DATA KAPASITAS MESIN

Kecepatan Batch
Kapasitas Kapasitas Per
No Nama Mesin mesin menit
m/jam Hari (meter) (5000m)
(m/min)
0 Pemartaian Greige 41.67 2500 60000 120
1 Singeing Desizing 140 8400 201600 37.71
2 Batching time (min 8 jam) 10.42 625 15000 480
3 Scouring Bleaching 70 4200 100800 91.43
4 Heat Setting / Stenter 70 4200 100800 71.43
5 Printing 50 3000 72000 120.00
6 Steaming 55 3300 79200 90.91
7 Resin Finish 95 5700 136800 52.63
8 Calendering 35 2100 50400 142.86
Total 34025 816600 1206.97

Kecepatan
Waktu Tempuh 1 Batcher 5000 m/min Waktu mesin
1 Osthoff Range (Singeing/Desizing) 140 35.71428571
2 Batching time (min 8 jam) 10.4 480
3 Goller (Scouring/Bleaching) 70 71.42857143
4 Monfort1 (Stenter Heat Setting) 70 71.42857143
5 Zimmer (Printing 1/2/3) 50 100
6 Arioli (Steamer 1/2) 55 90.90909091
7 Monfort2 (Stenter Resin Finish) 95 52.63157895
8 Ramisch Guarneri (Calender 1/2/3) 35 142.8571429
Kecepatan Kapasitas Kapasitas Per
No Nama Proses Enggraving Proses Screen/jam Hari
(min/Screen)
1 Rounding 10 6 144
2 Polimerize 60.0 1 24
3 Penentuan Motif 50 1.2 28.8
4 Coating 0.5 120 2880
5 Drying 20 3 72
6 Check Screen + Expose Motif 30 2 48
7 Developing+ Polimerize 150 0.4 9.6
8 Pasang Endring+ Cek Final 15 4 96

Total 335.50 138 3302

Allowa Total
nce Time Total Time
Time (min) (Jam)
10 45.714 0.76
5 485 8.08
5 76.429 1.27
5 76.429 1.27
20 120 2.00
5 95.909 1.60
5 57.632 0.96
10 152.86 2.55
1110 18.50
JUMLAH
NO MESIN Shift 1 2 3 4

1 SINGEING DESIZING/OSTHOFF 3 33,828 66,743 8,822 51,768


2 BATCHING TIME 3 15,000 15,000 15,000 15,000
2 SCOURING BLEACHING (GOLLER) 3 26,800 44,627 43,644 59,088
7 STENTER 1 3 53,299 42,026 25,246 44,661
8 PRINTING 1 3 20,040 15,327 20,448 21,550
12 STEAMER 2 3 54,988 33,036 3,300 47,042
14 STENTER 2 (RF) 3 59,284 53,194 24,457 52,579
15 CALENDER 1 3 36,951 19,902 8,484 36,951
TOTAL 24

JUMLAH
NO MESIN Shift 1 2 3 4

1 SINGEING DESIZING/OSTHOFF 3 12,373 44,131 64,216 90,671


2 BATCHING TIME 3 15,000 15,000 15,000 15,000
3 SCOURING BLEACHING (GOLLER) 3 20,784 56,070 48,066 84,325
4 STENTER 1 3 36,340 23,566 62,502 71,535
5 PRINTING 1 3 37,800 9,570 24,947 26,508
6 STEAMER 2 3 54,430 34,403 43,367 40,928
7 STENTER 2 (RF) 3 38,803 65,539 68,507 33,975
8 CALENDER 1 3 21,199 30,205 29,913 33,166
TOTAL 24

