Fukushima Daiichi Nuclear Power Plant: Site Radiation Monitoring Data

(Plant site Main Gate、Admin. Building North、West Gate, MP-4)


Institute of Sustainable Energy Policies(ISEP), Japan
March 19th, 2011
Reference TEPCO Press release: Fukushima Daiichi Atomic Power Plant Updates
http://www.tepco.co.jp/nu/monitoring/index-j.html (Japanese Only)
Update: 11:00 March 19th, 2011
* Attention to Logarithmic vertical scale
Fukushima Daiichi Site Radiation dose rate[gamma ray] (March 12-19
12-19, 2011)
No.4 Fire Water feed to No.3
100000 No.3 Moisture release
(15th9:38) (18th14:00,
(16th8:00)
No.1 Hydrogen  No.2 Hydrogen  19th 0:30)
detonation detonation
n dose rate[μSv/h]

10000 (15th6:14)
(12th15:36)
No.3Hydrogen
detonation
1000 (14th11:01)

100
Radiation

Main Gate
Admin Building North
10
West Gate
MP4
1
0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00
3/12 3/13 3/14 3/15 3/16 3/17 3/18 3/19
DATE/TIME

*Graph of Linear vertical scale

Fukushima Daiichi Site Radiation dose rate[gamma ray] (March 12-19, 2011)
No.4 Fire Main Gate
14000 (15th9:38) No.3 Moisture release
(16th8:00) Admin. Building North
No.2 Hydrogen 
12000 detonation c West Gate
diation dose rate[μSv/h]

(15th6:14) MP4
10000
Water feed to No.3
8000 No.3Hydrogen (18th14:00,
No.1 Hydrogen  detonation 19th 0:30)
detonation (14th11:01)
6000 (12th15:36) c c
Radiation

c
4000

2000

0
0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00
3/12 3/13 3/14 3/16 3/17 3/18 3/19
TIME
3/15

Administration Building
North

Main Gate

West Gate