHK'

SIONS
NATURE

REVI

EXTEND TRACK 130.5'

30.0' 75.5'

EXTEND
TACTILE 65' UNTIL INTERSECTION
(SEPERATE
M ARK

IMPROVEMENTS E DENNY WAY


'BY OTHERS')
DATE

7.0'
CURRENT BUS STOP
DRIVEWAY
AL NO.

SHIFT END OF LINE


VAULT SERI

DOOR DOOR
BP DOOR DOOR DOOR DOOR BP

DOOR DOOR
BP DIRECTION OF TRAVEL INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL

BP BP
DOOR DOOR DOOR DOOR DOOR DOOR DOOR DOOR
DOOR DOOR

RELOCATE POLE
(SEPERATE EXTEND TRACK TO
REMOVE CURB
IMPROVEMENTS 'BY ACCOUNT FOR
OTHERS') SECOND CAF
VEHICLE.

NOTES:

1. OPTION TO BLOCK DRIVEWAY TEMPORARILY WHILE STREETCAR


IS UNLOADING/LOADING. WOULD NOT NEED TO EXTEND PLATFORM.

2. MAY REQUIRE TWC LOOP DETECTOR TO BE


MOVED.

3. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
BROADWAY AND DENNY STATION
END OF LINE PLATFORM

35' RAMP DOWN TO 6" 41' AT 9.5"


D
REV' D

RECONSTRUCTION
M ADE CHK'

FOUNDATION/RELOCATE
SHELTER 7.0'
DRIVEWAY
SHELTER
SIONS
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR BP
M ARK

DOOR
DATE

INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL


AL NO.

BP BP
DOOR DOOR DOOR DOOR
VAULT SERI

DOOR DOOR

RELOCATE
TWC LOOP
OCS POLE

NOTES:

1. OPTION TO BLOCK DRIVEWAY TEMPORARILY WHILE STREETCAR


IS UNLOADING/LOADING. WOULD NOT NEED TO EXTEND PLATFORM.

2. MAY REQUIRE TWC LOOP DETECTOR TO BE


MOVED.

3. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
BROADWAY AND PIKE STATION
INBOUND

RAILING
D
REV' D
M ADE CHK'

17' RAMP DOWN TO 6"


SHELTER

FLAG POST

PARKING

29' AT 9.5" 14' RAMP DOWN TO 4"


SIONS
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR BP
M ARK

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
DATE

BP
DOOR
AL NO.

BP
DOOR DOOR DOOR DOOR
DOOR
VAULT SERI

APPEARS TO HAVE
KINK/CURVE IN RAIL

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
BROADWAY AND MARION STATION
INBOUND

SIDEWALK EXTENDS TO BUILDING


D
REV'

30' 15' AT 6"


D
M ADE CHK'

SHELTER

FLAGPOST
SIDEWALK LANDSCAPING LANDSCAPING

20' RAMP DOWN TO 6" 19' AT 9.5"


ONS

OCS POLE
SI
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
M ARK

DOOR

BP
DATE

DOOR DOOR DOOR DOOR


DOOR
AL NO.
VAULT SERI

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
BROADWAY AND TERRACE STATION
INBOUND

EXTEND NEAR LEVEL


14' AT 6" 22' RAMP DOWN TO 6" BOARDING TO 14'

14' AT 6" 22' RAMP DOWN TO 6" 8' AT 9.5" 18' RAMP DOWN TO 6"
D
REV'

EXTEND PLATFORM TO
D

ACCOMODATE EXTENDED
M ADE CHK'

NEAR LEVEL BOARDING.

24' 32'

LANDSCAPING TREE LANDSCAPING


SIONS
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR BP
1.6' 1.5'

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
DOOR
M ARK

BP
DOOR DOOR DOOR DOOR
DATE

DOOR
AL NO.
VAULT SERI

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
BROADWAY AND YESLER STATION
INBOUND

SIDEWALK

BIKE PATH
RAILING
D
REV' D
M ADE CHK'

LANDSCAPING
TREE SHELTER

LANDSCAPING
SIONS

10' RAMP DOWN


NATURE

REVI

16' AT 6" 20' RAMP DOWN TO 6" 14' AT 9.5" TO 6"


SIDEWALK

DOOR
M ARK

DOOR DOOR DOOR DOOR BP


DATE

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
DOOR
AL NO.