JUMLAH
NO MESIN Shift 1 2 3 4

1 SINGEING DESIZING/OSTHOFF 3 94,493 77,986 89,128 32,877


2 BATCHING TIME 3 15,000 15,000 15,000 15,000
3 SCOURING BLEACHING (GOLLER) 3 92,905 79,114 94,167 40,174
4 STENTER 1 3 74,296 63,085 72,818 66,968
5 PRINTING 1 3 31,420 28,630 30,670 21,500
6 STEAMER 2 3 50,180 44,564 63,450 68,724
7 STENTER 2 (RF) 3 56,776 85,968 59,828 80,063
8 CALENDER 1 3 11,831 35,641 22,192 33,223
TOTAL 24

Tanggal No SPPK / Batch Qty

1 G 1711020 - 145 5211


2 G 1711020 - 146 5197
Tuesday, November 21, 2017
3 G 1711020 - 147 4215
4 G 1711020 - 148 5109
5 G 1711020 - 157 5124
6 G 1711021 - 161 5137
Wednesday, November 22, 2017
7 G 1711021 - 164 5200
8 G 1711021 - 165 4104
9 G 1711021 - 167 5124
10 G 1711022 - 172 5122
Thursday, November 23, 2017
11 G 1711022 - 173 5109
12 G 1711023 - 174 5210
13 G 1711023 - 176 5174
14 G 1711023 - 177 5210
Friday, November 24, 2017
15 G 1711024 - 181 5108
16 G 1711024 - 183 5114
17 G 1711024 - 185 5191
18 G 1711025 - 190 5109
Sunday, November 26, 2017
19 G 1711025 - 191 5121
20 G 1711025 - 193 5133
21 G 1711025 - 194 5141
22 G 1711025 - 195 5138
Monday, November 27, 2017
23 G 1711026 - 196 5100
24 G 1711026 - 198 5136
25 G 1711026 -199 5143
26 G 1711027 - 201 5139
Tuesday, November 28, 2017
27 G 1711027 - 202 5144
28 G 1711027 - 204 5177
Total 142140
Rata - Rata 5076.428571

Departement Stasiun Kerja Kecepatan SK Waktu Siklus


0 120 480
1 37.71 480
Pretreatment
Pretreatment 2 480 480
3 91.43 480
4 71.43 480
5 120 480
Printing
6 90.91 480
7 52.63 480
Finishing
8 142.86 480
Jumlah
Rata-rata
5 6 7 8 9 10

83,052 92,771 88,937 - 48,722 28,243


15,000 15,000 15,000 15,000 15,000 15,000
72,174 94,158 81,158 - 53,972 -
61,319 76,967 75,319 3,406 37,037 14,690
22,479 28,215 49,300 20,600 20,610 20,960
57,860 58,562 68,022 70,650 36,450 30,473
65,915 60,148 84,448 68,342 67,892 52,042
37,711 41,068 39,205 41,168 38,528 38,014

5 6 7 8 9 10

47,383 81,477 72,144 4,828 95,893 48,707


15,000 15,000 15,000 15,000 15,000 15,000
47,620 78,878 66,136 24,988 65,577 77,512
59,360 57,673 67,099 30,029 19,295 33,274
23,566 25,966 25,690 26,888 10,790 26,310
39,962 64,306 70,603 72,778 3,250 36,845
33,894 62,492 87,383 60,427 46,723 46,156
27,717 22,071 31,154 33,846 31,694 17,827

