Fukushima Daiichi Nuclear Power Plant: Site Radiation Monitoring Data

(Plant site Main Gate、Admin. Building North、West Gate, MP-4)


Institute of Sustainable Energy Policies(ISEP), Japan
March 20th, 2011
Reference TEPCO Press release: Fukushima Daiichi Nuclear Power Plant Updates
http://www.tepco.co.jp/nu/monitoring/in(Japanese Only) Update: 7:30 March 20th, 2011
Fukushima Daiichi Site Radiation dose rate[gamma ray] (March 12-20, 2011)
* Attention to Logarithmic vertical scale
No.2 Hydrogen  No.4 Fire Water discharge to No.3
100000 No.3 Moisture release
detonation (15th9:38) (18th14:00,
(15th6:14) (16th8:00) 19th 0:30,17:30‐20th3:40)
No.1 Hydrogen 
detonation
Radiation dose rate[μSv/h]
/h]

10000 No.3Hydrogen
(12 h15 36)
(12th15:36) detonation
(14th11:01)
1000

100
Main Gate
Admin Building North
10
West Gate
MP4
1
0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00
3/12 3/13 3/14 3/15 3/16 3/17 3/18 3/19 3/20
DATE/TIME

*Graph ofFukushima
Linear vertical scale
Daiichi Site Radiation dose rate[gamma ray] (March 12-20, 2011)
No.4 Fire Main Gate
14000 (15th9:38) No.3 Moisture release
(16th8:00) Admin. Building North
12000 c West Gate
h]
Radiation dose rate[μSv/h]

No.2 Hydrogen 
detonation MP4
10000
(15th6:14) Water feed to No.3
8000 (18th14:00,19th 0:30,17:30‐
*Lenear vertical scale
20th3:40)
6000 c c c
No.3Hydrogen
No.1 Hydrogen  detonation
4000 detonation (14th11:01)
(12th15:36) c
2000

0
0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00
3/13 3/14 3/15 3/16 3/17 3/18 3/19 3/20
3/12
TIME

Administration Building
North

Main Gate

West Gate