BP
VAULT SERI

DOOR DOOR DOOR DOOR


DOOR

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
WESTLAKE AND 7TH STATION
NORTHBOUND

SIDEWALK EXTENDS TO BUILDING

CUT 12' INTO PARKING EXTEND PLATFORM


10' AT 6" LANDSCAPING
D
REV' D
M ADE CHK'

SHELTER

PARKING
20' RAMP DOWN TO 6" 20' AT 10" 20' RAMP DOWN TO 6"
SIONS
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
M ARK

DOOR
DATE

BP
DOOR DOOR DOOR DOOR
DOOR
AL NO.
VAULT SERI

NOTES:

1. OPTION TO TEMPORARILY BLOCK CROSSWALK DURING LOADING AND


UNLOADING OF STREETCAR. SINGLE FRONT DOOR WILL UNLOAD IN FRONT OF
TACTILE STRIP.

2. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD CHANGE ONCE


SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
WESTLAKE AND DENNY STATION
NORTHBOUND
D
REV'

TREE LANDSCAPING TREE LANDSCAPING


D
M ADE CHK'

SHELTER

26' AT 10"

5'
3.
PLATFORM EXTENDS ADDITIONAL 40'
16' RAMP DOWN TO 6" 41' RAMP DOWN TO 6" TO ACCOMMODATE BUS.
SIONS
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
M ARK

DOOR
DATE

BP
DOOR DOOR DOOR DOOR
DOOR
AL NO.
VAULT SERI

NOTES:

1. OPTION TO SHIFT BERTHING MARKER SOUTH AND UNLOAD BP


DOOR ON RAMP DOWN. NOT SURE IF WOULD WORK ACCURATELY.

2. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
TERRY AND THOMAS STATION
NORTHBOUND

SIDEWALK EXTENDS TO BUILDING

EXTEND 10' AT 6" LANDSCAPING


D
REV' D
M ADE CHK'

SHELTER

LANDSCAPING

10' RAMP
DOWN TO 6" 26' AT 11" 12' RAMP DOWN TO 6"
SIONS
NATURE

REVI

DOOR
PARKING STRIPING DOOR DOOR DOOR DOOR BP

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
M ARK
DATE

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR
AL NO.
VAULT SERI

NOTES:

1. OPTION TO HAVE SINGLE FRONT DOOR UNLOAD


BEHIND TACTILE STRIP.

2. INFORMATION IS NOT BASED ON SURVEY. DESIGN


COULD CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
TERRY AND MERCER STATION
NORTHBOUND

SIDEWALK EXTENDS TO BUILDING

LENGTHEN
TACTILE 10'
D
REV'

30.5' TACTILE SURFACE - NEAR LEVEL BOARDING


D
M ADE CHK'

PARKING
SIONS
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
INEKON VEHICLE CAF VEHICLE BP DIRECTION OF TRAVEL
M ARK
DATE

BP BP
DOOR DOOR DOOR DOOR
DOOR DOOR
AL NO.
VAULT SERI

NOTES:

1. THIS OPTION ASSUMES BERTHING MARKER LOCATION


NECESSARY FOR SIGHT DISTANCE AT INTERSECTION.

2. ANOTHER OPTION WOULD BE TO LEAVE TACTILE SURFACE


AND UNLOAD ON SIDEWALK / OR SHIFT BERTHING MARKER
BACK BLOCKING PARKING SLIGHTLY.

3. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
LAKE UNION PARK STATION
NORTHBOUND

SIDEWALK
D
REV' D
M ADE CHK'

ONS

SHELTER
SI
NATURE

REVI

DRIVEWAY

10' AT 0" 20' RAMP DOWN TO 0" 26' AT 10" 20' RAMP DOWN TO 0" 10' AT 0"
M ARK

DOOR
DOOR DOOR DOOR DOOR BP
DATE

DOOR
AL NO.

DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE


BP
DOOR
VAULT SERI

BP
DOOR DOOR DOOR DOOR
DOOR

REMOVE CROSSWALK REMOVE CROSSWALK


STRIPING (QUANTITY STRIPING (QUANTITY
INCLUDED IN SOUTHBOUND) INCLUDED IN SOUTHBOUND)

NOTES:

1. INFORMATION IS NOT BASED ON SURVEY. DESIGN COULD


CHANGE ONCE SURVEY IS RECEIVED.

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
WESTLAKE HUB STATION

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
DOOR
D
REV'

BP
DOOR DOOR DOOR DOOR
D
M ADE CHK'

DOOR

44' RAMP DOWN TO 0" 15' RAMP DOWN TO 0"


SIONS
NATURE

REVI

SHELTER
50' AT 9.5"
M ARK

DOOR
DOOR
DOOR DOOR
DOOR BP
DATE

DOOR
AL NO.