5 6 7 8 9 10

51,043 - 45,093 57,451 77,164 102,601


15,000 15,000 15,000 15,000 15,000 15,000
69,771 27,907 44,014 83,518 92,175 94,645
43,816 41,489 26,830 45,566 72,284 66,486
22,130 4,550 9,436 14,356 31,145 25,926
73,990 28,000 14,739 13,977 55,484 90,024
76,355 66,940 31,406 55,578 72,576 80,099
33,141 33,208 13,413 9,950 25,665 39,296
Waktu Proses (menit)
Singeing Batching Scouring
Pemartaian Heat Setting Printing
Desizing Time Bleaching
120 38.22 480.00 93.44 71.44 124.22
120 38.12 480.00 93.24 71.24 123.94
114 31.11 480.00 79.21 57.21 104.30
120 37.49 480.00 91.99 72.99 122.18
120 37.60 480.00 92.20 73.20 122.48
120 37.69 480.00 92.39 73.39 122.74
120 38.14 480.00 93.29 74.29 122.00
109 30.31 480.00 77.63 58.63 100.08
118 37.60 480.00 92.20 73.20 120.48
119 37.59 480.00 92.17 71.17 120.44
119 37.49 480.00 91.99 72.99 120.18
120 38.21 480.00 93.43 74.43 122.20
122 37.96 480.00 92.91 70.91 121.48
123 38.21 480.00 93.43 72.43 122.20
124 37.49 480.00 91.97 72.97 120.16
123 37.53 480.00 92.06 73.06 120.28
127 38.08 480.00 93.16 73.16 121.82
124 37.49 480.00 91.99 72.99 120.18
121 37.58 480.00 92.16 73.16 120.42
120 37.66 480.00 92.33 73.33 120.66
120 37.72 480.00 92.44 73.44 120.82
120 37.70 480.00 92.40 72.40 120.76
118 37.43 480.00 91.86 72.86 120.00
120 37.69 480.00 92.37 72.37 120.72
119 37.74 480.00 92.47 72.47 120.86
121 37.71 480.00 92.41 72.41 120.78
119 37.74 480.00 92.49 71.99 120.88
120 37.98 480.00 92.96 71.96 123.54
3360 1016.29 13440 2562.57142857 2006.07142857 3360.8
120 37.2602040816 480 91.52 71.6454081633 120.028571429

Waktu Siklus Efisiensi 480 120


480 25.00% 480 37.71
480 7.86% 480 480
480 100.00% 480 91.43
480 19.05% 480 71.43
480 14.88% 480 120
480 25.00% 480 90.91
480 18.94% 480 52.63
480 10.96% 480 142.86
480 29.76%
251.45%
27.94%
HASIL PRODUKSI
PT. ASIA CITRA PRATAMA
Grand Total Oktober 2017
Tanggal

11 12 13 14 15 16 17

65,373 81,907 21,870 81,845 20,162 63,306 26,123


15,000 15,000 15,000 15,000 15,000 15,000 15,000
79,081 57,172 34,072 86,883 21,184 51,865 66,397
39,732 78,072 38,656 61,276 53,132 36,521 20,346
14,807 19,321 21,210 29,080 25,540 8,510 25,745
5,480 21,090 26,009 54,176 68,732 28,335 25,686
27,471 44,372 44,691 58,410 66,096 60,397 47,245
24,191 11,907 20,115 15,718 36,558 26,335 21,588

HASIL PRODUKSI
PT. ASIA CITRA PRATAMA
Grand Total November 2017
Tanggal

11 12 13 14 15 16 17

98,002 99,067 97,976 85,802 79,898 92,786 88,575


15,000 15,000 15,000 15,000 15,000 15,000 15,000
71,920 100,696 85,664 87,875 86,221 84,415 84,946
69,635 70,260 70,992 75,500 74,455 59,414 56,132
22,820 25,189 24,310 28,376 23,280 29,825 40,170
36,793 68,471 72,808 65,681 72,638 54,965 58,076
60,285 72,811 76,969 73,524 105,684 71,107 63,018
10,368 24,916 35,233 36,796 38,970 33,696 13,748

