You are on page 1of 12

February (17) January 2019 (18) December 2018 (19)

4
3
2
1
5
4
3
2
1
4
3
2
1
Month Week
August (11) July (12) June (13) May (14) April (15) March (16)

3
2
1
5
4
3
2
1
4
3
2
1
5
4
3
2
1
4
3
2
1
4
3
2
1
March (4) February (5) January 2020 (6) December 2019 (7) November (8) October (9) September (10) August (11

2
1
4
3
2
1
5
4
3
2
1
4
3
2
1
4
3
2
1
5
4
3
2
1
4
3
2
1
4
July (0) June (1) May (2) April (3) March (4)

5
4
3
2
1
4
3
2
1
4
3
2
1
5
4
3
2
1
4
3
Tasks

Familiarize with OpenFOAM using an existing tutorial case (motorBike) and setup a 3D flat plate baseli

Attach foam to both sides of ramp and install into the test section / Quick run to check

Fixing NSCC script

Oil Flow Visualization experiments of single pair VGs on the 30deg ramp

14-16 Dec: NSCC system maintenance

Setup a 3D flat plate baseline case using uniform velocity inlet

Oil Flow Visualization experiments of single pair VGs on the 20deg ramp

Return test section on 24 Dec

Simulation a 3D flat plate baseline case using parabolic velocity inlet

Design 10deg ramp

New Year (29 Dec – 1Jan)

Simulation of skew VGs (0, 10, 20, 30 deg) on a flat plate

Start preparing ETC17 abstract

Simulation of a baseline ramp

Simulation of skew/non-skew VGs (0, 10, 20, 30 deg) on 20deg ramp

Get back the test section on 18 Jan

Oil Flow Visualization experiments of multiple skew VGs on the ramp (2 weeks)

Finishing ETC17 abstract

31 January: Deadline for ETC17 abstract submissions

Chinese New Year (5-6 Feb)

Stereo-PIV setup and experiments of multiple skew VGs on the ramp (2 weeks),Post-processing of PIV

Prepare LES simulation case of the baseline ramp

Oil Flow Visualization experiments of Wishbone VGs (2 weeks)

LES simulation of the baseline ramp

Prepare LES mesh of multiple skew VGs on the ramp

Oil Flow Visualization experiments of multiple Wishbone VGs (2 weeks)


Oil Flow Visualization experiments of multiple Wishbone VGs (2 weeks)

Post-processing of LES baseline result and PIV results

Stereo-PIV setup and experiments of multiple skew Wishbone VGs on the ramp

LES simulation of multiple skew VGs on the ramp

ETC17 Notification of acceptance and opening of registrations: April 2, 2019

Post-processing of LES multiple skew VGs result

Deadline for early bird registration: May 5, 2019

Leonardo progress report early submission

31 May: ETC17 Deadline for registration

RANS simulations of the helicopter for the optimization of the VGs positioning and configuration

Deadline for Leonardo progress report submission

Deadline for NTU 3rd year annual report submission


ETC17 (3-6 Sep) in Torino, Italy

Thesis manuscript preparation


Thesis manuscript submission

Deadline for Thesis submission

End of Scholarship
Remarks

ü / Fixing NSCC script