CAF VEHICLE INEKON VEHICLE BP DIRECTION OF TRAVEL


BP
DOOR
VAULT SERI

BP
DOOR
DOOR DOOR
DOOR
DOOR

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
STEWART AND 3RD STATION
NORTHBOUND
D
REV' D
M ADE CHK'

50' AT 9.5"
SIONS
NATURE

REVI

DOOR
DOOR DOOR DOOR DOOR BP
M ARK

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
DATE

BP
DOOR
AL NO.

BP
DOOR DOOR DOOR DOOR
DOOR
VAULT SERI

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
STEWART AND 3RD STATION
SOUTHBOUND
D
REV' D
M ADE CHK'

SHELTER

50' AT 9.5"
SIONS
NATURE

REVI

DOOR
DOOR
DOOR DOOR DOOR DOOR BP BP
M ARK

CAF VEHICLE INEKON VEHICLE DIRECTION OF TRAVEL


DATE AL NO.

BP BP
DOOR
DOOR DOOR
DOOR
DOOR DOOR
VAULT SERI

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
1ST AND PIKE STATION

DOOR
DOOR DOOR DOOR DOOR BP
D
REV'

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
DOOR
D
M ADE CHK'

BP
DOOR DOOR DOOR DOOR
DOOR
ONS

SHELTER
SI
NATURE

SHELTER
REVI

100' AT 9.5"

DOOR
DOOR
DOOR DOOR DOOR DOOR BP BP
M ARK

CAF VEHICLE INEKON VEHICLE DIRECTION OF TRAVEL


DATE

BP BP
DOOR
DOOR DOOR
DOOR
AL NO.

DOOR DOOR
VAULT SERI

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
1ST AND MADISON STATION

DOOR
DOOR DOOR DOOR DOOR DOOR DOOR BP
D
REV'

DOOR DOOR
BP DIRECTION OF TRAVEL BRT VEHICLE DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
DOOR
D
M ADE CHK'

DOOR DOOR BP
DOOR DOOR DOOR DOOR
DOOR
ONS

SHELTER
SI
NATURE

SHELTER
REVI

115.4' AT 9.5"

DOOR
DOOR
DOOR DOOR DOOR DOOR BP BP
M ARK

CAF VEHICLE INEKON VEHICLE DIRECTION OF TRAVEL


DATE

BP BP
DOOR
DOOR DOOR
DOOR
AL NO.

DOOR DOOR
VAULT SERI

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
1ST AND CHERRY STATION

DOOR
DOOR DOOR DOOR DOOR BP
D
REV'

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
DOOR
D
M ADE CHK'

BP
DOOR DOOR DOOR DOOR
DOOR
ONS

SHELTER
SI
NATURE

SHELTER
REVI

100' AT 9.5"

DOOR
DOOR
DOOR DOOR DOOR DOOR BP BP
M ARK

CAF VEHICLE INEKON VEHICLE DIRECTION OF TRAVEL


DATE

BP BP
DOOR
DOOR DOOR
DOOR
AL NO.

DOOR DOOR
VAULT SERI

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.
OCCIDENTAL MALL STATION

DOOR
DOOR DOOR DOOR DOOR BP

DOOR
DIRECTION OF TRAVEL INEKON VEHICLE BP CAF VEHICLE
BP
DOOR
D
REV'

BP
DOOR DOOR DOOR DOOR
DOOR
D
M ADE CHK'

SHELTER SHELTER

16' CROSSWALK 19' RAMP DOWN TO 0' 89' AT 9.5" 15' RAMP DOWN TO 0' 16' CROSSWALK
SIONS
NATURE

REVI

DOOR
DOOR
DOOR DOOR DOOR DOOR BP BP

CAF VEHICLE INEKON VEHICLE DIRECTION OF TRAVEL


M ARK

BP BP
DOOR
DOOR DOOR
DOOR
DOOR DOOR
DATE AL NO.
VAULT SERI

NO.
INITIALS AND DATE INITIALS AND DATE MACCHI
AR
OL PC
IE
A
OFWSHI Seattle
R

NG
MA

I
REVIEWED:
TE R/W

JOB
A

TH
DESIGNED
T

Department of
TO
S

DES. CONST.
NA

CHECKED
OMAS
VEHICLE INTERFACE CO
GI

SDOT PROJ. MGR.

Transportation VAULT PLAN NO.


R

RECEIVED
PR

DRAWN
EE

R 52802
ORDINANCE NO. PW NO.
STUDY
D
O

EG E
N

CHECKED REVISED AS BUILT ISTER


F

E I SUBPROJECT ID:
S G
S N
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CITY OF SEATTLE STANDARD PLANS AND ION E
AL SCALE:N/A SHEET OF
SPECIFICATIONS AND OTHER DOCUMENTS CALLED FOR IN SECTION 0-02.3 OF THE PROJECT MANUAL.