HASIL PRODUKSI
PT. ASIA CITRA PRATAMA
Grand Total Desember 2017
Tanggal

11 12 13 14 15 16 17

98,922 66,256 104,255 112,315 89,304 114,730 79,085


15,000 15,000 15,000 15,000 15,000 15,000 15,000
93,406 58,984 94,856 100,128 82,157 98,358 88,545
79,841 81,017 78,353 80,047 76,525 77,400 85,881
40,670 26,450 27,040 35,650 33,414 33,002 33,003
58,962 68,300 93,189 88,265 65,740 71,555 67,739
102,380 67,353 89,494 81,360 108,251 84,176 90,747
42,213 31,149 35,030 34,615 36,778 40,572 18,461
menit)
Total Proses
Fiksasi Resin Finish Calendering
Per Batch
94.75 52.85 146.89 1221.81
94.49 53.71 146.49 1221.23
76.64 43.37 118.43 1104.27
92.89 52.78 143.97 1214.29
93.16 52.94 144.40 1215.98
93.40 53.07 144.77 1217.45
94.55 53.74 146.57 1222.57
74.62 42.20 115.26 1087.73
93.16 52.94 144.40 1211.98
93.13 52.92 144.34 1210.75
92.89 52.78 143.97 1211.29
94.73 53.84 146.86 1223.70
94.07 53.46 145.83 1218.63
94.73 53.84 146.86 1224.70
92.87 52.77 143.94 1216.17
92.98 52.83 144.11 1215.85
94.38 53.64 146.31 1227.55
92.89 52.78 143.97 1216.29
93.11 52.91 144.31 1214.64
93.33 53.03 144.66 1215.00
93.47 53.12 143.89 1214.90
93.42 53.08 143.80 1213.56
92.73 52.68 142.71 1208.27
93.38 53.06 143.74 1213.34
93.51 53.14 143.94 1213.13
93.44 53.09 143.83 1214.68
93.53 53.15 143.97 1212.74
94.13 53.49 144.91 1218.97
2584.36363636 1467.21052632 3997.14285714 33821.4455913
92.2987012987 52.4003759398 142.755102041 1207.90877112

StMax - Sti (StMax - Sti)^2


360 129600
442.29 195620.4441
0 0
388.57 150986.6449
408.57 166929.4449
360 129600
389.09 151391.0281
427.37 182645.1169
337.14 113663.3796
1220436.0585 1104.73347849
18 19 20 21 22 23 24 25 26

47,158 64,529 70,551 103,859 78,862 60,315 - 74,604 52,247


15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000
24,681 70,075 84,548 100,851 89,033 27,921 22,691 59,453 52,506
32,095 36,510 72,736 65,235 64,229 74,704 35,188 53,994 53,981
16,760 28,071 12,480 30,305 29,389 25,060 14,680 21,895 14,006
16,667 21,720 8,570 51,038 38,265 68,157 39,656 44,660 52,503
49,779 47,970 54,119 61,069 60,944 76,750 45,700 66,818 53,303
8,789 15,793 15,637 14,936 37,476 34,192 18,323 38,516 32,691

18 19 20 21 22 23 24 25 26

89,365 82,183 86,827 73,653 80,362 87,511 90,772 81,751 88,625


15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000
83,897 83,350 80,408 74,848 75,004 85,650 95,520 80,112 92,766
74,139 72,367 64,091 38,601 44,203 72,961 85,076 82,162 81,790
34,060 20,590 23,370 18,151 11,450 16,610 22,920 29,410 32,210
49,841 69,653 73,578 50,435 78,012 55,385 77,529 78,491 68,619
66,282 52,093 78,865 84,114 93,779 82,304 79,931 62,564 78,508
24,233 31,361 25,041 38,412 37,296 37,099 32,565 17,344 27,274

18 19 20 21 22 23 24 25 26

80,986 103,891 100,797 95,284 71,891


15,000 15,000 15,000 15,000 15,000
84,676 99,790 99,501 64,103 91,028
72,962 88,336 88,548 79,367 89,209
16,350 26,370 35,220 26,210 37,280
55,730 92,480 93,424 71,697 76,700
76,116 101,478 104,209 89,679 74,574
31,108 36,862 27,933 35,930 33,624
HASIL
PRODUKSI TARGET
27 28 29 30 31 (meter)
59,976 35,641 - 83,775 71,567 1,666,556 155,520
15,000 15,000 15,000 15,000 15,000 465,000 155,520
58,250 57,754 - 60,341 72,574 1,652,953 95,760
47,796 42,164 13,471 31,804 66,127 1,451,739 90,720
19,973 22,890 22,770 10,130 23,960 676,111 36,000
16,749 27,942 35,616 5,300 38,786 1,155,520 77,760
35,053 53,494 68,627 45,202 64,215 1,720,026 129,600
21,977 33,456 18,967 19,626 9,277 814,050 38,880

