You are on page 1of 6

Confidential

7. Annexure [7]
Documentation Requirements

Bidder’s Response (to be filled up by the Bidder)


Solution Type:
(Bidder shall mention their
solution type for each
Specificatio requirement)
Complied Response Explanation
n as
/ SUP
Supported as delivered
Impact offered by “Out of the Box”
Not Supported through an
the bidder
Specification of the item(s) as per Robi Complied PSUP integrated partner
(Critical/ (Offered/N solution
(bidder
SL requirement ot Offered) Supported through add-
shall PADD on products offered by
Major/ (bidder shall mention partner
mention their
Supported via
whether they Modification of existing
Minor) compliance MOD products (screen
offer or not
statement configuration, report,
offer each for each
GUI tailoring, etc)
requirement Supported via a 3rd party
requiremen 3RD
solution
into their
t) Supported via
solution) CST customization (changes
to source code)
Will be supported in
FUT
future
NS Not Supported

Documentation Requirements:
Bidder shall submit different types of documents to Robi for each of the project phase. The list of
documents against each of the project phase has been attached below:

1. Project Kick-off Phase:

1. Project Charter Critical

2. WBS and Responsibility Matrix

Responsibility Critical
Matrix.docx
(RACI)

3. Project Schedule with key milestones Critical

4. Risk Register

Project Risk Solution Risk


Critical
Register.xlsx Assessment.xlsx

5. Project Communication plan


Critical

Robi Axiata Limited Page 1 of 6


RCO, 53 Gulshan South Avenue, Gulshan-1, Dhaka-1212, Bangladesh.
Confidential
7. Annexure [7]
Documentation Requirements
6. Non-Discloser Agreement (if
Applicable) Critical

7. Information Security Checklist


Vendor Compliance Critical

8. Unit Test (Test Cases) Critical

9. Features Specification (FS)


Critical

10. System Architecture


Critical

11. Functional Specification


Critical

12. Technical specification


Critical

13. Product Life Cycle Roadmap


Critical

14. Bandwidth requirement


Major

15. Data migration plan and Strategy


Critical

16. Sizing / capacity plan


Critical

17. Disaster recovery plan


Critical

18. Annual Maintenance Contract (AMC)


Critical

19. Data Flow documents


Critical

20. Alarm, error-codes, log documents


Critical

21. Vendor internal QA Document


(Signed) Critical

22. Vendor Internal Unit Test and UAT


Document (Signed) Critical

Robi Axiata Limited Page 2 of 6


RCO, 53 Gulshan South Avenue, Gulshan-1, Dhaka-1212, Bangladesh.
Confidential
7. Annexure [7]
Documentation Requirements
23. End User Manual Solution
Implementation steps
Critical
Manual/Document

24. Database Access control matrix


(Oracle)

Critical
Access Control
Matrix for Oracle.xlsx

25. Access control matrix for Linux.

Critical
Access Control
Matrix for Linux.xlsx

26. Approved User Access request


Process Critical

27. Approved Resource Allocation


Critical
Process

28. Fit gap analysis document Critical

29. Unit, stress/volume and integration


Critical
test scripts

30. Training plan Critical

31. Cut-over strategy & plan Critical

32. Rollback strategy & plan Critical

33. Business process procedure master


Critical
list

34. Business Blue Print Critical

During Project Rollout/Implementation


2.
Phase:

1. UAT Exercise (Test cases) Critical

Robi Axiata Limited Page 3 of 6


RCO, 53 Gulshan South Avenue, Gulshan-1, Dhaka-1212, Bangladesh.
Confidential
7. Annexure [7]
Documentation Requirements
2. Performance/Load Test Report
Critical

3. Approved Project Change Requests

Approved Change
Critical
Request Template.docx

4. Quality Acceptance Document Critical

5. Quality assurance checkpoints Critical

Just before the RFS stage (Ready For


3.
Service):

1. Control Exception Justification


approval and roadmap
Critical
Security Control
Exception Justification.doc

2. Technical Inventory List

Critical
Asset Inventory
List.xlsx
3. Evidence of Information Security
Implementation Critical

4. Evidence of Operating Systems


Hardening Checklist (Unix)

Critical
Linux Unix Hardening
Checklist.docx

5. Project Exception/snag
justification/Security Critical

6. Evidence of Database Hardening


Critical
Checklist (Oracle)

Robi Axiata Limited Page 4 of 6


RCO, 53 Gulshan South Avenue, Gulshan-1, Dhaka-1212, Bangladesh.
Confidential
7. Annexure [7]
Documentation Requirements

Oracle Hardening
Checklist.docx

7. Evidence of Application Hardening


Critical
Checklist

8. Operation manual Critical

9. Administration Procedure: Proactive


Critical
activities, Housekeeping, etc.

10. Provisioning & De-provisioning


Activities list & procedure (User &
Critical
Service).

11. Reactive Operation procedure Critical

12. General Operational activities list &


Critical
procedure

13. Data retention and archival process

Critical
Data Retention
Plan.docx

14. Baseline parameter setting report


Critical

15. Fault Management : Alarm window,


Critical
Notification & Rectification

16. Performance Management: KPI


Critical
window, Notification & Rectification

17. Application & DB Backup and


Critical
Restore procedure

18. All Software Licenses & Media kits Critical

19. Technical Soft Document Critical

Robi Axiata Limited Page 5 of 6


RCO, 53 Gulshan South Avenue, Gulshan-1, Dhaka-1212, Bangladesh.
Confidential
7. Annexure [7]
Documentation Requirements
20. Operation and Maintenance Training
Materials- Hard and Soft Format Critical

21. Go live verification check report. Critical

22. System failure test plan Critical

23. Script (for known issues) for service


Major
desk

24. Supplier must handed over all data


including source code, configuration
Critical
files and other related information to
Robi

4. After RFS stage (Ready For Service):

1. Project End Report

Project End
Critical
Report.docx

2. Project Evaluation Document Critical

Robi Axiata Limited Page 6 of 6


RCO, 53 Gulshan South Avenue, Gulshan-1, Dhaka-1212, Bangladesh.

You might also like