HASIL
PRODUKSI TARGET
27 28 29 30 31 (meter)
74,326 9,160 23,004 54,348 2,125,816 155,520
15,000 15,000 15,000 15,000 450,000 155,520
73,667 62,371 25,300 40,147 2,124,733 95,760
80,815 63,839 20,442 17,283 1,734,830 90,720
38,150 16,756 13,490 8,924 718,096 36,000
42,291 51,527 47,462 16,021 1,649,148 77,760
108,803 100,060 76,644 55,870 2,087,114 129,600
37,112 39,132 36,352 30,490 886,230 38,880

HASIL
PRODUKSI TARGET
27 28 29 30 31 (meter)
1,745,552 155,520
330,000 155,520
1,773,922 95,760
1,551,124 90,720
590,422 36,000
1,406,913 77,760
1,735,406 129,600
661,835 38,880
RENCANA A
TANGGAL JAM KEGIATAN ESTIMASI BIAYA
16:00 17:00 Pergi ke Rest Area 57 -
17:00 18:00
Naik Bis Karawang - Buahbatu Bandung Rp 32.000 - Rp50.000
18:00 19:00
19:00 20:00 Jembatan Buah Batu ke Stasiun KAC RP 27,000-32.000
Friday, March 16, 2018
20:00 21:00 Check in Boarding Pass -
21:00 22:00
22:00 23:00
23:00 0:00
0:00 1:00
Stasiun Kiaracondong ke Stasiun Kutoarjo Rp62,000
1:00 2:00
2:00 3:00
3:00 4:00
4:00 5:00
5:00 6:00
6:00 7:00 Stasiun Kutoarjo - Stasiun Rp8,000
Yogyakarta/Stasiun Lempuyangan
7:00 8:00
8:00 9:00
9:00 10:00
10:00 11:00
11:00 12:00 Pantai Gunung Kidul <Rp 500.000
###
12:00 13:00
13:00 14:00
14:00 15:00
15:00 16:00
Tebing Breksi + Candi Ijo RP 25.000
16:00 17:00
17:00 18:00
Taman Pelangi Rp20,000
18:00 19:00
19:00 20:00 Malioboro Unpredictable
20:00 21:00
Alun-Alun Kidul DIY Unpredictable
21:00 22:00
22:00 23:00 Tugu Yogyakarta + Monumen Serangan Free
23:00 0:00 Umum 1 Maret
0:00 1:00
1:00 2:00
Istirahat -
2:00 3:00
3:00 4:00
4:00 5:00
5:00 6:00 Sarapan di Pasar Beringharjo -
6:00 7:00
7:00 8:00
8:00 9:00
9:00 10:00 Candi Prambanan Rp40,000
10:00 11:00
11:00 12:00
Sunday, March 18, 2018
Sunday, March 18, 2018
12:00 13:00
Keraton Yogyakarta + Museum Kereta Rp 7500 x 2
13:00 14:00
14:00 15:00 Taman Sari + Pulau Kenanga + Masjid Rp7,500
15:00 16:00 Soko Tunggal
16:00 17:00 Check in Boarding Pass -
17:00 18:00
18:00 19:00
19:00 20:00
20:00 21:00
Stasiun Lempuyangan - Stasiun
21:00 22:00 Rp84,000
Kiaracondong
22:00 23:00
23:00 0:00
0:00 1:00
1:00 2:00
2:00 3:00
Istirahat
3:00 4:00
Monday, March 19, 2018
4:00 5:00 Stasiun Ke Jembatan Buah Batu RP 27,000-32.000
5:00 6:00
Naik Bis Karawang - Buahbatu Bandung Rp 32.000 - Rp50.000
6:00 7:00
7:00 8:00 Pergi ke Pabrik -
STIMASI BIAYA Keterangan TANGGAL JAM
- - 16:00 17:00
Primajasa Jurusan Garut/ Tasik 17:00 18:00
2.000 - Rp50.000 (Eko, AC Eko, Bisnis) 18:00 19:00
27,000-32.000 Grab, GoCar, Uber, Taxi 19:00 20:00
Friday, March 16, 2018
- 20:00 21:00
21:00 22:00
22:00 23:00
23:00 0:00
0:00 1:00
Rp62,000 KA Kutojaya Selatan
1:00 2:00
2:00 3:00
3:00 4:00
4:00 5:00
5:00 6:00
Rp8,000 KRD Prameks dsb 6:00 7:00
7:00 8:00
8:00 9:00
9:00 10:00
10:00 11:00
Sewa Mobil + Supir, Tiket
<Rp 500.000 11:00 12:00
Masuk + Parkir ###
12:00 13:00
13:00 14:00
14:00 15:00
15:00 16:00
RP 25.000
16:00 17:00
17:00 18:00
Rp20,000
18:00 19:00
Unpredictable 19:00 20:00
20:00 21:00
Unpredictable
21:00 22:00
22:00 23:00
Free
23:00 0:00
0:00 1:00
1:00 2:00
- -
2:00 3:00
3:00 4:00
4:00 5:00
- - 5:00 6:00
6:00 7:00
7:00 8:00
Masuk Candi, Prambanan + 8:00 9:00
Ratu Boko Rp 75.000
Rp40,000 9:00 10:00
(Transport Transjogja Rp
8.000PP) 10:00 11:00
11:00 12:00
Sunday, March 18, 2018
Sunday, March 18, 2018
12:00 13:00
Rp 7500 x 2 Jalan Kaki
13:00 14:00
14:00 15:00
Rp7,500 Jalan Kaki
15:00 16:00
- 16:00 17:00
17:00 18:00
18:00 19:00
19:00 20:00
20:00 21:00
Rp84,000 KA Kahuripan 21:00 22:00
22:00 23:00
23:00 0:00
0:00 1:00
1:00 2:00
2:00 3:00
3:00 4:00
Monday, March 19, 2018
27,000-32.000 Grab, GoCar, Uber, Taxi 4:00 5:00
Primajasa Jurusan Garut/ Tasik 5:00 6:00
2.000 - Rp50.000 (Eko, AC Eko, Bisnis) 6:00 7:00
- - 7:00 8:00
RENCANA B
KEGIATAN ESTIMASI BIAYA Keterangan
Pergi ke Rest Area 57 - -
Primajasa Jurusan Garut/ Tasik
Naik Bis Karawang - Buahbatu Bandung Rp 32.000 - Rp50.000 (Eko, AC Eko, Bisnis)
Jembatan Buah Batu ke Stasiun KAC RP 27,000-32.000 Grab, GoCar, Uber, Taxi
Check in Boarding Pass -

Stasiun Kiaracondong ke Stasiun Kutoarjo Rp62,000 KA Kutojaya Selatan

Stasiun Kutoarjo - Stasiun Rp8,000 KRD Prameks dsb


Yogyakarta/Stasiun Lempuyangan

Sewa Mobil + Supir, Tiket


Pantai Gunung Kidul <Rp 500.000 Masuk + Parkir

Tebing Breksi + Candi Ijo RP 25.000

Taman Pelangi Rp20,000

Malioboro Unpredictable

Alun-Alun Kidul DIY Unpredictable

Tugu Yogyakarta + Monumen Serangan Free


Umum 1 Maret

Istirahat - -

Sarapan di Pasar Beringharjo - -

Masuk Candi, Prambanan +


Ratu Boko Rp 75.000
Candi Prambanan Rp40,000 (Transport Transjogja Rp
8.000PP)
Keraton Yogyakarta + Museum Kereta Rp 7500 x 2 Jalan Kaki

Taman Sari + Pulau Kenanga + Masjid Rp7,500 Jalan Kaki


Soko Tunggal
Check in Boarding Pass -

Stasiun Lempuyangan - Stasiun Pasar Rp104,000 KA Gaya Baru Malam Selatan


Senen

Istirahat + Terminal Rambutan/Lebak Bulus untuk Ke Rest Area 57


RENCANA C
TANGGAL JAM KEGIATAN
16:00 17:00 Pergi ke Rest Area 57
17:00 18:00
Naik Bis Karawang - Buahbatu Bandung
18:00 19:00
19:00 20:00 Jembatan Buah Batu ke Stasiun KAC
Friday, March 16, 2018
20:00 21:00 Check in Boarding Pass
21:00 22:00
22:00 23:00
23:00 0:00
0:00 1:00
Stasiun Kiaracondong ke Stasiun Kutoarjo
1:00 2:00
2:00 3:00
3:00 4:00
4:00 5:00
5:00 6:00
6:00 7:00 Stasiun Kutoarjo - Stasiun
Yogyakarta/Stasiun Lempuyangan
7:00 8:00
8:00 9:00
9:00 10:00
Pantai Gunung Kidul
10:00 11:00
11:00 12:00
###
12:00 13:00
13:00 14:00 Candi Prambanan
14:00 15:00
15:00 16:00
Tebing Breksi + Candi Ijo
16:00 17:00
17:00 18:00
Taman Pelangi
18:00 19:00
19:00 20:00 Malioboro
20:00 21:00
Alun-Alun Kidul DIY
21:00 22:00
22:00 23:00 Tugu Yogyakarta + Monumen Serangan
23:00 0:00 Umum 1 Maret
0:00 1:00
1:00 2:00
Istirahat
2:00 3:00
3:00 4:00
4:00 5:00
5:00 6:00 Sarapan di Pasar Beringharjo
6:00 7:00
7:00 8:00
Keraton Yogyakarta + Museum Kereta
8:00 9:00
9:00 10:00 Taman Sari + Pulau Kenanga + Masjid
10:00 11:00 Soko Tunggal
11:00 12:00
Sunday, March 18, 2018
Malioboro
Sunday, March 18, 2018
12:00 13:00 Malioboro
13:00 14:00
14:00 15:00 Check in Boarding Pass
15:00 16:00
16:00 17:00
17:00 18:00
18:00 19:00
Stasiun Lempuyangan - Stasiun Pasar
19:00 20:00 Senen
20:00 21:00
21:00 22:00
22:00 23:00
23:00 0:00
0:00 1:00
1:00 2:00
2:00 3:00
3:00 4:00
Monday, March 19, 2018 Istirahat + Terminal Rambutan/Leb
4:00 5:00
5:00 6:00
6:00 7:00
7:00 8:00
ANA C
ESTIMASI BIAYA Keterangan TANGGAL
- -
Primajasa Jurusan Garut/ Tasik
Rp 32.000 - Rp50.000 (Eko, AC Eko, Bisnis)
RP 27,000-32.000 Grab, GoCar, Uber, Taxi
Friday, March 16, 2018
-

Rp62,000 KA Kutojaya Selatan

Rp8,000 KRD Prameks dsb

Sewa Mobil + Supir, Tiket


<Rp 500.000 Masuk + Parkir

###
Masuk Candi, Prambanan +
Rp40,000 Ratu Boko Rp 75.000

RP 25.000

Rp20,000

Unpredictable

Unpredictable

Free

- -

- -

Rp 7500 x 2 Jalan Kaki

Rp7,500 Jalan Kaki

Sunday, March 18, 2018


Unpredictable
Sunday, March 18, 2018
Unpredictable

Rp74,000 KA Bengawan

Terminal Rambutan/Lebak Bulus untuk Ke Rest Area 57 Monday, March 19, 2018
RENCANA D
JAM KEGIATAN ESTIMASI BIAYA Keterangan
16:00 17:00 Pergi ke Rest Area 57 - -
17:00 18:00 Primajasa Jurusan Garut/ T
Naik Bis Karawang - Buahbatu Bandung Rp 32.000 - Rp50.000
18:00 19:00 (Eko, AC Eko, Bisnis)
19:00 20:00 Jembatan Buah Batu ke Stasiun KAC RP 27,000-32.000 Grab, GoCar, Uber, Taxi
20:00 21:00 Check in Boarding Pass -
21:00 22:00
22:00 23:00
23:00 0:00
0:00 1:00
Stasiun Kiaracondong ke Stasiun Kutoarjo Rp62,000 KA Kutojaya Selatan
1:00 2:00
2:00 3:00
3:00 4:00
4:00 5:00
5:00 6:00
6:00 7:00 Stasiun Kutoarjo - Stasiun Rp8,000 KRD Prameks dsb
Yogyakarta/Stasiun Lempuyangan
7:00 8:00
8:00 9:00
9:00 10:00 Sewa Mobil + Supir, Tike
Pantai Gunung Kidul <Rp 500.000
10:00 11:00 Masuk + Parkir
11:00 12:00
12:00 13:00
Masuk Candi, Prambanan
13:00 14:00 Candi Prambanan Rp40,000 Ratu Boko Rp 75.000
14:00 15:00
15:00 16:00
Tebing Breksi + Candi Ijo RP 25.000
16:00 17:00
17:00 18:00
Taman Pelangi Rp20,000
18:00 19:00
19:00 20:00 Malioboro Unpredictable
20:00 21:00
Alun-Alun Kidul DIY Unpredictable
21:00 22:00
22:00 23:00 Tugu Yogyakarta + Monumen Serangan Free
23:00 0:00 Umum 1 Maret
0:00 1:00
1:00 2:00
Istirahat - -
2:00 3:00
3:00 4:00
4:00 5:00
5:00 6:00 Sarapan di Pasar Beringharjo - -
6:00 7:00
7:00 8:00
Keraton Yogyakarta + Museum Kereta Rp 7500 x 2 Jalan Kaki
8:00 9:00
9:00 10:00 Taman Sari + Pulau Kenanga + Masjid Rp7,500 Jalan Kaki
10:00 11:00 Soko Tunggal
11:00 12:00
Malioboro Unpredictable
12:00 13:00 Malioboro Unpredictable
13:00 14:00
14:00 15:00 Check in Boarding Pass -
15:00 16:00
16:00 17:00
17:00 18:00
18:00 19:00
19:00 20:00 Stasiun Lempuyangan - Stasiun Bekasi Rp125,000 KA Pogo
20:00 21:00
21:00 22:00
22:00 23:00
23:00 0:00
0:00 1:00
1:00 2:00
2:00 3:00
3:00 4:00
Istirahat + Terminal Rambutan/Lebak Bulus untuk Ke Rest Area 57
4:00 5:00
5:00 6:00
6:00 7:00
7:00 8:00
Keterangan
-
Primajasa Jurusan Garut/ Tasik
(Eko, AC Eko, Bisnis)
Grab, GoCar, Uber, Taxi

KA Kutojaya Selatan

KRD Prameks dsb

Sewa Mobil + Supir, Tiket


Masuk + Parkir

Masuk Candi, Prambanan +


Ratu Boko Rp 75.000

Jalan Kaki

Jalan Kaki
KA Pogo

Rest Area 57

You might also like